HomeMy WebLinkAbout08-19-26 - Downtown Business Improvement District - Agendas & Packet MaterialsA. Call meeting to order - 12:00 p.m.
B. Disclosures
C. Changes to the Agenda
D. Approval of Minutes
D.1 Approve Meeting Minutes(Cope)
E. Public Comments on Non-agenda Items Falling within the Purview and Jurisdiction of the Board
THE BOZEMAN DOWNTOWN BUSINESS IMPROVEMENT DISTRICT BOARD OF BOZEMAN, MONTANA
BID AGENDA
Wednesday, August 19, 2026
General information about the Downtown Business Improvement District Board is available in our
Laserfiche repository.
If you are interested in commenting in writing on items on the agenda please send an email to
comments@bozeman.net or visit the Public Comment Page prior to 12:00pm on the day of the
meeting. At the direction of the City Commission, anonymous public comments are not distributed to
the Board or staff.
Public comments will also be accepted in-person and through Video Conference during the appropriate
agenda items.
As always, the meeting will be streamed through the Commission's video page and available in the
City on cable channel 190.
For more information please contact Emily Cope, emily@downtownbozeman.org
This meeting will be held both in-person and also using an online video conferencing system. You
can join this meeting:
Via Video Conference:
Click the Register link, enter the required information, and click submit.
Click Join Now to enter the meeting.
Via Phone: This is for listening only if you cannot watch the stream, channel 190, or attend in-
person
United States Toll
+1 253 205 0468
Access code: 955 3864 1712
This is the time to comment on any non-agenda matter falling within the scope of the Business
Improvement District Board. There will also be time in conjunction with each agenda item for
public comment relating to that item but you may only speak once per topic.
Please note, the Board cannot take action on any item which does not appear on the agenda. All
persons addressing the Board shall speak in a civil and courteous manner and members of the
1
F. Action Items
F.1 Work Session Regarding Possible Recommendations Related to Maximum Building Height in
the B-3 Zoning District and Zone Edge Transitions(Saunders)
G. FYI/Discussion
G.1 Economic Development Director's Report & Finance Report (Cope)
H. Adjournment
audience shall be respectful of others. Please state your name, and state whether you are a
resident of the city or a property owner within the city in an audible tone of voice for the record
and limit your comments to three minutes.
For more information please contact Emily Cope, Bozeman Downtown Partnership,
emily@downtownbozeman.org
This board generally meets the 3rd Wednesday of the month from 12:00 to 1:30
City Board meetings are open to all members of the public. If you have a disability that requires
assistance, please contact our ADA Coordinator, David Arnado, at 406.582.3232.
2
Memorandum
REPORT TO:Bozeman Downtown Business Improvement District Board
FROM:Emily Cope, Downtown Bozeman Partnership
SUBJECT:Approve Meeting Minutes
MEETING DATE:August 19, 2026
AGENDA ITEM TYPE:Minutes
RECOMMENDATION:I move to approve the July 2026 meeting minutes.
STRATEGIC PLAN:4.4 Vibrant Downtown, Districts & Centers: Promote a healthy, vibrant
Downtown, Midtown, and other commercial districts and neighborhood
centers – including higher densities and intensification of use in these key
areas.
BACKGROUND:Meeting minutes from the July 2026 board meeting.
UNRESOLVED ISSUES:None.
ALTERNATIVES:As suggested by board.
FISCAL EFFECTS:None.
Attachments:
Downtown BID July 2026 Board Meeting Minutes.docx
Report compiled on: July 7, 2026
3
Downtown BID Meeting Minutes, July 2026
Page 1 of 2
THE DOWNTOWN BUSINESS IMPROVEMENT DISTRICT MEETING OF BOZEMAN, MONTANA
MINUTES
July 15, 2026
General information about the Downtown Business Improvement District Board is available in our
Laserfiche repository.
A) 00:01:24 Call meeting to order - 12:00 p.m.
Present: Mark Kehke, Erik Nelson, Susan Neubauer, Ileana Indreland, Emily Cope, Jennifer Madgic
Absent: Ellie Staley
Excused: Eric Sutherland, Eric Bowman, Randy Scully
B) Disclosures
C) 00:01:33 Changes to the Agenda
D) 00:01:41 Approval of Minutes
D.1 00:01:45 Approve Meeting Minutes
Downtown BID April 2026 Board Meeting Minutes.docx
00:01:47 Motion to approve I move to approve the April 2026 meeting minutes.
Ileana Indreland: Motion
Susan Neubauer: 2nd
00:02:03 Vote on the Motion to approve I move to approve the April 2026 meeting minutes. The Motion
carried 4 - 0.
Approve:
Mark Kehke
Erik Nelson
Susan Neubauer
Ileana Indreland
4
Downtown BID Meeting Minutes, July 2026
Page 2 of 2
Disapprove:
None
E) 00:02:26 Public Comments on Non-agenda Items Falling within the Purview and
Jurisdiction of the Board
F) Special Presentation
F.1 00:03:11 Bozeman Creek Vision Plan Presentation
00:47:54 Ken VanDeWalle provided public comment.
