HomeMy WebLinkAboutResolutions 2026-54 - APPROVING ALTERATION OR MODIFICATION OF CONTRACT WITH HASELDEN MONTANA CONSTRUCTORS RESOLUTION 2026-54 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF BOZEMAN, MONTANA, APPROVING ALTERATION OR MODIFICATION OF CONTRACT WITH HASELDEN MONTANA CONSTRUCTORS WHEREAS, the City Commission did, on the 7th day of October 7, 2025 authorize award of the bid for the I-Ho Pomeroy Peace Park Project to Haselden Montana Constructors; and WHEREAS, Section 7-5-4308, Montana Code Annotated, provides that any such alterations or modifications of the specifications and/or plans of the contract be made by resolution; and WHEREAS, it has become necessary in the prosecution of the work to make alterations or modifications to the specifications and/or plans of the contract. NOW, THEREFORE, BE IT RESOLVED by the City Commission of the City of Bozeman, Montana, to wit: that the proposed modifications and/or alterations to the contract between the City of Bozeman, a municipal corporation, and Haselden Montana Constructors, as contained in Prime Change Order No. 2, attached hereto, be and the same are hereby approved; and the City Manager is hereby authorized and directed to execute the contract change order for and on behalf of the City; and the City Clerk is authorized and directed to attest such signature. Docusign Envelope ID: F4ADC016-A7D8-83D7-8009-FE2AE7E3B06A PASSED, ADOPTED, AND APPROVED by the City Commission of the City of Bozeman, Montana, at a regular session thereof held on the 14th day of July, 2026. ___________________________________ JOEY MORRISON Mayor ATTEST: ___________________________________ MIKE MAAS City Clerk APPROVED AS TO FORM: ___________________________________ GREG SULLIVAN City Attorney Docusign Envelope ID: F4ADC016-A7D8-83D7-8009-FE2AE7E3B06A EJCDC® C-941, Change Order EJCDC® C-941, Change Order, Rev.1. Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies and American Society of Civil Engineers. All rights reserved. Page 1 of 1 CHANGE ORDER NO.: 4 Owner: City of Bozeman Owner’s Project No.: 25072 Engineer: Sanbell Engineer’s Project No.: 24006.03 Contractor: Haselden Montana Constructors LLC Contractor’s Project No.: 250604 Project: I-Ho Pomeroy Peace Park Contract Name: I-Ho Pomeroy Peace Park Date Issued: 6/9/2026 Effective Date of Change Order: The Contract is modified as follows upon execution of this Change Order: Description: Change includes the removal and replacement of 2 ash trees on Mendenhall. This also includes the change of rock mulch to wood mulch in a ring around all trees in the newly mulched areas. Attachments: XCO 5 – RFI 09 – Tree Replacement and Mulch Changes from Haselden; RFI #9: Tree Replacement and Mulch Changes Change in Contract Times [State Contract Times as either a specific date or a Change in Contract Price number of days] Original Contract Price: $ 509,593.63 Original Contract Times: Substantial Completion: 6/3/2026 Ready for final payment: 7/3/2026 [Increase] [Decrease] from previously approved Change Orders No. 1 to No. 3: $ 31,820.44 [Increase] [Decrease] from previously approved Change Orders No.1 to No. 2 : Substantial Completion: N/A Ready for final payment: N/A Contract Price prior to this Change Order: $ 541,414.07 Contract Times prior to this Change Order: Substantial Completion: 6/3/2026 Ready for final payment: 7/3/2026 [Increase] [Decrease] this Change Order: $ 10,855.34 [Increase] [Decrease] this Change Order: Substantial Completion: N/A Ready for final payment: N/A Contract Price