Loading...
HomeMy WebLinkAbout26 - Amendments Amendment Number Unknown - Morrison-Maierle, Inc. - Materials Testing Term Contract Fifth Amendment to Professional Services Agreement for Materials Testing Term Contract FY 2026 – FY 2027 Page 1 of 2 FIFTH AMENDMENT TO PROFESSIONAL SERVICES AGREEMENT THIS FIFTH AMENDMENT TO THE PROFESSIONAL SERVICES AGREEMENT FOR Materials Testing Term Contract dated June 28, 2022 (the “Agreement”) is made and entered into this 14th day of July, 2026, by and between the CITY OF BOZEMAN, MONTANA, a self governing municipal corporation organized and existing under its Charter and the laws of the State of Montana, 121 North Rouse Street, Bozeman, Montana, with a mailing address of PO Box 1230, Bozeman, MT 59771, hereinafter referred to as “City,” and Morrison-Maierle, Inc., hereinafter referred to as “Contractor.” In consideration of the mutual covenants and agreements herein contained, the receipt and sufficiency whereof being hereby acknowledged, the parties hereto agree to amend the Agreement as follows: 1. Scope of Services. Scope of services and budget for McIlhattan Road Project is outlined in Attachment A-1. 2. Addition to Payment. Current Unit Rate Schedule. Attachment A-2 has been added to the payment provisions. 3. Agreement still valid. All remaining terms and provisions of the Agreement remain in effect. **** END OF AGREEMENT EXCEPT FOR SIGNATURES **** Docusign Envelope ID: 521D75E8-9BFE-8539-80EB-723091C0CA14 Fifth Amendment to Professional Services Agreement for Materials Testing Term Contract FY 2026 – FY 2027 Page 2 of 2 IN WITNESS WHEREOF, the parties hereto have executed this instrument the day and year first above written. CITY OF BOZEMAN, MONTANA [Morrison-Maierle, Inc.] By________________________________ By_____________________________ Chuck Winn, City Manager Print Name: Travis Eickman Title: Bozeman Operations Manager APPROVED AS TO FORM By_______________________________ Greg Sullivan, Bozeman City Attorney Docusign Envelope ID: 521D75E8-9BFE-8539-80EB-723091C0CA14 Attachment A-1 Scope of Services Provide Resident Project Representative (RPR) and Material testing. Material testing will be performed in compliance with the City of Bozeman’s Design Standards and Specification Policy for soils, aggregates, concrete, and asphalt. Material testing will be provided as necessary for the project listed below. x McIllhattan Road Project Results of failed tests will be provided to the contractor and the CIty upon the conclusion of the test. All testing results will be summarized in a weekly report specific to each project and will be provided to the City. Testing is to be provided at the rates listed on the Laboratory Rate Schedule, Labor Rate Schedule and Expense Rate Schedule provided below: Laboratory Rate Schedule Test Rate per Test Proctor – AASHTO T180 – Material less than 3” $420 Sieve Analysis – AASHTO T27 (ASTM C136) – Materials less than 3” (less than #4 washed) $185 Sieve Analysis – AASHTO T27 (ASTM C136) – Materials 3” to 4” (less than #4 washed) $450 Atterberg Limits - AASHTO T89, T90 (ASTM D4318) $180 Concrete Cylinders – Strength Test – 4” Cylinders $180 per set of 4 Bituminous Field Marshall – AASHTO T1559 (ASTM 245) $550 Asphalt Core - Thickness and Density $120 per set of 3 Laboratory rate includes labor and expenses for testing and reporting once the sample is delivered and cataloged into the lab for processing. Labor Rate Schedule See attachment A-2. Expense Rate Schedule Expense Rate Nuclear Density Meter $15/hour or $50/day Vehicle $0.985/mile Asphalt Coring (if outside service used) Cost plus 5% Miscellaneous Expenses Cost plus 5% Docusign Envelope ID: 521D75E8-9BFE-8539-80EB-723091C0CA14 Budget Requesting addition amendment budget for the McIllhattan Road Project of $53,429 to be added to the professional services agreement. The overall project budget is approximately $1,500,000. Actual effort will be billed per the rate schedule and will be dependent on the amount of RPR time and testing required. RPR effort is estimated at 2 hours per day on average over the 75 calendar day construction period. END Docusign Envelope ID: 521D75E8-9BFE-8539-80EB-723091C0CA14 Attachment A-2 Docusign Envelope ID: 521D75E8-9BFE-8539-80EB-723091C0CA14 McIllhattan Road Project June 9, 2026 Engineering Fee Estimate - Summary MAJOR WORK ITEM Survey Construction Staking $0 Onsite Observation / Testing RPR Onsite Observation $41,398 Testing Plan Review Pre-Construction Conference Project Management Coordination $7,720 Reporting Pay Requests Direct Expenses Direct Expenses $4,312 Estimate Total =$53,429 ESTIMATE ASSUMPTIONS: No overtime, no night , weekend and/or Holiday work. Paving will be approximately three (3) days 75 day contract project observation at 25% C:\Users\jullman\AppData\Local\Temp\Bluebeam Software\75101685 Docusign Envelope ID: 521D75E8-9BFE-8539-80EB-723091C0CA14