F.2 00:54:47 Downtown Bozeman Parking: Data, Audience Insights & Opportunities
Downtown Bozeman Parking - Updated July 2026.pdf
G) FYI/Discussion
G.1 Economic Development Director's Report & Finance Report
BID Finance Report 6-30-26.pdf
BID EDD Report 7-26.pdf
H) 01:36:48 Adjournment
For more information please contact Emily Cope, Bozeman Downtown Partnership,
emily@downtownbozeman.orgThis board generally meets the 3rd Wednesday of the month from 12:00
to 1:30
5
Memorandum
REPORT TO:Bozeman Downtown Business Improvement District Board
FROM:Tom Rogers, Senior Planner
Chris Saunders, Community Development Manager
Erin George, Community Development Director
SUBJECT:Work Session Regarding Possible Recommendations Related to Maximum
Building Height in the B-3 Zoning District and Zone Edge Transitions
MEETING DATE:August 19, 2026
AGENDA ITEM TYPE:Community Development - Legislative
RECOMMENDATION:Make recommendation to City Commission in response to identified
questions.
STRATEGIC PLAN:4.2 High Quality Urban Approach: Continue to support high-quality planning,
ranging from building design to neighborhood layouts, while pursuing urban
approaches to issues such as multimodal transportation, infill, density,
connected trails and parks, and walkable neighborhoods.
BACKGROUND:The City's Unified Development Code establishes maximum height standards
in zoning districts and has adopted many standards to address public
concerns on the mass and scale of new buildings. One of those, zone edge
transitions, requires buildings to be designed with certain features if located
at the boundary between some zoning districts. The City Commission will
hold a work session to discuss these issues on Aug 25, 2026, and welcomes
thoughts and recommendations on these issues in support of that
discussion.
The standards were recently adopted during the 2025 Unified Development
Code update. Maximum building height for B-3 is set in Section 38.220.050
and the rule of interpretation for height is in Section 38.260.100. The rule of
interpretation describes how heights are measures, allowed encroachments
above maximum height, and other details. Zone edge transitions are
described and applied per Section 38.260.070. The UDC text [external PDF] is
available online.
A staff memo, maps, and other information are attached to this agenda
item. Public comments related to this item are available in Laserfiche
[external link]. Staff will summarize the content in the memo and present
additional materials.
UNRESOLVED ISSUES:None.
6
ALTERNATIVES:Determine recommendation, if any, to make to the City Commission as
selected by the Board.
FISCAL EFFECTS:This item does not expend funds.
Attachments:
Memo re B-3 Height and Transitions Downtown Boards 8-18-
2026.pdf
BZN Taller Building Heights - 6.9.2026e.pdf
Updated Tall Buildings Map 2026 11x17.pdf
Building Height Discussion Map.pdf
ZoneEdgeTransitionMap.pdf
Commercial Zoning Districts Map.pdf
Report compiled on: August 4, 2026
7
Unified Development Code (UDC) Discussion on Building Height in B-3 Zoning
District and Zone Edge Transitions
Report To: Downtown Urban Renewal Board and Business Improvement District Board
From: Tom Rogers, Senior Planner
Chris Saunders, Community Development Manager
Erin George, Community Development Director
Meeting Date: August 18 and 19, 2026
Memo Organization:
• Questions for Consideration
• General Background Information
o Immediate History
o State Law and Local Plans
o General Regulation Information
• Current Code
o Building Heights
o Wall Plate
o Articulation
o Zone Edge Transitions and Step Backs
o Street Trees
Questions for Consideration
The following questions will be discussed by the City Commission on August 25, 2026. The
Commission requests input on these questions.
1) Retain the 90 feet building height authorized in the B-3 zoning district?
2) Direct review of a potential amendment in height with no other changes?
3) Establish additional minimum standard applicable for buildings over XX feet and retain the 90
feet maximum building height?
8
Page 2 of 15
4) Direct a review of a potential amendment to how zone edge transitions function?
General Background
Immediate History
The City Commission has requested a work session regarding the maximum building height in the
B-3 zoning district (38.220.050.B.1) and Zone Edge Transitions (38.260.070). Transitions and a
seven story building height in the B-3 zoning district were included in the August 2023 public
review draft of the Unified Development Code.
The height and transition standards now in place came from revisions to earlier standards and
were adopted in December 2025 and are available through the City’s website [external PDF].
During the formation of the current standards, the City engaged with advisory boards and the
public through variety of outreach opportunities. The City Commission held a work session on
regulatory tools to control mass and scale of buildings. This work session was held on June 24,
2025. The video recording [external link] and packet materials [external PDF] are available through
the City’s website. The work session begins at 1:05:45 in the recording and on page 45 in the
Commission packet. As part of the work session the Commission directed a change in height
measurement from stories to feet with the translation of seven stories to 90 feet as an outcome in
B-3.
