HomeMy WebLinkAboutPines Phase 2 Boulevard and Sidewalk Site PlansNo.
REVISIONSFile Name: IMEG Project No: Date: Drawn By: Checked By: Sheet of DESCRIPTION DATECOPYRIGHTALL RIGHTS RESERVEDC22003609.01 AB INF1.0 BOULEVARD SW.dwg2026Field Book No:1143 STONERIDGE DR
SUITE 1
BOZEMAN, MT 59718
PH: 406.582.9901
www.imegcorp.com
N/ATHE PINES PHASE 2
BOZEMAN, MT
BOULEVARD & SIDEWALK SITE PLAN22003609.01PRBEG8/11/2026INF1.013AS-BUILT INFRASTRUCTURE PLANSISSUED: 8/11/2026AS-BUILT NOTES1.AS-BUILT RECORD DRAWINGS BASED ON SITE SURVEY CONDUCTEDBY IMEG ON 7/10/2026.2.AS-BUILT INFORMATION DISPLAYED ON PLAN IN RED.
No.
REVISIONSFile Name: IMEG Project No: Date: Drawn By: Checked By: Sheet of DESCRIPTION DATECOPYRIGHTALL RIGHTS RESERVEDC22003609.01 AB INF2.0 FIRELINE.dwg2026Field Book No:1143 STONERIDGE DR
SUITE 1
BOZEMAN, MT 59718
PH: 406.582.9901
www.imegcorp.com
N/ATHE PINES PHASE 2
BOZEMAN, MT
FIRE LINE PLAN & PROFILE22003609.01PRBEDG8/11/2026INF2.023GENERAL NOTES - FIRE SERVICE LINESBENCHMARKLEGAL DESCRIPTIONLEGENDSURROUNDING PROPERTY LINETOP OF SET MAG NAIL (CP#50)ELEVATION 4857.45 FEETDATUM:(NAVD88)RUSTIC HOME, LLCC/O BRIAN ZONNEFELD625 S 19TH AVE, BOZEMAN MT, 59715KIRK SUB, S11, T02 S, R05 E, ACRES 0.44, TRACT 2A PLAT F-1-D(FORMERLY TR 2 COS2096)SANITARY/STORM CLEANOUTEASEMENT LINEHYDRANTWATER VALVEPROPERTY LINEOVERHEAD ELECTRICGAS LINEUNDERGROUND ELECTRICTELEPHONE LINEFIBER OPTIC CABLEWATER LINETELEVISION LINEUTILITY LINEFIRE WATER LINESETBACK LINEFIRE SERVICE PROFILEFIRE SERVICE PLANAS-BUILT INFRASTRUCTURE PLANSISSUED: 8/11/2026
LEGENDFLANGED OS&Y VALVEDOUBLE CHECK VALVE (MIN.REQUIREMENT) AS INDICATEDON APPROVED PLAN(S)CITY OF BOZEMAN REQUIREMENTS FOR INSTALLATION OFDOUBLE CHECK VALVE ASSEMBLY1.THE FIRST FITTING INSIDE OF THE BUILDING SHALL BE A UL-LISTED FLANGEDKENNEDY OR MUELLER OS&Y VALVE THE SAME SIZE AS THE FIRE SERVICE LINE.2.ALL DOUBLE CHECK VALVE ASSEMBLIES SHALL BE:A.UL OR FM LISTEDB.APPROVED BY THE UNIVERSITY OF SOUTHERN CALIFORNIA FOUNDATION FORCROSS CONNECTION CONTROL AND HYDRAULIC RESEARCH (USCFCCCHR) FOROPERATION IN THE PROPOSED POSITION (VERTICAL OR HORIZONTAL) AS SHOWNON APPROVED PLANS.C.INSTALLED AS SHOWN ON THE APPROVED PLANS.3.A FLOW DETECTION DEVICE SHALL BE INSTALLED IMMEDIATELY FOLLOWING THEDOUBLE CHECK VALVE ASSEMBLY (ALARM CHECK VALVE, FLOW SENSOR/ALARM,METER, ETC.) AS SHOWN ON THE APPROVED PLANS. PADDLE-TYPE FLOW ALARMSARE NOT