incorporating this Change Order: $ 552,269.41 Contract Times with all approved Change Orders: Substantial Completion: 6/3/2026 Ready for final payment: 7/3/2026 By: Title: Date: By: Title: Recommended by Engineer (if required) Accepted by Contractor N/A Authorized by Owner Approved by Funding Agency (if applicable) Date: Docusign Envelope ID: F4ADC016-A7D8-83D7-8009-FE2AE7E3B06A 7/15/2026 City Manager Potential Change Order HASELDEN MONTANA CONSTRUCTORS LLC 1283 NORTH 14TH AVENUE, STE 103 BOZEMAN, MT 59718 Project: Contract Number: Proposed CO #: 250604- XCO 5 I-HO POMEROY PEACE PARK RFI 09 - Tree Replacement and Mulch Changes I-HO POMEROY PEACE PARK 106 E MENDENHALL ST BOZEMAN, MT 59715 We are requesting to make the following changes in this Contract: To (Owner): BOZEMAN, MT 59715 CITY OF BOZEMAN 121 N ROUSE AVE Change in Days: Change Order Date :05/12/26 0 Change includes the removal and replacement of 2 ash trees on Mendenhall. This also includes the change of rock mulch to wood mulch in a ring around all trees in the newly mulched areas. AmountUnit PriceDescriptionUMUnitsContract Item 329000. 9 LS LANDSCAPING SUBCONTRACTOR 9,932.34RFI 09 - Tree Replacement and Mulch Changes SUBTOTAL:$9,932.34 10.00Warranty 66.00General Liability 847.00Overhead & Profit $923.00Total Markups: Total For Change Order: 24,513.44 Schedule Impact (Days): 0 $10,855.34 Authorized By Owner:Architect/Engineer:Accepted By Contractor: By: _______________________________By: _____________________________By: ________________________________ Date:_______________________________Date:____________________________Date:______________________________ HASELDEN MONTANA CONSTRUCTORS LLC 1283 NORTH 14TH AVENUE, STE 103 BOZEMAN, MT 59718 CITY OF BOZEMAN 121 N ROUSE AVE BOZEMAN, MT 59715 , Page 1 Viewpoint Remote .rpt 05/12/26 02:01:27 PMHASELDEN MONTANA CONST 5.12.26 Docusign Envelope ID: F4ADC016-A7D8-83D7-8009-FE2AE7E3B06A 150 Rae Lane Belgrade, MT 59714 (406) 404-7377 info@webbylandscaping.com CHANGE ORDER REQUEST Date: 5/6/2026 Prepared for: Project: Name HASELDEN Name I-HO PEACE PARK Address 1283 NORTH 14TH AVENUE #103 Project Address 106 EAST MENDENHALL City, State, Zip BOZEMAN, MT, 59715 City, State, Zip BOZEMAN, MT, 59715 The estimate is valid for 30 days. TREE REMOVAL ● Location: Intersection of East Mendenhall & North Black ● Scope of Work: * Remove (2) Green Ash trees * Primary removal focused on (2) trees closest to East Mendenhall * Haul away all debris and clean up work area ● Notes: * Trees located at intersection of East Mendenhall and North Black * Ensure safe access and traffic awareness during removal STUMP GRINDING ● Scope of Work: * Grind stumps from removed trees * Grind approximately 24 inches (2 feet) below grade to allow for replanting in the same location * Perform extensive grinding to ensure adequate depth. Docusign Envelope ID: F4ADC016-A7D8-83D7-8009-FE2AE7E3B06A ● Notes: * Depth required for future tree planting * Haul away grindings * Final area left ready for replanting * Removal of stumps not included, grinding only. REPLACEMENT TREES ● Scope of Work: * Installation of (2) 2.25” Triumph Elms in the same locations of the 2 Green Ash removed. Per L3.1 Spec 1 on drawings * Installation of drip irrigation to supply adequate watering per L5.1 Spec 6 on drawings Switching Rock Bark Around Trees to Shredded Western Cedar Mulch ● Scope of Work: * Deductive change for planned rock bark in 4’ diameter around all specified trees on L2.2 SANBELL MARKUP 5.05.2026 * Shredded Western Cedar Mulch installed 4’ diameter around all specified trees on L2.2 SANBELL MARKUP 5.05.2026 ● Notes: * Mulch will be watered and tamped down during installation, and slightly below surrounding grade of paved surfaces Removing Newly Planted Plants Around Green Ash to be Removed ● Scope of Work: * Removal of plant material in immediate affected vicinity of Green Ash to be removed * Removal of drip irrigation in immediate affected vicinity of Green Ash to be removed * Re installation of plant material in immediate affected vicinity of Green Ash to be removed Docusign Envelope ID: F4ADC016-A7D8-83D7-8009-FE2AE7E3B06A * Re installation of drip irrigation in immediate affected vicinity of Green Ash to be removed ● Notes: * Plants to be removed will not be damaged in the process. Re installation of the same plants. Subtotal $9,834 1% Montana Gross Receipts Tax 1% Total $9,932.34 Docusign Envelope ID: F4ADC016-A7D8-83D7-8009-FE2AE7E3B06A Haselden Construction, LLC 1174 Stoneridge Dr, Suite 59718 Bozeman, Montana 59718 P: (406) 555-5555 Project: 250604- I-Ho Pomeroy Peace Park 106 E. Mendenhall St. Bozeman, Montana 59715     RFI #9: Tree Replacement and Mulch Changes   Revision 0 Status Closed on 05/20/26 To Kendra Piedalue (Sanbell) From Levi Prevost (Haselden Montana Constructors) 6950 South Potomac Street Centennial, Colorado 80112 Date Initiated May 12, 2026 Due Date May 15, 2026 Location Cost Impact $11,000.00 Schedule Impact Spec Section Cost Code Drawing Number L1.1 Reference Linked Drawings   Received From Raine Martin (Webby Landscaping) Copies To   RFI Reason Design Change     Activity   Question Question from Levi Prevost Haselden Montana Constructors on Tuesday, May 12, 2026 at 10:52 AM MDT  Please confirm we are to remove replace the 2 trees on Mendenhall as discussed with the Alex Nordquest, the City of Bozeman arborist.  These trees will be replaced with a Triumph Elm.   Please also confirm we are to change to wood mulch in a ring around all trees per the markup on the attached plan.  Attachments Tree Removal Coordination_2026 0505.pdf   Official Response Response from Kendra Piedalue Sanbell on Wednesday, May 20, 2026 at 03:22 PM MDT  •Confirmed the removal of two trees on Mendenhall as discussed with Alex Nordquest.  •Confirmed replacement of said removed trees with Triumph Elm.  •Confirmed wood ring mulch around all trees per markup.     All Replies Response from Kendra Piedalue Sanbell on Wednesday, May 20, 2026 at 03:22 PM MDT  •Confirmed the removal of two trees on Mendenhall as discussed with Alex Nordquest.  •Confirmed replacement of said removed trees with Triumph Elm.  •Confirmed wood ring mulch around all trees per markup.       Haselden Construction, LLC Page 1 of 1 Printed On: Jun 9, 2026 03:06 PM MDT    Docusign Envelope ID: F4ADC016-A7D8-83D7-8009-FE2AE7E3B06A SYMBOLCODEDESCRIPTIONQTYROCK MULCH - MATCH EXISTING1,606 SFPAVERS - MATCH EXISTING208 SF1002001L3.34L3.12L3.1E MENDENHALL STN BLACK AVE 8.00'5.94'13.26'40.00'8.00'2.00'8.00'2.00'8.00'2.00'8.00'2.00'6.02'14.68'5L3.22001001002001001001004.00'E MENDENHALL STN BLACK AVE HONGSALMUN ARCHES1L3.2BOULDER3L3.2BIKE RACK8L3.1ROCK MULCHTREE VAULT SECTIONTREE GUARD5L3.2CONCRETE SEAT WALL5L3.2CONCRETE SEAT WALLCONCRETE SEAT WALL7L3.2PEACE POLE4L3.2PAVERS2L3.2BENCH - PAVER EXTENSIONMOUNT ON PAVERSEX. TREE GRATESEE CIVIL FOR SIDEWALK,RAMP, AND BUMP OUT LAYOUTCONCRETE PAVING - SEE CIVILCENTER BIKE PARKING AREABETWEEN EXISTING TREES2.00'9.00'9.00'EQ.EQ.EQ.EQ.CENTER SEAT WALLBETWEEN EXISTINGTREESCONCRETE PAVING - SEE CIVIL3L3.3STEEL SIGN AND ART -INTERNAL