During the public engagement process for the UDC update prior to the June 2025 work session
several questions in surveys and comments in other engagement opportunities addressed mass and
scale of buildings and how best to manage mass and scale. That information was made available to
the Community Development Board, City Commission, and public prior to the work session.
Provisional adoption of the updated Unified Development Code occurred on December 2, 2025; and
final adoption occurred on December 16, 2025. The recording of the December 2nd meeting is
available online [external link] and discussion begins at 4:15:15 in the recording and concludes at
9:41:20. The recording of the December 16th meeting is available online [external link] and
discussion begins at minute 55:50 in the recording and concludes at 3:03:30. The Commission
discussed and modified the maximum height in the B-3 district in both meetings and finalized the
code with a 90 foot maximum height.
No new buildings have been constructed following the revised 2025 development code that
includes the substantially increased zone edge transition section. All the recently constructed
buildings are reviewed and approved under the previous development code.
Community Development Board
The Community Development Board, at their meeting on August 3, 2026 discussed this material.
The recording [external link] of the meeting is available with the following occurring through the
discussion:
• Staff presentation – 6:30
9
Page 3 of 15
• Board questions – 35:45
• Public comment – 55:15
• Board discussion – 1:03:25
• Board recommendation – 1:42:30
o 1) Height – I move that we recommend to City Commission in the matter of B-3
building heights to retain the 90 feet height maximum in the B-3 zoning district but
also consider adding additional required stepbacks and/or setbacks that limit the
perceived mass and scale for buildings in the B-3 zone for buildings above a defined
height. Passed 6-0.
o 2) Transitions – Recommended to include in transitions (38.260.070) the opportunity
for a subject lot to build up to the limits allowed in the abutting lot(s) before any
transition requirement applies. No motion but all agreed.
Overall Context
The desire to control the built environment (mass, scale, height) is not new. The early purposes of
zoning in the United States included control of bulk in places like New York and Chicago. The
purpose has evolved with time. As has the justification for adopting zoning regulations.
The first use of basic zoning was to address very real social, environmental, and health issues. Jacob
Riis, How the Other Half Lives” [External Link], written in 1890, provides a stark and vivid portrayal
of how communities have evolved, how the built environment needs to respond to changing
conditions, and how the built environment affects people. As building codes and other regulations
have changed to address some issues the need for zoning to also address those issues has changed.
State Law and Local Plans
The state first passed authorization for municipal zoning in 1929 and amendments occurred over
time. Evolution of the law continued with the passage in 2023 of the Montana Land Use Planning
Act (MLUPA). MLUPA gives authority to the City to plan for and regulate land use and development.
The City must conform to MLUPA. MLUPA primarily addresses procedures and leaves some latitude
to local decision makers in many areas to address non-procedural matters. Some very detailed
requirements for development standards are included in MLUPA including minimum heights in
some types of zoning districts, such as those covering the downtown area.
MLUPA itself is guided by the MT Constitution including Article 2 Section 3 that both identifies
property rights and responsibilities that go with it. Zoning is a tool to help balance rights that may
be in competition and to identify responsibilities and how to meet them.
Section 3. Inalienable rights. All persons are born free and have certain inalienable rights.
They include the right to a clean and healthful environment and the rights of pursuing life's
basic necessities, enjoying and defending their lives and liberties, acquiring, possessing and
10
Page 4 of 15
protecting property, and seeking their safety, health and happiness in all lawful ways. In
enjoying these rights, all persons recognize corresponding responsibilities.
MLUPA requires that regulations governing land use be in accordance with the adopted land use
plan. The City updated its land use plan in October 2025 and carried forward the goals and
objectives initially adopted in 2020 after a 2.5-year public drafting and review process.
The adoption of the BCP2025 also carried forward the adopted Downtown Bozeman Improvement
Plan, [external link] (DBIP) initially adopted in May 2019. The DBIP further develops guiding
principles related to the continuing development and evolution of the Downtown area, largely
defined by the B-3 zoning district boundary at the time of adoption. The DBIP itself was an update
to the Downtown Improvement Plan adopted in 2009 which encouraged further development in
the B-3 area surrounding Main Street. Additional housing as well as commercial activities are
encouraged.
One of the DBIP key ideas was that Downtown needed to expand north and south of Main Street,
see More than Main Street beginning on page 52. In the portion of the DBIP titled The Heart of a
Thriving City, starting on page 32, there is discussion about growth trends and mixes and how
Downtown may differ from other areas of the community. Overall, the DBIP recommends that
Downtown expand urban density uses north and south of Main Street into other areas zoned B-3 to
facilitate additional employment and housing opportunities.
