Loading...
HomeMy WebLinkAbout023_L3.1-IRRIGATION PLANE GAS WWWWSSSSSSWWWWE E E E E E E E E E E EEG A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A SGAS GASE E E E EEEEEEEEETTTTTTTT TSDSDSDSDSD SD SD SD SD SD EE E E W W W W E GASE E E E E E E E E E E EEG A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A S G A SGAS GAS115.9 1" 20.45 1" 311.7 1" 412.0 1" 51.59 1" 70.6 1" 612.5 1" 1" 1"1" 1" 1" 1" 1" 1" DERG ER DNETTESI EPAC S IHACR 127 ROBINSON STACEY T.ALTCA NATNOM c Job Code: Drawn By: Checked By: Issue Date: Revision Date -- -- 07/17/263. CITY COMMENTS 07/02/262. CITY COMMENTS 05/13/261. HOA COMMENTSIRRIGATION PLAN03.30.2026 AM MV 2609 2026 LAND DESIGN, INC. L3.1 3480 PRINCE LANE - BOZEMAN, MTKOHD SHOPIRRIGATION PLAN 0 feet40 1" = 20' 20 60 N STORMWATER DETENTION BASIN CONNECT TO EXISTING IRRIGATION SYSTEM MAINLINE. LOCATION IS APPROXIMATE, CONTRACTOR TO FIELD VERIFY. REPAIR EXISTING IRRIGATION AS REQUIRED. ADJUST HEADS FOR OVER-SPRAY. PRESERVE/REPAIR IRRIGATION IN TRAIL CORRIDOR CONNECT IRRIGATION ZONES TO EXISTING CONTROLLER. EXPAND CONTROLLER AS NECESSARY. PROPOSED PAVING PROPERTY BOUNDARY PROJECT EXTENTS 3' PROPERTY SETBACK 10' UTILITY EASEMENT PROJECT EXTENTS EXISTING EVERGREEN TREE, TYP. EXISTING TREE, TYP. PROPOSED BUILDING, SEE ARCHITECTURE PROPOSED BUILDING, SEE ARCHITECTURE EXISTING SITE TO REMAIN TRAIL SETBACK EXISTING SHRUB, TYP. VISION TRIANGLE EXISTING TRAIL 3 ZONE 1 WATERCOURSE SETBACK BOUNDARY ZONE 2 WATERCOURSE SETBACK BOUNDARY