Loading...
HomeMy WebLinkAboutSimkins-Hallin Tract 3-B Infrastructure PlansFILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION a sanderson bellecci company 21363.01 -- - - - - - - - - - - - - RECORD DRAWINGS06/13/2025 CS 21363_01_COVER.DWG RPE VICINITY MAP SITE NORTH PROJECT NO: SIMKINS-HALLIN INC. BOZEMAN, MT 59715 326 N BROADWAY AVENUE BOZEMAN, MT PREPARED FOR: SIMKINS-HALLIN TRACT 3-B INFRASTRUCTURE PLANS NORTH PARK SIMKINS-HALLIN SITE DEVELOPMENT WHEAT DRIVE 21363.01 RECORD DRAWINGS C1.1106 East Babcock, Suite L1 Bozeman, Montana 59715 406.522.9876 sandersonstewart.com LAND USE MAP ZONING MAP FUTURE LAND USE MAP Sheet List Table SHEET TITLE SHEET NUMBER C1.1 COVER 1 C1.2 LEGEND, NOTES, AND ABBREVIATIONS 2 C2.1 EXISTING SITE AND DEMOLITION PLAN 3 C3.1 OVERALL SITE AND UTILITY PLAN 4 C4.1 SEWER MAIN PLAN AND PROFILE STA 100+00-102+00 5 C5.1 WATER MAIN PLAN AND PROFILE STA 200+00-204+50 6 C5.2 WATER MAIN PLAN AND PROFILE STA 204+50-206+75 7 C5.3 WATER MAIN PLAN AND PROFILE STA 200+00-201+50 8 C5.4 MILLWORK BUILDING FIRE SERVICE PLAN AND PROFILE 9 C5.5 MECHANIC BUILDING FIRE SERVICE PLAN AND PROFILE 10 C6.1 CONSTRUCTION DETAILS 11 C6.2 CONSTRUCTION DETAILS 12 P:\21363_01_Simkins_North_Park_Site_Plan\CADD_C3D\PRODUCTION_DWG\TRACT 3-B\INFRASTRUCTURE\21363_01_COVER.dwg, C1.1, 7/16/2025 10:05:28 AM, abelluscio, 1:1 FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONa sanderson bellecci companyWHEAT DRIVELEGEND, NOTES, AND ABBREVIATIONSSIMKINS-HALLIN TRACT 3-B INFRASTRUCTURE PLANSNORTH PARK SIMKINS-HALLIN SITE DEVELOPMENTBOZEMAN, MTC1.2 RPE21363_01_COVER.DWGCS06/13/2025RECORD DRAWINGS--------------21363.01RECORD DRAWINGSCATCH CURB SPILL CURB TRANSITION FROM CATCH TAPER CURB HEAD 3' TO SPILL CURB GRADING PLAN ELECTRIC JUNCTION BOX EXISTING STORM DRAIN MANHOLE EXISTING CATCH BASIN SIGN POWER POLE EXISTING WATER VALVE EXISTING FIRE HYDRANT BOLLARD BUSH EXISTING CURB STOP FIRE DEPT. CONNECTION FIBER OPTIC PEDESTAL GAS METER GAS MANHOLE GAS VALVE GUYWIRE IRRIGATION VALVE IRRIGATION BOX LIGHT POLE POWER METER POWER MANHOLE ELECTRIC PEDESTAL ROOF DRAIN SIGNAL POLE EXISTING SANITARY SEWER MANHOLE SANITARY SEWER CLEAN OUT TELEPHONE BOX TELEPHONE MANHOLE TELEPHONE PEDESTAL TRANSFORMER CONIFEROUS TREE DECIDUOUS TREE COMMUNICATIONS MANHOLE COMMUNICATIONS PEDESTAL WELL YARD HYDRANT EW = FINISHED GRADE AT EDGE OF WALK TC = FINISHED GRADE AT TOP BACK OF CURB BC = FINISHED GRADE AT BUILDING CORNER TW = FINISHED GRADE AT TOP OF WALL AC = FINISHED GRADE AT ASPHALT EA = FINISHED GRADE AT EDGE OF ASPHALT EC = FINISHED GRADE AT EDGE OF CONCRETE SDI = STORM DRAIN INLET SDMH = STORM DRAIN MANHOLE FL = FINISHED GRADE AT FLOWLINE FG = FINISHED GRADE EX = APPROXIMATE EXISTING ELEVATION POC = POINT ON CURVE EXISTING WATER REDUCER GAS WELL FOUND CORNER MONUMENT AS NOTED SET CORNER MONUMENT, REBAR WITH CAP BENCHMARK SECTION QUARTER CORNER SECTION