Loading...
HomeMy WebLinkAbout016_Phasing narrative 1105 REEVES RD. WEST, SUITE 6 BOZEMAN, MT 59718 406-581-5730 www.headwatersmt.net Page 1 of 1 KOHD – COB #26277 Phasing Narrative The proposed project is planned to be broken into two phases. Since the timeline for the second phase is not known at this time, the applicant plans to submit a separate site plan submittal for building 2 which will be evaluated against the current UDC at the time of submittal. Building 2 is shown on the provided civil sheets to help paint the picture of site layout and to show proof of concept for the completed site. Phase 1 is planned to include the necessary parking lot improvements and stormwater infrastructure for both buildings. Phase 1 will also include the bike racks, ADA parking, building 1 construction, power & gas for phase 1 and all necessary landscaping for the site not directly associated with building 2. Occupancy of building 1 will occur at the completion of phase 1. Phase 2 will include the construction of building 2, the adjacent sidewalk to building 2, the trail connection, water, sewer & fire services for building 2, power & gas to building 2 and landscaping directly associated with building 2. Occupancy of building 2 will occur at the completion of phase 2. H:\2035\004\DOCS\SITEPLAN\PHASE 2\Phase plan.docx