At the same time, the DBIP also identifies a desire to address the existing historic districts both
along Main Street and near to the Downtown. To help address both opportunities for development
and existing areas the DBIP recommended resolution of several inconsistencies between the land
use plan, zoning, and existing development types. These are discussed under the section titled
Welcoming to Everyone beginning on page 102 and were largely resolved with revisions to the
future land use map in 2020 and the UDC zoning map update completed in 2025. The Welcoming to
Everyone section also recommends an increase in authorized building height to enable seven story
buildings. It further discusses the idea of height transitions to be responsive to context. The City
Commission adopted formal standards for building height transitions in 2018 and revised them in
2025. See below for further discussion.
Appendix B of the DBIP makes several suggestions for possible revisions to regulations relating to
building height and transitions to implement the DBIP. These were evaluated as part of the UDC
update completed in 2025 and several were included in whole or with revisions beginning with the
initial public review draft in August 2023.
Balancing the desire for incremental development and redevelopment with meeting the needs for
housing for existing and relocating individuals, providing for employment, and enabling services to
meet needs, while at the same time addressing various civil rights is complex. The Bozeman
Community Plan 2025 (BCP2025) [External link] includes seven themes. Maximizing each outcome
11
Page 5 of 15
tends to create tension between competing outcomes as maximizing one may be detrimental to
another.
• A resilient city
• A city of unique neighborhoods
• A city bolstered by downtown and complementary districts
• A city influenced by our natural environment, parks, and open lands
• A city that prioritizes accessibility and mobility choices
• A city powered by its creative, innovative, and entrepreneurial economy
• A city engaged in regional coordination
The BCP2025 addresses the fundamental tensions of growth. How do we maintain existing
developed areas and accommodate those who wish to join the community or address changing
needs. Chapter One addresses “To Grow or Not to Grow” and “Does the City Have to Grow.”
Local land development and use standards must conform to the purposes and limits of zoning and
established in law, whether by the legislature or the courts. The UDC is the primary implementation
tool of the adopted land use plan. With each revision of the long-range planning documents, the city
made edits to zoning to realize the community’s desires and conform with legal requirements. Since
2003, state law has required regulations to be in accordance with the adopted land use plan. The
current UDC text and map reflect this requirement.
General Regulation Information
Anticipating the update to the development regulations after adoption of the land use plan in 2020,
the city performed a code assessment to identify possible changes that could improve the Unified
Development Code (UDC), zoning map, and development review processes to both maintain needed
standards and outcomes, and remove regulatory barriers to the creation of affordable housing
[Unified Development Code Affordable Housing Assessment]. Changes to form and intensity
standards are discussed beginning on page 23. The recent UDC update implemented many
recommendations from the report.
There is a wide range of resources describing concepts to control the built environment. Individual
controls all have pros and cons depending on the context being employed and what the community
hopes to achieve by a particular set of regulations. Some terms are explicitly defined in the UDC.
The meaning of specific terms is also influenced by State and Federal definitions.
A variety of tools are available to influence the size and proportions of a structure and its
relationship to adjacent properties. Most zoning codes employ more than one tool, and the
interactions must be considered collectively to work. Functional tools are influenced by the context
of the community in setting specific standards. What works in one community may not achieve
12
Page 6 of 15
another’s desired outcome. These zoning standards impact land use efficiency, housing stock, and
costs. The following tools to influence building mass and scale are included as part of the UDC and
may have also been adopted by prior versions of the code:
• Lot Setbacks: Required distances between a building and property lines, roads, or other
structures.
• Lot Area: The minimum amount of land required within the boundaries of a lot. This tool is
much more limited in application under the new code.
• Lot Coverage: The percentage of the surface of a lot that can be covered by buildings,
ensuring open space for landscaping, recreation, or other non-building uses.
• Height: Maximum building height. Bozeman measures height in feet from grade.
• Wall plate: A limitation on maximum height from ground to where a roof line or step back
needs to begin to limit overall visual mass of a building.
• Horizontal Massing (Width): A limitation on the maximum building width in relation to the
street.
• Building size: A limitation on the maximum building total floor area.
• Park dedication and on-site open area: A minimum amount of area which must be set aside
from development or developed to provide recreational functions for residents.
• On-site commercial and residential open space requirements. Provides amenity space for
residents and “third spaces” for human interaction and creates additional transition areas.
• Elevation Design Requirements: Ratios, formulas, or specific measurements on the street-
facing front elevation of a home based on certain conditions, such as a garage.
• Step backs and planes: Required changes to the façade of a building to move back from the
placement at ground level.
• Screening requirements for utility to serve basic needs of power, garbage, delivery service
areas, etc.
• Transitions: Standards for building design to reduce the maximum wall height of taller
allowed building heights in one district to an adjacent district.
• Building Frontage: How buildings relate to streets and public spaces.