SEAT WALL10L3.2STEEL ART - SEAT WALLS10L3.2STEEL ART - SEAT WALLS1L3.3HONGSALMUN ARCHES8.14'SIGHT TRIANGLESIGHT TRIANGLESIGHT TRIANGLEPLANTER BY OWNER, TYP.100100100COBBLE - SEE CIVILFOR CONSTRUCTION FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION 106 EAST MENDENHALL STREET MATERIALS AND LAYOUT PLAN I-HO POMEROY PEACE PARK POCKET PARK AND PARKING LOT IMPROVEMENTS BOZEMAN, MONTANAL1.1CN/KP 24006_03_LS_PROD.DWG DE/KA/TH 02-18-2025 SITE PLAN MOD 05-19-2025 08-05-2025 11-18-2025 - - - SITE PLAN MOD 2 BID SET IFC - - - -- 24006_03 LAYOUT NOTES1.ALL SITE IMPROVEMENTS SHALL BE FIELD SURVEYED AND STAKED BY CONTRACTOR. RECEIVE OWNER’SREPRESENTATIVE APPROVAL OF STAKED LOCATIONS OF IMPROVEMENTS PRIOR TO INSTALLATION START-UP.2.RECEIVE OWNER’S REPRESENTATIVE APPROVAL OF FINAL STAKING BY CONTRACTOR OF ALL CONCRETEFLATWORK PRIOR TO CONSTRUCTION AND ALL FORM WORK PRIOR TO POURING.3.ALL DIMENSIONS SHALL BE VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION. ANY DEVIATION FROM THESEPLANS MUST BE APPROVED BY OWNER’S REPRESENTATIVE PRIOR TO CONSTRUCTION.4.PRIOR TO EXCAVATION, UNDERGROUND UTILITIES SHALL BE FIELD VERIFIED.5.NOTIFY OWNER’S REPRESENTATIVE IMMEDIATELY OF ANY DISCREPANCY BETWEEN WRITTEN COORDINATEPOINTS/ELEVATIONS AND DIGITAL INFORMATION.6.ALL CONTROL JOINTS SHALL BE SAWCUT AND SPACED AS INDICATED ON THE DRAWINGS AND DETAILS.EXPANSION JOINTS SHALL BE PLACED AS INDICATED ON THE DRAWINGS OR EVERY 80’.LEGEND010SCALE: 1" = 10'510MATERIAL NOTES1.MATERIAL QUANTITIES SHOWN IN SCHEDULE FOR REFERENCE PURPOSES. CONTRACTOR TO SELF-VERIFYMATERIAL AMOUNTS AND TOTALS BASED ON PLAN REVIEW.2.CONTRACTOR TO SUBMIT MATERIAL SAMPLES FOR APPROVAL BY LANDSCAPE ARCHITECTURE. ALL MATERIALSSHALL COMPLY WITH THEIR RESPECTIVE AND APPLICABLE STANDARDS.RFI#3RFI#3P:\24006_03_URD_DTN24-0021_I-Ho_Peace_Park_Sign\CADD_C3D\PRODUCTION_DWG\24006_03_LS_PROD.dwg, L1.1 MATERIALS AND LAYOUT PLAN, 11/18/2025 1:05:24 PM, amartoncik, 1:1 TREE REMOVAL COORDINATION05.05.2026SANBELL MARKUPPlace 4'-0" diameter ring ofwood mulch around all newand ex. trees, typ. Seesheet L2.2 for more infoDocusign Envelope ID: F4ADC016-A7D8-83D7-8009-FE2AE7E3B06A E MENDENHALL STN BLACK AVE E MENDENHALL STN BLACK AVE 3L3.1(1) PC(3) SP(3) HO(5) SP(3) EA(3) SP(7) EA(5) HS(5) HO(5) EA(3) ER(5) SP(14) CK(5) SP(5) HO(4) CK(12) RG(5) SP1L3.1DECIDUOUS TREE5L3.1SHRUB PLANTING6L3.1PERENNIAL/GRASS/GROUNDCOVERPLANTING3L3.1BIO-RETENTION SWALE(1) PC(3) SP(3) SP(1) AS(3) IREX. TREE GRATEBIO-RETENTION SWALE(5) SP(7) DT(3) SP(3) HO(3) SP(3) HO(4) HS(2) SN(3) HS(3) HS(3) SN(5) HO(3) HS(3) SNSIGHT TRIANGLESIGHT TRIANGLESIGHT TRIANGLE(2) SN(27) CK(10) HO(3) HS(3) HS(8) SH(6) IR(3) DT(7) SH(3) DT(5) DT(3) IR(3) SH(3) DT(6) SH(5) SH(4) IR(3) SH(2) DT(5) SH(3) DT(1) PCFOR CONSTRUCTION FILE: PROJECT NO: CAD: QUALITY ASSURANCE: DRAWING HISTORY DATE DESCRIPTION 106 EAST MENDENHALL STREET PLANTING PLAN I-HO POMEROY PEACE PARK POCKET PARK AND PARKING LOT IMPROVEMENTS BOZEMAN, MONTANAL2.2CN/KP 24006_03_LS_PLANTING.DWG DE/KA/TH 02-18-2025 SITE PLAN MOD 05-19-2025 08-05-2025 11-18-2025 - - - SITE PLAN MOD 2 BID SET IFC - - - -- 24006_03010SCALE: 1" = 10'510SOUTH POCKET PARKP:\24006_03_URD_DTN24-0021_I-Ho_Peace_Park_Sign\CADD_C3D\PRODUCTION_DWG\24006_03_LS_PLANTING.dwg, L2.2 PLANTING PLAN, 11/18/2025 1:05:50 PM, amartoncik, 1:1 TREE REMOVAL COORDINATION05.05.2026SANBELL MARKUPPlace 4'-0" diameter ringof wood mulch around allnew and ex. trees, typ.Replace Ex. treewith 2" Triumph ElmRock mulch, typ. seesheet L1.1Docusign Envelope ID: F4ADC016-A7D8-83D7-8009-FE2AE7E3B06A