PERMITTED ON DRY SYSTEMS.4.A DOUBLE DETECTOR CHECK VALVE ASSEMBLY MAY BE USED WITH A STANDARDCITY OF BOZEMAN METER. THE METER LOOP OF THE DOUBLE DETECTOR CHECKVALVE SHALL HAVE A DOUBLE CHECK VALVE ASSEMBLY INSTALLED WHICH MEETSTHE SAME INSTALLATION CRITERIA SPECIFIED ABOVE IN REQUIREMENT NUMBERTWO.5.HORIZONTAL INSTALLATIONS MUST BE A MINIMUM OF 2' ABOVE THE FINISHED FLOOR.6.THE FIRE SERVICE RISER MUST BE A MINIMUM OF 2' FROM ANY OUTSIDE WALL, AND AMINIMUM OF 1' FROM ANY INTERIOR WALL.7.THE INCOMING FIRE SERVICE LINE SHALL BE A MINIMUM OF 6.5', AND A MAXIMUM OF7.5' BELOW THE FINISHED GRADE.8.ALL FIRE SERVICE LINE APPURTENANCES SHALL HAVE A MINIMUM PRESSURE RATINGOF 175 PSI.9.ALL FIRE SERVICE LINES 4" AND LARGER SHALL BE CLASS 51 DUCTILE IRON PIPE.10.LINE SIZING: THE DOUBLE CHECK VALVE ASSEMBLY SHALL BE EQUAL IN SIZE TOBOTH THE INCOMING PIPE DIAMETER (UPSTREAM) AND OUTGOING PIPE DIAMETER(DOWNSTREAM).ONLY FITTINGS ALLOWED BETWEEN FIRST OS&Y VALVEAND BACKFLOW ASSEMBLY TO BE 90° BEND.NO PRESSURE GAUGES ORPRESSURE GAUGE FITTINGS WILLBE ALLOWED ON THE TEST PORTSOF ANY BACKFLOW ASSEMBLY.FLANGE TO BE THREADED ON STANDPIPE, M.L.TO FLANGE ADAPTORS NOT ACCEPTABLE (TYP.FOR ALL RISER CONFIGURATIONS)1' MIN., 2' MAX. ABOVEFINISHED FLOORFLOOR3/4" MIN. REDI ROD, INSTALLED IN EVERY OTHER AVAILABLE M.J. BOLT HOLE(TYP.). 5/8" RODS ACCEPTABLE FOR 4" LINES.90° BEND WITH THRUST BLOCK4" OR LARGER CLASS 51DUCTILE IRON PIPE (TYP.)MECHANICALJOINTMAINTHRUSTBLOCKTAPPING TEE & VALVE, ORINSTALL VALVE AT PROPERTYLINE (TYP. FOR ALL RISERCONFIGURATIONS).PROVIDE FLEXIBLE,WATER-TIGHTCONNECTION FOR ALLWALL OR FLOOR PIPEPENETRATIONS.10' MAX. *1' MIN., 2' MAX.ABOVE FINISHEDFLOORMECHANICALJOINTFLOOROUTSIDE WALL90° BEND WITHTHRUST BLOCK1' MIN., 2' MAX.2' MIN., 3' MAX. CLEARANCEABOVE FINISHED FLOORWALLCOATEDSTEEL WALLPLATE, 5/16"MIN.THICKNESS*PER NPPA-24 FIG. A.10.6.3.1.SECTION A - ANo.
REVISIONSFile Name: IMEG Project No: Date: Drawn By: Checked By: Sheet of DESCRIPTION DATECOPYRIGHTALL RIGHTS RESERVEDC22003609.01 AB INF2.0 FIRELINE.dwg2026Field Book No:1143 STONERIDGE DR
SUITE 1
BOZEMAN, MT 59718
PH: 406.582.9901
www.imegcorp.com
N/ATHE PINES PHASE 2
BOZEMAN, MT
INFRASTRUCTURE DETAILS22003609.01PRBEDG8/11/2026INF3.033THRUST BLOCK DETAILSTANDARD FIRE SERVICE LINE INSTALLATION (CLASS I, II & III)DRIVE APPROACH, ARTERIAL WITH BOULEVARD NO. 02529-5BAS-BUILT INFRASTRUCTURE PLANSISSUED: 8/11/2026