Bozeman’s development code uses these tools in residential, commercial, and industrial zones. For
the current form and intensity standards (setbacks, height, lot area, etc.) in the updated UDC
[external link] see Article 2 and the individual descriptions of each zoning district and Division
38.520.
13
Page 7 of 15
No single standard adequately addresses all the concerns of the community or the characteristics of
construction relating to bulk and scale of buildings. The following graphic helps illustrate the way
these concepts interact. Each identified subject (illustrated by a colored circle) allows for a range of
actions or sets a standard. A project must meet each of the regulations. Only where a proposed
project can meet all the standards can it be approved (illustrated by the orange shape). Each
standard helps constrain the potential for excess in other standards.
When considering how these standards work together it is important to remember and consider
the range of uses that will be subject to the standard. If only homes are considered then a different
outcome may be acceptable than when the schools, churches, daycares, offices, retail, and other
activities also allowed in a zoning district are part of the consideration. The same tools are used in
non-residential and mixed-use zoning districts although the numeric standard may vary by district.
Each regulatory tool has nuances, and many have some flexibility in their application. If there is a
code reference listed such as shown in the standards of the B-3C district in 38.220.060.B.1 and
shown further below, it means there is additional detail at the referenced section. To understand
the standard, you should read the additional details as well as the initial standard description.
Those details often include a reference to “relief” which is the defined flexibility in application of the
standard.
Zoning is not retroactive. Buildings cannot be required to be modified to meet new requirements.
Existing or approved structures may continue as is until redevelopment is proposed or be
constructed according to approved plans.
14
Page 8 of 15
Current Code
The 2025 UDC update created a new B-3C zoning district to distinguish the historic area along Main
Street with a well-established pattern of lower commercial buildings with a few taller structures
from other areas of the Downtown that may be suitable for new construction of more intensive
structures. The B-3C zoning district has three specific standards for buildings that distinguish it
from B-3:
1) a shorter maximum building height of 60 feet – the lowest allowed by state law,
2) a wall plate standard that requires a break in the height of the façade at 45 feet, and
3) a step back for the façade at or above the 4th story. See 38.260.060.B for the standards and
the following image for location of the B-3C zoning district.
A revised zoning map was adopted in conjunction with the new development code. Several of the
changes adopted were a direct result of state mandates to harmonize the zoning with the land use
plan. Several others removed mid-block zoning boundaries. Regulating the built environment is a
finer grained tool than adjusting the base zoning. Consideration of whether the zoning map needs to
be further examined to determine if the appropriate zoning is applied to a given area and is in
accordance with the future land use map may be merited. The map also should reflect policy
statements in the land use plan. A visual analysis suggests many of the perceived issues with mass
and scale are a result of existing structures in or near the city center in zones that allow and
encourage larger buildings.
15
Page 9 of 15
Building Height
The maximum vertical extent of a building. Buildings vary by size, purpose, and site conditions. It is
difficult to identify a “correct” number that applies in all circumstances. For example, the Marriot
Residence Inn at 815 E main is a single structure but on a very sloped site. The vertical extent at
corners of the building are very different along Main St than along Village Downtown Blvd.
Height is also influenced by function. Theatres need scenery lofts, industrial sites may require tall
storage silos, and many buildings have elevator head spaces that project above the rest of the roof.
While exceptions can be created for specific functions, most zoning ordinances establish some type
of maximum size limit in a district. The PLI district is a local zoning district that does not have a
maximum height limit.
Maximum allowed height varies by district in the current UDC. Specified height number is often
subject to a variety of allowed encroachments and exceptions or other modifiers.
The authorized height in the B-3 district has changed over time. When zoning was initially adopted
in 1935, the Main Business District (designated with MB), the equivalent of the B-3 district today,
had no specified limit on height. See the following excerpt from the 1941 zoning map, letters are
residential zoning districts. A is the most restricted and D the most permissive residential districts.
1941 Zoning Map excerpt
16
Page 10 of 15
The B-3 district name was applied in 1973 to a larger area than the initial Main Business district as
shown on the following excerpt from the zoning map.
1973 Zoning Map excerpt
It was not until 1991 that a numerical height limit of 55 feet was uniformly applied to the B-3
district. Various exceptions were also authorized to height limits generally; and also applied in the
B-3 district. In 2002, the City kept the 55 feet limit for the area along Main Street that would
become B-3C, but raised the allowed height in the rest of the B-3 district to 70 feet. The update to
the B-3 district approved in 2025 raised the maximum building height in the B-3 district to 90 feet
which is enough to enable a seven story building. This was consistent with the recommendation
from the DBIP as discussed above.
How height is measured and what exceptions to height standards are available is established in
38.260.100.A. Whether or not a building is perceived as “too tall” depends on more than just a
single measurement. The City has also adopted other standards to help address the interaction
between adjacent developments.