CORNER WTR = WATER PI = POINT OF INTERSECTION PRC = POINT OF REVERSE CURVE RT = RIGHT LT = LEFT SS = SANITARY SEWER PT = POINT OF TANGENCY SD = STORM DRAIN GV = GATE VALVE BFV = BUTTERFLY VALVE RED = REDUCER LF = LINEAL FOOT FT = FEET SSMH = SANITARY SEWER MANHOLE BVC = BEGIN VERTICAL CURVE CS = CURB STOP EVC = END VERTICAL CURVE PVI = POINT OF VERTICAL INTERSECTION LINETYPES ABBREVIATIONS SYMBOLS PROPOSED CATCH BASIN PROPOSED WATER REDUCER PROPOSED WATER VALVE PROPOSED FIRE HYDRANT PROPOSED CURB STOP PROPOSED SANITARY SEWER MANHOLE PROPOSED STORM DRAIN MANHOLE KEYNOTE CALL OUT (SEE KEYNOTE LEGEND) SRVC = SERVICE (TYP.) = TYPICAL PC = POINT OF CURVATURE EXISTING MONUMENT BOX PROPOSED MONUMENT BOX NOTE: -EXISTING UNDERGROUND INSTALLATIONS & PRIVATE UTILITIES SHOWN ARE INDICATED ACCORDING TO THE BEST INFORMATION AVAILABLE TO THE ENGINEER. THE ENGINEER DOES NOT GUARANTEE THE ACCURACY OF SUCH INFORMATION. SERVICE LINES (WATER, POWER, GAS, STORM, SEWER, TELEPHONE & TELEVISION) MAY NOT BE STRAIGHT LINES OR AS INDICATED ON THE PLANS. STATE LAW REQUIRES CONTRACTOR TO CALL ALL UTILITY COMPANIES BEFORE EXCAVATION FOR EXACT LOCATIONS. -ALL IMPROVEMENTS SHALL BE PERFORMED IN ACCORDANCE WITH MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS 6TH EDITION, APRIL, 2010, AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS, DATED MARCH 31, 2011, WITH ADDENDUM. -UNLESS OTHERWISE SPECIFIED, ALL CONSTRUCTION LAYOUT AND STAKING SHALL BE PERFORMED UNDER THE RESPONSIBLE CHARGE OF A LAND SURVEYOR LICENSED IN THE STATE WHERE THE PROJECT IS LOCATED AND BY A PARTY CHIEF OR ENGINEERING TECHNICIAN EXPERIENCED IN CONSTRUCTION LAYOUT AND STAKING TECHNIQUES AS ARE REQUIRED BY THE SPECIFIC TYPE OF WORK BEING PERFORMED. GR = EXISTING GRADE AT GROUND BRK = GRADE BREAK FIBER OPTIC GAS PIPELINE OIL PIPELINE UNDERGROUND POWER SANITARY SEWER STORM DRAIN TELEPHONE TELEVISION/CABLE WATER CONTOUR OVERHEAD POWER FENCE - VINYL FENCE - BARBWIRE FENCE - WOOD CURB AND GUTTER EDGE OF ASPHALT EDGE OF GRAVEL FENCE - CHAINLINK/ WOVEN WIRE EXISTING PROPOSED HP = HIGH POINT DEMO AREA PROPOSED ASPHALT PROPOSED CONCRETE PROPOSED GRAVEL TOP OF CURB - 0.58' = LIP TOP OF CURB - 0.53' = FLOWLINESPILL CURB TOP OF CURB - 0.38' = LIP TOP OF CURB - 0.45' = FLOWLINECATCH CURB DROP CURB FLOOD HAZARD BOUNDARY P:\21363_01_Simkins_North_Park_Site_Plan\CADD_C3D\PRODUCTION_DWG\TRACT 3-B\INFRASTRUCTURE\21363_01_COVER.dwg, C1.2, 7/16/2025 10:05:30 AM, abelluscio, 1:1 CP#203 FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONa sanderson bellecci companyWHEAT DRIVEEXISTING SITE AND DEMOLITION PLANSIMKINS-HALLIN TRACT 3-B INFRASTRUCTURE PLANSNORTH PARK SIMKINS-HALLIN SITE DEVELOPMENTBOZEMAN, MTC2.1 RPE21363_01_EX_PROD.DWGCS06/13/2025RECORD DRAWINGS--------------21363.01RECORD DRAWINGSNORTH 0 40 SCALE: 1" = 40' 802040 SITE DEMOLITION NOTES: 1.ALL LOCATIONS AND DIMENSIONS OF EXISTING AND PROPOSED FEATURES ARE APPROXIMATE AND THE PROJECT DRAWINGS MAY NOT INCLUDE ALL EXISTING FEATURES WITHIN THE PROJECT BOUNDARIES. THE CONTRACTOR SHALL THOROUGHLY REVIEW THE SITE PRIOR TO BIDDING AND CONSTRUCTION TO BECOME FAMILIAR WITH THE EXISTING SITE FEATURES AND CONDITIONS. IF DISCREPANCIES ARE FOUND BETWEEN THE PROJECT DRAWINGS AND FIELD CONDITIONS THE CONTRACTOR SHALL CONTACT THE PROJECT ENGINEER FOR CLARIFICATION. 