Loading...
HomeMy WebLinkAbout09-04-26 Public Comment - S. Bieluch - Traffic Study Falsification & Sub-Standard Alley Demands – Application No. 23245 (811 W. Mendenhall)From:Scott Bieluch To:Bozeman Public Comment; cityclerksdepartment@bozemanmt.gov Subject:[EXTERNAL]Traffic Study Falsification & Sub-Standard Alley Demands – Application No. 23245 (811 W. Mendenhall) Date:Friday, September 4, 2026 12:18:07 PM CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Subject: FORMAL INFRASTRUCTURE OBJECTION: Traffic Study Falsification & Sub- Standard Alley Demands – Application No. 23245 (811 W. Mendenhall) NOTICE OF DELIVERY FAILURE / REQUEST FOR ADMINISTRATIVE FORWARDING: Please accept this formal technical objection for the public record regarding Application No. 23245 (811 W. Mendenhall). My direct emails to the specificdepartments involved repeatedly failed due to an automated server error ("550 5.4.1 Recipient address rejected: Access denied") on the city’s network. Because this is a time-sensitive infrastructure matter, I respectfully request that the City Clerk's office forward this complete message directly to the Engineering Department, the Directorof Transportation, the Streets Division, and specifically to staff members Anna Bentley (abently@bozemanmt.gov) and Greg Sullivan (gsullivan@bozemanmt.gov). Thank you for ensuring this reaches the appropriate reviewers. To the Bozeman Engineering Department, Director of Transportation, and Streets Division,I am writing to register a formal technical objection regarding the inadequate traffic planning and severe right-of-way deficiencies under Application No. 23245 (811 W. Mendenhall Mixed-Use Project). As a long-time resident of 805 W. Lamme Street, I demand that the Engineering Department withhold infrastructure and site plan sign-offs until a comprehensive, independent audit of the developer’s Traffic Impact Study (TIS) trip distribution model and the adjacent unpaved alleyway is executed. I. FRAUDULENT TRIP DISTRIBUTION MODELING & NEIGHBORHOOD SAFETY RISKS The developer’s TIS states that the 95-unit project will introduce an additional 435daily vehicle visits to the immediate area. However, the study relies on a highly unrealistic engineering assumption: claiming that ninety percent (90%) of all departing vehicles will exit exclusively onto the one-way corridor of West Mendenhall Street.This assumption defies basic local driving behavior. In reality, a massive percentageof the project's resident and delivery traffic will naturally exit north into the alleyway directly connecting to West Lamme Street to head north or west out of Midtown. By artificially shifting 90% of the traffic metrics onto Mendenhall, the developer hasintentionally hidden the severe logistical impacts this project will have on WestLamme Street. Dumping hundreds of daily vehicles directly onto a narrow, historic residential street creates an unmitigated safety hazard for local families and neighborhood children,while severely disrupting the ability of existing property owners to safely exit theirown driveways. II. EXPOSURE OF SUB-STANDARD ALLEY INFRASTRUCTURE (WEST OF N. 8TH AVE) The developer’s site plan relies heavily on the existing public alleyway west of North 8th Avenue for vehicle egress. This right-of-way is fundamentally sub-standard andcompletely incapable of handling high-density commercial or multi-family residential volume in its current state: Geometrical Constraints: Due to decades of unmitigated vegetation overgrowth and structural neglect, the alleyway is currently narrowed down to a single-vehicle width, completely preventing two vehicles from safely passing each other. Catastrophic Winter Maintenance Failures: The city’s Streets Division does not regularly plow or maintain this unpaved alleyway during winter months. Vehiclesroutinely become heavily high-centered and stuck in deep snowpack multiple times every single winter. Forcing an additional 435 daily vehicle trips onto an unpaved, single-lane, unplowed dirt track will cause systemic gridlock, prevent emergency vehicle (Fire/EMS) access,and force neighborhood residents to bear the logistical costs of a developer's negligence. III. MANDATORY ADMINISTRATIVE DEMANDS Pursuant to Bozeman design standards and infrastructure regulations, I demand thatthe City of Bozeman execute the following actions prior to granting any approvals for Application No. 23245: 1. Order a comprehensive, independent rewrite of the Traffic Impact Study’s trip distribution model, factoring in a realistic 50/50 exit distribution split betweenWest Mendenhall and West Lamme Street. 2. Require the developer, as a mandatory condition of development, to fully fund the physical widening, structural paving, and public utility integration of the entire alleyway west of North 8th Avenue. 3. Require the city to formally re-classify this alleyway on the municipal wintermaintenance schedule to guarantee regular, heavy-duty snow plowing. The City of Bozeman cannot legally allow a private developer to destroy neighborhood safety and overload sub-standard public infrastructure to maximizeout-of-state corporate profits.Respectfully submitted, Scott Bieluch 805 W. Lamme StreetBozeman, MT 59715