Some photos of existing structures and heights of taller buildings in the community are attached to
assist in visualizing what the various heights mentioned above exist in the community. A map of
taller buildings in the Downtown area is also attached; as is a map showing locations of constructed
buildings over the past 10 years or so that have generated public comments on height. Please note
the location of most of those buildings are in the B-3 and B-2M districts and often on the edge of the
district.
17
Page 11 of 15
In 2015, after an open public review and participation process, the City Commission amended the
Design Guidelines to include Chapter 4B to distinguish between the applicable standards for the
area within the Main Street historic district and other portions of the B-3 zone. The revised
language was adopted by Resolution 4598 [external link]. Chapter 4B was later amended by
Resolution 4623 and readopted by Ordinance 1981 in 2017. The revised language supported
development of larger and taller buildings but did not change the maximum height allowed in the B-
3 district. Elements of the revised guidelines have become part of the UDC standards.
The placement of low-density zoning adjacent to the city core may contribute to property owners
feeling overwhelmed by development nearby. Rather than imposing development restrictions on
property within the city center, an alternative is to evaluate areas adjacent to the Downtown for
appropriate zoning to create an intensity transition from the B-3 to lower intensity districts further
from the city core. Should RA be directly adjacent to B-3 or is the B-2M or RC zone more consistent
with the Community Plan?
Wall Plate
Wall plate is a new standard to address massing, especially in less intensively developed areas. Wall
plate limits the maximum height of an exterior wall to prevent uninterrupted facades. A wall plate
standard is shorter than the maximum building height allowed in a district. Definitions and rules of
interpretation help explain terms used in the document. Wall plate is described in Sec.
38.260.100.B.
The combination of wall plate to constrain uninterrupted building wall size and a maximum
building height provide flexibility for the designer and predictability for adjacent owners and
residents. Wall plate is a response to public concern on scale of development, especially in existing
lower intensity areas experiencing redevelopment. Wall plate heights establish when a step back,
see discussion below, or other change in building design must occur to lessen visual and physical
mass of the building.
More intensive zoning districts may not have a wall plate limitation to allow them to have the taller
buildings that are intended in those districts. B-3 does not have a specified wall plate limit, but the
B-3C district does. The City Commission considered the potential requirement for a generally
applicable wall plate standard for B-3 during the June 24, 2025 code update work session on mass
and scale but decided not to establish one.
18
Page 12 of 15
Figure 38.260.100-3 illustrating measurement for wall plates.
Example of the B-3C – 38.220.060.B.1, excerpt of dimensional standards relating to massing below.
Articulation
The UDC also includes required standards for both vertical and horizontal articulation for both
residential and non-residential buildings that are subject to site plan reviews. See Section
38.520.040, Building Massing and Articulation. It is expected that any new building constructed in
the B-3 zoning district would be subject to site plan review. Smaller buildings like single dwelling or
four-dwelling buildings are not subject to the same standard. This standard was updated in 2025
and now requires a greater number of articulation features to be used, increases the degree of
19
Page 13 of 15
variation in wall or roof needed to meet an articulation standard, and increases the locations on a
building where articulation is required. There are some differences between residential and mixed-
use/non-residential building requirements. This standard does not directly limit the height of a
building; however, by dividing the massing into smaller visual modules it reduces the perceived
scale of a building.
The Neighborhood Conservation Overlay District (NCOD) design guidelines apply for sites located
within the NCOD. The Chapter 4B guidelines are specifically focused on the area included in the B-3
zoning district. An update to the design guidelines has been paused but are expected to start again
this winter.
Zone Edge Transitions and Step Backs
Zone edge transitions apply throughout the entire city when the defined condition of two dissimilar
zoning districts being adjacent exists (38.260.070). A zone edge transition is a tool to adjust the
abruptness of difference in building size at the edge of a zoning district.
Step-backs refer to step-like changes in the profile of a building where there is functional building
area for several stories and then the step inwards reduces the width or depth of the building from
that point onwards. See the image below. The flat areas created by the step-backs are often used as
outdoor terraces in both residential and commercial buildings. With step-backs, structures are
allowed to rise straight-up a certain height beyond which they are subject to recede from the initial
façade that follow a prescribed method to establish the step back. Extent of step backs in height and
depth may vary by district.
Although the names are similar, a setback is different than a step-back. A setback establishes a
distance, usually from a property line, and no part of the building is allowed to be placed within a
setback.
Bozeman previously used an inclined plane, of 45°, to establish the boundary of required step backs
as a zone edge transition method. This resulted in some structures with a sequence of small step
backs utilized as outdoor patios for the adjacent residential uses. Some public comments have
stated that this placement may lessen privacy or increase possible noise from activities in the open
spaces. Other methods measure from a different set of beginning points, but in all cases the building
must remain within the prescribed limits. In the current code, step backs are only applied at zone
edge transitions and in conjunction with wall plate heights in the B-3C district. There are very few
examples of constructed buildings implementing this standard at this time.