2.THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING AND PAYING FOR ALL PERMITS NECESSARY TO COMPLETE THE PROPOSED WORK INCLUDING DEMOLITION, RIGHT-OF-WAY AND ENVIRONMENTAL PERMITS. 3.ALL PUBLIC AND PRIVATE UTILITY TERMINATIONS, DISCONNECTS AND REMOVALS TO BE COORDINATED WITH THE APPLICABLE UTILITY PROVIDERS AND PERFORMED IN ACCORDANCE TO THEIR RESPECTIVE STANDARDS AND SPECIFICATIONS. 4.ALL EXISTING ASPHALT, CONCRETE AND OTHER EXISTING FACULTIES WITHIN THE “DEMO AREA” TO BE REMOVED AND PROPERLY DISPOSED IN ACCORDANCE TO ALL FEDERAL, STATE AND LOCAL REGULATIONS. 5.ALL REMOVED, DISTURBED OR DAMAGED EXISTING ASPHALT, CURB AND GUTTER, PUBLIC SIDEWALK AND PAVEMENT MARKINGS WITHIN THE PUBLIC RIGHT-OF-WAY TO BE RESTORED IN ACCORDANCE TO CITY STANDARDS. ALL ASPHALT MATCH LINES SHALL BE SAW CUT TO PROVIDE FLUSH TRANSITION AND SEALED. 6.ALL EXISTING UNDERGROUND SERVICE STUBS WHICH ARE NOT UTILIZED FOR THE PROPOSED BUILDING SHALL BE REMOVED AND PLUGGED BACK TO THE EXISTING MAIN. ANY EXISTING PIPING WITHIN THE PROPOSED BUILDING AREA SHALL BE REMOVED & DISPOSED. 7.ALL EXCAVATIONS OR VOIDS CREATED DURING DEMOLITION SHALL BE BACKFILLED AND COMPACTED IN A CONTROLLED MANNER PER THE PROJECT GEOTECHNICAL REQUIREMENTS. SEE REQUIREMENTS IN THE GEOTECHNICAL REPORT. 8.ALL UTILITY JUNCTION BOXES TO BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED. 9.ALL TREES AND SHRUBS SHALL BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED. PHILLIPS 66 PIPELINE NOTES: 1.WARNING HIGH PRESSURE PIPELINE(S). NO EXCAVATION OR CONSTRUCTION IN THIS AREA WITHOUT ONE-CALL AND WITHOUT CONTACTING PHILLIPS 66 PIPELINE LLC (P66PL) AT (406) 587-7060. 2.CONTRACTOR TO CONTACT YELLOWSTONE PIPELINE REPRESENTATIVE AT LEAST 72 HOURS PRIOR TO ANY WORK NEAR OR WITHIN THE EASEMENT. YELLOWSTONE PIPELINE REPRESENTATIVE MUST BE PRESENT ON-SITE DURING ALL EXCAVATION ACTIVITIES WITHIN THE EASEMENT PROJECT SURVEY CONTROL POINT #NORTHING (IFT)EASTING (IFT)ELEVATION (USSF)DESCRIPTION 12 535348.737 1572307.414 4692.892 QC / FND1.5"ACR CE COR SEC 36 T1S R5E ILLEGIBLE 203 536105.280 1571464.819 4680.362 PC / FND5/8"YCR5606GASTON 206 535594.005 1571377.649 4685.556 PC / FND5/8"YCR5606GASTON 207 535379.950 1571341.062 4689.102 PC / FND5/8"YCR5606GASTON PROJECT DATUM: LOCAL DATUM NAVD 88 SURVEYED: 11/21/22 BY: SANDERSON STEWART P:\21363_01_Simkins_North_Park_Site_Plan\CADD_C3D\PRODUCTION_DWG\TRACT 3-B\INFRASTRUCTURE\21363_01_EX_PROD.dwg, C2.1, 7/16/2025 10:06:28 