Loading...
HomeMy WebLinkAbout017_C4.1-CONST MANAGEMENTEG G G G GGGGGGGSSSSSSSSSSSSSSSSSSSSSSWWWWWWWWWWWSDSDSDEEEEWWWWEWWWWSSSSSSWWWWEEEEEEEEEEEE E GGGGGGGGGGG G 459.65391.09343.8211"X17": 1"= 40 ftNGRAPHIC SCALE1 inch = ft.0( IN FEET )10202020HEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2026VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYH:\2035\004\ACAD\SHEETS\SITE PLANS.dwg Plot Date: 4/24/2026 12:20 PM© HEADWATERS ENGINEERING, INC.REVISION DATE:1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718HEADWATERSMT.NET406-581-5730PROJECT LOCATIONMONTANABOZEMAN04/24/2026RECONSTRUCTION MANAGEMENT PLAN3480 PRINCE LANEKAUFMANN'S OVERHEAD DOOR, INC.2035.004C4.1LOT 16, BLOCK 42.14 ACRESLOT 17, BLOCK 40.97 ACRESLOT 18, BLOCK 40.95 ACRESEXISTING 25' PUBLIC TRAIL EASEMENTPER DOC. #2704913EXISTING 10' UTILITY EASEMENTPER DOC. #2704913PROPOSEDPAVEMENT(PHASE 1)PROPOSEDBUILDING 1EXISTING BUILDINGEXISTING BUILDINGEXISTING TRUCKLOADING RAMPEXISTING 12" CULVERTEXISTING CONCRETEBOX CULVERTPRINCE LANECOMMON OPENSPACE 2EXISTING POWERTRANSFORMERSEXISTING GAS LINEPROPOSED POWER & GAS SERVICESPROPERTY BOUNDARYPROPERTY BOUNDARYEXISTING SIDEWALK20' SETBACKEXISTINGTREES, TYP.CATTAIL CREEKPROPOSED TURN WIDENING(PHASE 1)100' - 0"30' - 0"EXISTING WETLANDEDGE, TYP.50' WATERCOURSE SETBACKPRINCE LANEEXISTING SEWER MAINEXISTING WATER MAINFUTURE WATER, FIRE& SEWER SERVICESEXISTING TRASH & RECYCLEDUMPSTERSPHASE 1PHASE 2PH A S E 1 EXISTI N G PHASE 25' CONCRETE SIDEWALK(PHASE 2)PROPOSED POWER & GAS SERVICES3' SETBACKVISION TRIANGLEVISION TRIANGLEPHASE 1 CONSTRUCTIONPHASE 2 CONSTRUCTIONPROPOSEDSTORM PONDEXPANSIONPROPOSED BUILDING 2120' X 50'PHASE 1 EQUIPMENT &MATERIAL STAGING AREAPHASE 1CONSTRUCTIONTRASHCONTAINERPHASE 1PHASE 1 CONSTRUCTION MANAGEMENT NOTES:1.EXCAVATED SPOIL MATERIAL MAY BE STOCKPILED WITHIN BUILDING 2 FOOTPRINTTEMPORARILY AS IT IS BEING HAULED OFF SITE.2.ALL CONSTRUCTION TRAFFIC MUST ACCESS THE SITE ON PAVED SURFACES ORWITHIN THE FOOTPRINT OF PROPOSED PARKING LOTS/BUILDINGS.3.STAGING OF EQUIPMENT AND MATERIALS MUST REMAIN OUTSIDE THEWATERCOURSE SETBACK AS SHOWN.CONSTRUCTION ENTRANCE