HomeMy WebLinkAboutChildrens Room PreBid RFI Q&A DocumentBozeman Library Children’s Room Renovation Project Pre-Bid RFI Questions / Answers Children’s Room RFIs & Responses Q1: A1: Q2: Is a price proposal required as part of the RFP submission package? A2: Bozeman Library Children’s Room Renovation Project Pre-Bid RFI Questions / Answers Q3/A3: Bozeman Library Children’s Room Renovation Project Pre-Bid RFI Questions / Answers Q4/A4: Bozeman Library Children’s Room Renovation Project Pre-Bid RFI Questions / Answers Q5/A5: Bozeman Library Children’s Room Renovation Project Pre-Bid RFI Questions / Answers Q6/A6: Q7/A7: - Construction temp walls, sound barriers may be required [A/E – Requirements for temporary walls and sound barriers will be coordinated between Owner and GC after award of BID. GC should assume that it is generally acceptable to plan on relying on closed doors into the space to satisfy the needs of both temp walls and sound barriers. – OWNER TO CONFIRM] - Plumbing tie in location is likely above a hard lid ceiling [A/E – The tie in location shown is based on record drawings. The GC will need to coordinate actual locations in field as req’d to accomplish new work, and is responsible for patching and repairing any finishes. GC will need to coordinate with OWNER for timing and duration of any work that is req’d to be completed outside of the main project area.] - Existing speakers in main staff office may or may not be included in scope, clarification required. [ARCH – existing paging system components will be relocated. Updated drawings will be published in future addendum] - Site security for laydown area is a concern; project is in a busy area and there is a potential for vagrancy [OWNER to advise on preferred laydown area – OWNER and GC will coordinate final location and security after GC is selected. OWNER to clarify if costs should be included in bids, or if this will be negotiated after award of bid, prior to award of final contract] Laydown and ingress/egress will be negotiated after award, but we would be willing to look at potential logistical plan if a contractor chooses to include within their proposal. - Construction parking not yet defined [OWNER to advise] Select, reserved parking will be made available to contractors but the number of stalls and location of stalls is yet to be determined. - Discussed any known unknowns: - M: Exact locations of existing return air transfer openings are unknown. Everything on plan was drawn from published as-builts, but a lot of the transfer locations are in inaccessible ceilings. These openings need to be preserved. - P: Exact routing and sizes of plumbing. Everything on plan was drawn from published as-builts. [ARCH - Drawings describe design intent based on existing information and verification on site – GC is responsible for confirming configuration of existing work and maintaining functionality of systems noted to remain in place]