AM, abelluscio, 1:1 FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONa sanderson bellecci companyWHEAT DRIVEOVERALL SITE AND UTILITY PLANSIMKINS-HALLIN TRACT 3-B INFRASTRUCTURE PLANSNORTH PARK SIMKINS-HALLIN SITE DEVELOPMENTBOZEMAN, MTC3.1 RPE21363_01_OVERALL_SITE_PROD.DWGCS06/13/2025RECORD DRAWINGS--------------21363.01RECORD DRAWINGSNORTH 0 40 SCALE: 1" = 40' 802040 GENERAL UTILITY NOTES: 1.ALL DUCTILE IRON PIPE AND FITTINGS INCLUDING HYDRANTS, VALVE BOXES, CURB BOXES, AND ALL OTHER METAL PARTS AND SURFACES SHALL BE ENCASED WITH V-BIO® ENHANCED POLYETHYLENE ENCASEMENT. 2.THE POLYETHYLENE ENCASEMENT SHALL BE OVERLAPPED ONE FOOT IN EACH DIRECTION AT JOINTS AND SECURED IN PLACE AROUND THE PIPE, AND ANY WRAP AT TAP LOCATIONS SHALL BE TAPED TIGHTLY PRIOR TO TAPPING AND INSPECTED FOR ANY NEEDED REPAIRS FOLLOWING THE TAP. PHILLIPS 66 PIPELINE NOTES: 1.WARNING HIGH PRESSURE PIPELINE(S). NO EXCAVATION OR CONSTRUCTION IN THIS AREA WITHOUT ONE-CALL AND WITHOUT CONTACTING PHILLIPS 66 PIPELINE LLC (P66PL) AT (406) 587-7060. 2.CONTRACTOR TO CONTACT YELLOWSTONE PIPELINE REPRESENTATIVE AT LEAST 72 HOURS PRIOR TO ANY WORK NEAR OR WITHIN THE EASEMENT. YELLOWSTONE PIPELINE REPRESENTATIVE MUST BE PRESENT ON-SITE DURING ALL EXCAVATION ACTIVITIES WITHIN THE EASEMENT 3.PROPOSED BUILDING MUST BE 50' MINIMUM FROM EXISTING YELLOWSTONE PIPELINE. 4.DURING INSTALLATION OF UNDERGROUND PIPELINES OR FACILITIES WITH DRILLING OR BORING TECHNOLOGY, AN AUTHORIZED PERMITTOR REPRESENTATIVE SHALL HAVE THE RIGHT TO EVALUATE AND APPROVE THE DRILLING PLAN. FOR A DRILLED CROSSING, PROVIDE AT LEAST 10 FT OF VERTICAL SEPARATION FOR CROSSINGS AND 15 FT FOR PARALLEL BORES BETWEEN NEW AND BORE AND EXISTING PIPELINES. IN ADDITION, PHILLIPS 66 MAY REQUIRE PERMITTEE TO EXCAVATE AN OBSERVATION HOLE PARALLEL TO AND APPROXIMATELY 5FT ON ONE OR BOTH SIDES OF PERMITTOR'S PIPELINE(S) EXTENDING AT LEAST 1 FT BELOW THE PIPELINE OR BORE, WHICHEVER IS SHALLOWEST. THE OBSERVATION HOLES(S) ARE TO BE MONITORED DURING BOTH THE PILOT BORE AND BACK REAMING. 5.PERMITTEE WILL REMOVE CUTTING TEETH FROM EXCAVATION EQUIPMENT BUCKET WHEN WITHIN 10 FEET OF PERMITTOR'S PIPELINE(S). MECHANICAL EXCAVATION WILL CEASE, AND ONLY HAND EXCAVATION SHALL BE PERMITTED, WITHIN 18 INCHES OF A CRUDE OIL OR PRODUCT PIPELINE AND WITHIN 24 INCHES OF A LINE CONTAINING HIGHLY VOLATILE LIQUIDS (HVL). EXCAVATION WILL NOT BE ALLOWED TO CONTINUE UNTIL THE PERMITTOR'S PIPELINE, VALVES, AND/OR FITTINGS TOP AND SIDES ARE VISIBLE TO THE SPOTTER. HOWEVER, PROCEED WITH EXTREME CAUTION WHEN WITHIN THREE (3) FEET OF THE PIPE.P:\21363_01_Simkins_North_Park_Site_Plan\CADD_C3D\PRODUCTION_DWG\TRACT 3-B\INFRASTRUCTURE\21363_01_OVERALL_SITE_PROD.dwg, C3.1, 7/16/2025 10:08:03 AM, abelluscio, 1:1 RECORD DRAWINGSNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONWHEAT DRIVESEWER MAIN PLAN AND PROFILE STA 100+00-102+00SIMKINS-HALLIN