Section 38.260.070, Transitions, describes the circumstances when a step back is required. These
occur at the edges of zoning districts and primarily where residential and non-residential districts
adjoin. A map of these locations is included with the packet. Types 1a and 1b transitions include a
step back requirement, see image below for an example. The vertical height at which a building is
subject to the step back is determined by the maximum height of the adjacent district. For example,
the height at which a step-back must begin for projects adjacent to an RA district would be lower
20
Page 14 of 15
than if adjacent to the RB district. The type of applicable zone edge transition is determined by the
zoning of the lot subject to the requirement and the zoning on the abutting lot as set out in Table
38.260.070-1. Transitions are required where the degree of difference between districts is greatest.
There are four transition types to address different circumstances. Not all zoning boundaries
require a transition.
In addition to the step back, transitions in some locations are required to provide a greater distance
for the entire building (setback). For example, a lot in the B-3 district which is abutting a lot zoned
as RA or RB must add 3 feet to the width of the minimum setback shown as the “X” in the image
below.
A transition standard is not a substitute for placement of a zoning district in a proper place. The
Commission directed and approved numerous modifications to the zoning map with the 2025
update to remove locations where zoning district boundaries occurred within the same block. This
reduces potential conflicts by physically separating dissimilar districts.
Excerpt from 38.260.070
Transitions are a special case for mass and scale controls as they apply at district edges rather than
uniformly throughout a district. The best method for transitions is to place zoning districts at
streets, watercourses, or similar physical separations. The width of a standard local street right of
way (60 feet see below) is six times the minimum setback of the Type 1a no-alley setback (10 feet
see above). Elements located within the right-of-way are shown below. The placement of zoning
21
Page 15 of 15
district boundaries on streets inherently provides spacing between dissimilar districts. However,
such placement isn’t always feasible. Transitions lessen potential impacts in those circumstances.
Both the prior zoning regulations and the current regulations include as part of the standard that a
street (typical local right of way width of 60 feet) is by itself a transition by providing a large
physical separation. An alley is not of sufficient width to be a transition. Paragraph 38.260.070A.3.f
addresses this question of right of way width. Should a street be less than 60 feet wide, the
transition standard would apply to a proposed building as if the street were not present. If the
street is less than 60 feet wide, nothing in the language prevents a landowner from providing
additional right of way, either by subdivision exemption or by provision of a street and utility
easement, to widen the right of way. Whether the right of way is created by plat or easement, so
long as it is 60 feet or greater in width the transition requirement has been met by physical
separation from adjacent uses across the street.
A transition standard places all the burden of lessening perceived conflict on only one property to
the full benefit of the abutting property. It is therefore important to use care in establishing the
degree of restriction with a transition.
Street Trees
The municipal code, in both Chapter 16 and Chapter 38, requires planting of trees within the
boulevard strip (see right of way cross section above) with development. The City maintains
planted trees in the right of way. Proposed tree plantings are reviewed during the site plan review
process by the City Forester. Removals of trees require review and approval by the City Forester
and compensation to the City for the loss of the asset.
Although not a part of the building, street trees provide a visual barrier, a variation in height, and
change of materials when viewing a building. The average height of a mature street tree in Bozeman
is 60 feet tall. Trees therefore function as an additional element of transition between properties
whether they occur at a zone edge or within a zoning district.
Staff will present further visuals and information at the meeting to assist in the understanding of
regulating mass and scale tools as they relate to these issues and the questions identified at the
beginning of the document.
22
*All Measurements
Accuracy: +/- 2'
110'
Agriculture Depot
Armory
Baxter
Radio Tower
Courthouse Evergreen
Tree
Holy Rosary Church
Story Mill
The National
The Bozeman
South Hedges
Leon Johnson
Roskie
92'
101'
67'
118'
105'
79'
74'
126'
102'
90'
105'
65'
65'
54'
112'
120'
118'
105'
Note: Reference measurement data
collected via Google LIDAR and/or with
a clinometer. Target Accuracy: +/- 2'
23
24
18,0560.6
Miles
This product is for informational purposes and may not have been prepared for, or be suitable for legal, engineering, or
surveying purposes. Users of this information should review or consult the primary data and information sources to
ascertain the usability of the information. Feet
2,1030
Legend
1,051
Location
2,103
07/20/2026
Created By:
Created For:
Date:
Zoning (eff. 1 Feb 2026)
RD (R-5) Residential High
RC (R-4)Residential Medium
RB (R-3) Residential Medium-Low
RA (R-S, R-1, R-2) Residential Low
PLI Public Lands and Institutions
B-1 Local Service Mixed Use
B-2 Community Business
B-2M Community Mixed Use
B-3 Downtown Mixed Use
B-3C Downtown Mixed Use Core
BP Business Park
REMU Residential Emphasis Mixed Use
M-1 Light Manufacturing
M-2 Manufacturing and Industrial
R-MH Residential Manufactured Home
NEHMU Northeast Historic Mixed-Use
PDZ Planned Development Zone
City Limits
World Imagery
Low Resolution 15m Imagery
High Resolution 60cm Imagery
High Resolution 30cm Imagery
Citations
4.8m Resolution Metadata
25
26
27
Memorandum
REPORT TO:Bozeman Downtown Business Improvement District Board
FROM:Emily Cope, Downtown Bozeman Partnership
SUBJECT:Economic Development Director's Report & Finance Report
MEETING DATE:August 19, 2026
AGENDA ITEM TYPE:Plan/Report/Study
RECOMMENDATION:Discuss.