TRACT 3-B INFRASTRUCTURE PLANSNORTH PARK SIMKINS-HALLIN SITE DEVELOPMENTBOZEMAN, MTC4.1 RPE21363_01_SEWER_MAIN_PNP.DWGCS06/13/2025RECORD DRAWINGS--------------21363.01VERTICAL SCALE: 1"=5' 20 10 0 HORIZONTAL SCALE:1" = 20' 20 40 CITY OF BOZEMAN NOTES: 1.ALL CONSTRUCTION WILL CONFORM TO MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS (MPWSS) 6TH EDITION, APRIL, 2010, AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS, DATED MARCH 31, 2011, WITH ADDENDUM. 2.CONTRACTOR SHALL FIELD-VERIFY LINE AND GRADE OF EXISTING CONNECTIONS. 3.NEW SANITARY SEWER MAIN AND SERVICES TO BE INSTALLED IN TYPE I PIPE BEDDING WITH TYPE A TRENCH BACKFILL, IN ACCORDANCE WITH DETAIL SHEET C6.1. RECORD DRAWINGSNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONWHEAT DRIVEWATER MAIN PLAN AND PROFILE STA 200+00-204+50SIMKINS-HALLIN TRACT 3-B INFRASTRUCTURE PLANSNORTH PARK SIMKINS-HALLIN SITE DEVELOPMENTBOZEMAN, MTC5.1 RPE21363_01_WATER_MAIN_PNP.DWGCS06/13/2025RECORD DRAWINGS--------------21363.01VERTICAL SCALE: 1"=5' 20 10 0 HORIZONTAL SCALE:1" = 20' 20 40 CITY OF BOZEMAN NOTES: 1.ALL CONSTRUCTION WILL CONFORM TO MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS (MPWSS) 6TH EDITION, APRIL, 2010, AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS, DATED MARCH 31, 2011, WITH ADDENDUM. 2.ANY EXISTING OR NEW VALVES WHICH CONTROL THE CITY OF BOZEMAN'S WATER SUPPLY SHALL BE OPERATED BY CITY OF BOZEMAN PERSONNEL ONLY. 3.THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING OF WORK. 4.CONTRACTOR SHALL FIELD-VERIFY LINE AND GRADE OF EXISTING CONNECTIONS. 5.A PRE-CONSTRUCTION MEETING MUST BE SCHEDULED WITH THE CITY OF BOZEMAN WATER AND ENGINEER DEPARTMENTS PRIOR TO INSTALLATION OF THE FIRE LINE AND DOMESTIC SERVICE. 6.CONTRACTOR SHALL INSTALL NEW WATER MAIN AND FIRE LINE WITH RESTRAINED JOINT PIPE AND FITTINGS. 7.ALL DUCTILE IRON PIPE AND FITTINGS INCLUDING HYDRANTS, VALVE BOXES, CURB BOXES, AND ALL OTHER METAL PARTS AND SURFACES SHALL BE ENCASED WITH V-BIO® TM ENHANCED POLYETHYLENE ENCASEMENT. 8.THE POLYETHYLENE ENCASEMENT SHALL BE OVERLAPPED ONE FOOT IN EACH DIRECTION AT JOINTS AND SECURED IN PLACE AROUND THE PIPE, AND ANY WRAP AT TAP LOCATIONS SHALL BE TAPED TIGHTLY PRIOR TO TAPPING AND INSPECTED FOR ANY NEEDED REPAIRS FOLLOWING THE TAP. 9.NEW WATER MAIN AND FIRE LINE TO BE INSTALLED IN TYPE I PIPE BEDDING WITH TYPE A TRENCH BACKFILL AND RESTRAINED JOINTS ACCORDING TO DETAIL SHEET C6.1. 10.CONTRACTOR SHALL PERFORM A PRESSURE TEST AND LEAKAGE TEST ON ALL INSTALLED WATER PIPES IN ACCORDANCE WITH CITY OF BOZEMAN STANDARDS. 