STRATEGIC PLAN:4.4 Vibrant Downtown, Districts & Centers: Promote a healthy, vibrant
Downtown, Midtown, and other commercial districts and neighborhood
centers – including higher densities and intensification of use in these key
areas.
BACKGROUND:Emily will provide an update on downtown projects and maintenance
programs.
UNRESOLVED ISSUES:None.
ALTERNATIVES:None.
FISCAL EFFECTS:None.
Attachments:
BID EDD Report 8-26.pdf
BID Finance Report 8-26.pdf
Report compiled on: August 11, 2026
28
Economic Development Director’s Report
Business Improvement District Board
August 2026
Downtown Updates
• Change in assessment collections for Fiscal Year 2028.
• We’re hiring!
Below are the maintenance statistics comparing the year-to-date figures from this year (FY27) to the
corresponding stats from last year (FY26).
FY2026 Y-T-D FY2027 Y-T-D
Total Avg/mnth Total Avg/mnth Difference
Trash Emptied 694 694 687 687 +7
Recycling Emptied 174 174 166 166 +8
Graffiti Removed 5 5 21 21 +16
City of Bozeman Projects
• Bozeman Creek Plan: Vision plan presentation on December 15th at City Commission Meeting.
Learn More.
• Construction season is in full swing, stay up to date with street closures here.
Upcoming City of Bozeman Public Meetings Calendar: https://www.bozeman.net/departments/city-
commission/advisory-boards/calendar
• City Commission Meeting- August 25th at 6pm in City Hall: Height in B3 and Zone Edge
Transition
View recorded meeting videos here: Meeting Videos | City Of Bozeman.
Upcoming Events:
• Walk the Block Mondays – Every Monday, meet at the Baxter at 1pm. Join us for this great way
to get to know your neighbors!
• Summer Art Walks- September 11
• MSU Community Cat Walk- August 21
• MSU Homecoming Pep Rally-September 25
• Downtown Trick-or-Treating- October 30
• Ladies’ Night- November 19
• DBA Events Calendar
29
Downtown BID August 2026 Finance Report
APPROVED Y-T-D
FY2027 FY2027
Income
BID Assessment 295,000.00$ 295,000.00$
Contract Income 26,000.00$
Interest Income 100.00$
Mobile Vending Fees 1,500.00$ 3,500.00$
Flower Sponsorships 10,000.00$
Christmas Light Sponsorships 3,000.00$
Streetlamp Banners 15,000.00$ 1,000.00$
Total Income 350,600.00$ 299,500.00$
Expenses
Management Fee 89,000.00$ 44,500.00$
Total Expenses 89,000.00$ 44,500.00$
Payroll Expenses
Maintenance Staff 85,000.00$ 11,017.00$
Taxes 5,500.00$ 892.37$
Work Comp 3,500.00$
Maintenance Staff--Garage 25,000.00$
Taxes 950.00$
Work Comp 950.00$
Total Payroll Expenses 120,900.00$ 11,909.37$
Programs
Downtown Safety Program 15,000.00$
DBA Support 28,500.00$ 28,500.00$
Holiday Lights 2,500.00$
Holiday Light Spider Repair 2,500.00$
Holiday Lights Storage 1,675.00$
Holiday Lights- Reserve Fund 15,000.00$
New Banners 5,000.00$ 7,076.00$
Flower Expenses 36,000.00$ 407.90$
Flower Water 400.00$ 68.85$
Marketing 3,500.00$ 3,500.00$
Maintenance Supplies 5,000.00$ 965.12$
Garbage Bags 3,250.00$
Graffiti Supplies 750.00$
Graffiti Contracted Removal 5,000.00$
Mule Service & Fuel 2,100.00$ 76.57$
Truck Service & Fuel 2,700.00$ 264.04$
Truck-Mule Insurance 7,650.00$
Hazmat Clean Up 2,000.00$ 562.70$
Program Contingency 2,000.00$ 43.37$
Total Program Expenses 140,525.00$ 41,464.55$
Total BID Expenses 350,425.00$ 97,873.92$
NET ASSESSMENT INCOME 175$ 201,626$
Checking Account Balance 298,934.59$
Certificate of Deposit Balance 137,526.27$
Total Cash On Hand Total 436,460.86$
30