11.CONTRACTOR SHALL FLUSH, DISINFECT AND TEST ALL WATER PIPES IN ACCORDANCE WITH CITY OF BOZEMAN STANDARDS. RECORD DRAWINGSNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONWHEAT DRIVEWATER MAIN PLAN AND PROFILE STA 204+50-206+75SIMKINS-HALLIN TRACT 3-B INFRASTRUCTURE PLANSNORTH PARK SIMKINS-HALLIN SITE DEVELOPMENTBOZEMAN, MTC5.2 RPE21363_01_WATER_MAIN_PNP.DWGCS06/13/2025RECORD DRAWINGS--------------21363.01VERTICAL SCALE: 1"=5' 20 10 0 HORIZONTAL SCALE:1" = 20' 20 40 CITY OF BOZEMAN NOTES: 1.ALL CONSTRUCTION WILL CONFORM TO MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS (MPWSS) 6TH EDITION, APRIL, 2010, AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS, DATED MARCH 31, 2011, WITH ADDENDUM. 2.ANY EXISTING OR NEW VALVES WHICH CONTROL THE CITY OF BOZEMAN'S WATER SUPPLY SHALL BE OPERATED BY CITY OF BOZEMAN PERSONNEL ONLY. 3.THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING OF WORK. 4.CONTRACTOR SHALL FIELD-VERIFY LINE AND GRADE OF EXISTING CONNECTIONS. 5.A PRE-CONSTRUCTION MEETING MUST BE SCHEDULED WITH THE CITY OF BOZEMAN WATER AND ENGINEER DEPARTMENTS PRIOR TO INSTALLATION OF THE FIRE LINE AND DOMESTIC SERVICE. 6.CONTRACTOR SHALL INSTALL NEW WATER MAIN AND FIRE LINE WITH RESTRAINED JOINT PIPE AND FITTINGS. 7.ALL DUCTILE IRON PIPE AND FITTINGS INCLUDING HYDRANTS, VALVE BOXES, CURB BOXES, AND ALL OTHER METAL PARTS AND SURFACES SHALL BE ENCASED WITH V-BIO® TM ENHANCED POLYETHYLENE ENCASEMENT. 8.THE POLYETHYLENE ENCASEMENT SHALL BE OVERLAPPED ONE FOOT IN EACH DIRECTION AT JOINTS AND SECURED IN PLACE AROUND THE PIPE, AND ANY WRAP AT TAP LOCATIONS SHALL BE TAPED TIGHTLY PRIOR TO TAPPING AND INSPECTED FOR ANY NEEDED REPAIRS FOLLOWING THE TAP. 9.NEW WATER MAIN AND FIRE LINE TO BE INSTALLED IN TYPE I PIPE BEDDING WITH TYPE A TRENCH BACKFILL AND RESTRAINED JOINTS ACCORDING TO DETAIL SHEET C6.1. 10.CONTRACTOR SHALL PERFORM A PRESSURE TEST AND LEAKAGE TEST ON ALL INSTALLED WATER PIPES IN ACCORDANCE WITH CITY OF BOZEMAN STANDARDS. 11.CONTRACTOR SHALL FLUSH, DISINFECT AND TEST ALL WATER PIPES IN ACCORDANCE WITH CITY OF BOZEMAN STANDARDS. RECORD DRAWINGSNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONWHEAT DRIVEWATER MAIN PLAN AND PROFILE STA 200+00-201+50SIMKINS-HALLIN TRACT 3-B INFRASTRUCTURE PLANSNORTH PARK SIMKINS-HALLIN SITE DEVELOPMENTBOZEMAN, MTC5.3 RPE21363_01_WATER_MAIN_PNP.DWGCS06/13/2025RECORD DRAWINGS--------------21363.01VERTICAL SCALE: 1"=5' 20 10 0 HORIZONTAL SCALE:1" = 20' 20 40 CITY OF BOZEMAN NOTES: 1.ALL CONSTRUCTION WILL CONFORM TO MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS (MPWSS) 6TH EDITION, APRIL, 2010, AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS, DATED MARCH 31, 2011, WITH ADDENDUM. 2.ANY EXISTING OR NEW VALVES WHICH CONTROL THE CITY OF BOZEMAN'S WATER SUPPLY SHALL BE OPERATED BY CITY OF BOZEMAN PERSONNEL ONLY. 3.THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING OF WORK. 4.CONTRACTOR SHALL FIELD-VERIFY LINE AND GRADE OF EXISTING CONNECTIONS. 5.A PRE-CONSTRUCTION MEETING MUST BE SCHEDULED WITH THE CITY OF BOZEMAN WATER AND ENGINEER DEPARTMENTS PRIOR TO INSTALLATION OF THE FIRE LINE AND DOMESTIC SERVICE. 6.CONTRACTOR SHALL INSTALL NEW WATER MAIN AND FIRE LINE WITH RESTRAINED JOINT PIPE AND FITTINGS. 7.ALL DUCTILE IRON PIPE AND FITTINGS INCLUDING HYDRANTS, VALVE BOXES, CURB BOXES, AND ALL OTHER METAL PARTS AND SURFACES SHALL BE ENCASED WITH V-BIO® TM ENHANCED POLYETHYLENE ENCASEMENT. 8.THE POLYETHYLENE ENCASEMENT SHALL BE OVERLAPPED ONE FOOT IN EACH DIRECTION AT JOINTS AND SECURED IN PLACE AROUND THE PIPE, AND ANY WRAP AT TAP LOCATIONS SHALL BE TAPED TIGHTLY PRIOR TO TAPPING AND INSPECTED FOR ANY NEEDED REPAIRS FOLLOWING THE TAP. 9.NEW WATER MAIN AND FIRE LINE TO BE INSTALLED IN TYPE I PIPE BEDDING WITH TYPE A TRENCH BACKFILL AND RESTRAINED JOINTS ACCORDING TO DETAIL SHEET C6.1. 10.CONTRACTOR SHALL PERFORM A PRESSURE TEST AND LEAKAGE TEST ON ALL INSTALLED WATER PIPES IN ACCORDANCE WITH CITY OF BOZEMAN STANDARDS. 11.CONTRACTOR SHALL FLUSH, DISINFECT AND TEST ALL WATER PIPES IN ACCORDANCE WITH CITY OF BOZEMAN STANDARDS. RECORD DRAWINGSNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONa sanderson bellecci companyWHEAT DRIVEMILLWORK BUILDING FIRE SERVICE PLAN AND PROFILESIMKINS-HALLIN TRACT 3-B INFRASTRUCTURE PLANSNORTH PARK SIMKINS-HALLIN SITE DEVELOPMENTBOZEMAN, MTC5.4 RPE21363_01_FIRE_SERVICE_PNP.DWGCS06/13/2025RECORD DRAWINGS--------------21363.01VERTICAL SCALE: 1"=5' 10 5 0 HORIZONTAL SCALE:1" = 10' 10 20 CITY OF BOZEMAN NOTES: 1.ALL CONSTRUCTION WILL CONFORM TO MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS (MPWSS) 6TH EDITION, APRIL, 2010, AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS, DATED MARCH 31, 2011, WITH ADDENDUM. 2.ANY EXISTING OR NEW VALVES WHICH CONTROL THE CITY OF BOZEMAN'S WATER SUPPLY SHALL BE OPERATED BY CITY OF BOZEMAN PERSONNEL ONLY. 3.THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING OF WORK. 4.CONTRACTOR SHALL FIELD-VERIFY LINE AND GRADE OF EXISTING CONNECTIONS. 5.A PRE-CONSTRUCTION MEETING MUST BE SCHEDULED WITH THE CITY OF BOZEMAN WATER AND ENGINEER DEPARTMENTS PRIOR TO INSTALLATION OF THE FIRE LINE AND DOMESTIC SERVICE. 6.CONTRACTOR SHALL INSTALL NEW WATER MAIN AND FIRE LINE WITH RESTRAINED JOINT PIPE AND FITTINGS. 7.ALL DUCTILE IRON PIPE AND FITTINGS INCLUDING HYDRANTS, VALVE BOXES, CURB BOXES, AND ALL OTHER METAL PARTS AND SURFACES SHALL BE ENCASED WITH V-BIO® TM ENHANCED POLYETHYLENE ENCASEMENT. 8.THE POLYETHYLENE ENCASEMENT SHALL BE OVERLAPPED ONE FOOT IN EACH DIRECTION AT JOINTS AND SECURED IN PLACE AROUND THE PIPE, AND ANY WRAP AT TAP LOCATIONS SHALL BE TAPED TIGHTLY PRIOR TO TAPPING AND INSPECTED FOR ANY NEEDED REPAIRS FOLLOWING THE TAP. 9.NEW WATER MAIN AND FIRE LINE TO BE INSTALLED IN TYPE I PIPE BEDDING WITH TYPE A TRENCH BACKFILL AND RESTRAINED JOINTS ACCORDING TO DETAIL SHEET C6.1.P:\21363_01_Simkins_North_Park_Site_Plan\CADD_C3D\PRODUCTION_DWG\TRACT 3-B\INFRASTRUCTURE\21363_01_FIRE_SERVICE_PNP.dwg, 24x36-PnP, 7/16/2025 10:08:55 AM, abelluscio, 1:1 RECORD DRAWINGSNORTH FILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONa sanderson bellecci companyWHEAT DRIVEMECHANIC BUILDING FIRE SERVICE PLAN AND PROFILESIMKINS-HALLIN TRACT 3-B INFRASTRUCTURE PLANSNORTH PARK SIMKINS-HALLIN SITE DEVELOPMENTBOZEMAN, MTC5.5 RPE21363_01_FIRE_SERVICE_PNP.DWGCS06/13/2025RECORD DRAWINGS--------------21363.01VERTICAL SCALE: 1"=5' 10 5 0 HORIZONTAL SCALE:1" = 10' 10 20 CITY OF BOZEMAN NOTES: 1.ALL CONSTRUCTION WILL CONFORM TO MONTANA PUBLIC WORKS STANDARD SPECIFICATIONS (MPWSS) 6TH EDITION, APRIL, 2010, AND THE CITY OF BOZEMAN STANDARD MODIFICATIONS, DATED MARCH 31, 2011, WITH ADDENDUM. 2.ANY EXISTING OR NEW VALVES WHICH CONTROL THE CITY OF BOZEMAN'S WATER SUPPLY SHALL BE OPERATED BY CITY OF BOZEMAN PERSONNEL ONLY. 3.THE CONTRACTOR SHALL NOTIFY THE WATER DEPARTMENT A MINIMUM OF 24-HOURS PRIOR TO BEGINNING OF WORK. 4.CONTRACTOR SHALL FIELD-VERIFY LINE AND GRADE OF EXISTING CONNECTIONS. 5.A PRE-CONSTRUCTION MEETING MUST BE SCHEDULED WITH THE CITY OF BOZEMAN WATER AND ENGINEER DEPARTMENTS PRIOR TO INSTALLATION OF THE FIRE LINE AND DOMESTIC SERVICE. 6.CONTRACTOR SHALL INSTALL NEW WATER MAIN AND FIRE LINE WITH RESTRAINED JOINT PIPE AND FITTINGS. 7.ALL DUCTILE IRON PIPE AND FITTINGS INCLUDING HYDRANTS, VALVE BOXES, CURB BOXES, AND ALL OTHER METAL PARTS AND SURFACES SHALL BE ENCASED WITH V-BIO® TM ENHANCED POLYETHYLENE ENCASEMENT. 8.THE POLYETHYLENE ENCASEMENT SHALL BE OVERLAPPED ONE FOOT IN EACH DIRECTION AT JOINTS AND SECURED IN PLACE AROUND THE PIPE, AND ANY WRAP AT TAP LOCATIONS SHALL BE TAPED TIGHTLY PRIOR TO TAPPING AND INSPECTED FOR ANY NEEDED REPAIRS FOLLOWING THE TAP. 9.NEW WATER MAIN AND FIRE LINE TO BE INSTALLED IN TYPE I PIPE BEDDING WITH TYPE A TRENCH BACKFILL AND RESTRAINED JOINTS ACCORDING TO DETAIL SHEET C6.1.P:\21363_01_Simkins_North_Park_Site_Plan\CADD_C3D\PRODUCTION_DWG\TRACT 3-B\INFRASTRUCTURE\21363_01_FIRE_SERVICE_PNP.dwg, Layout1-24x36-PnP, 7/16/2025 10:09:02 AM, abelluscio, 1:1 RECORD DRAWINGSFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONa sanderson bellecci companyWHEAT DRIVECONSTRUCTION DETAILSSIMKINS-HALLIN TRACT 3-B INFRASTRUCTURE PLANSNORTH PARK SIMKINS-HALLIN SITE DEVELOPMENTBOZEMAN, MTC6.1 RPE21363_01_DETAILS_PROD.DWGCS06/13/2025RECORD DRAWINGS--------------21363.01P:\21363_01_Simkins_North_Park_Site_Plan\CADD_C3D\PRODUCTION_DWG\TRACT 3-B\INFRASTRUCTURE\21363_01_DETAILS_PROD.dwg, 24x36-DETAILS, 7/16/2025 10:09:43 AM, abelluscio, 1:1 RECORD DRAWINGSFILE:PROJECT NO:CAD:QUALITY ASSURANCE:DRAWING HISTORYDATE DESCRIPTIONa sanderson bellecci companyWHEAT DRIVECONSTRUCTION DETAILSSIMKINS-HALLIN TRACT 3-B INFRASTRUCTURE PLANSNORTH PARK SIMKINS-HALLIN SITE DEVELOPMENTBOZEMAN, MTC6.2 RPE21363_01_DETAILS_PROD.DWGCS06/13/2025RECORD DRAWINGS--------------21363.01P:\21363_01_Simkins_North_Park_Site_Plan\CADD_C3D\PRODUCTION_DWG\TRACT 3-B\INFRASTRUCTURE\21363_01_DETAILS_PROD.dwg, Layout1-24x36-DETAILS, 7/16/2025 10:09:49 AM, abelluscio, 1:1