We hereby submit for your consideration the following product instead of the specified item for the
following project: Bozeman Public Library
PROJECTTITLE .hi 1 drPn',q Ranm Remoc3_el_ PROJECT NO. 2025021
DRAWING NO. DRAWING TITLE
SPEC. SECTION SPEC.TITLE PARAGRAPH SPECIFIED ITEM
23 37 13 Grilles. Registers and D'ffu ers 2.01
Proposed Substitution: MetalAIre (Greenheck_Z_
Attach complete information on changes to Drawings and/or Specifications which proposed
substitution will require for its proper installation.
Submit,with request, all necessary samples and substantiating data to prove equal quality and
performance to that which is specified. Clearly mark manufacturer's literature to indicate equality in
performance.
Substitutions of the materials and equipment described in the Contract Documents will be considered
during the bidding period upon receipt of a written request to the Architect for approval up to ten
(10)days before receipt of bids. Verbal or written requests without the completed Substitution
Request Form will not be considered.
CERTIFICATION OF EQUAL PERFORMANCE AND ASSUMPTION OF LIABILITY FOR EQUAL PERFORMANCE
The undersigned states that the function, appearance, and quality are equivalent or superior to the
specified item.
sub fLted;by: Keel' JtVright
Ignature
Sound Air LLC
Firm
422 9th Street S. Great Falls, MT 59405
Address
406-727-8483 keeli@soundairine.com 8/4/26
Telephone Email Date
Signature shall be by person having authority to legally bind his firm to the above terms. Failure to
provide legally binding signature will result in retraction of approval.
Fill in Blanks Below:
Does the substitution affect dimensions shown on Drawings? Yes
If yes, clearly indicate changes:
Will the undersigned pay for changes to the buildinR design, including engineering and detailing costs
caused by the requested substitution? Yes No
If no, fully explain:
What effect does substitution have on other Contracts or other trades?
None
What effect does substitution have on construction schedule?
None
Bozeman Public Library Children's Room and Teen Corner Remodel 01 60 10.01
Bozeman, MT 59715 SUBSTII UTION REQUEST FORM
MSR Design 412025021BCR Page 1 of 2
Manufacturer's warranties of the proposed and specified items are:
XX Same Different (Explain on Attachment)
Reason for Request:
_MAnuf-acture no 1's ed in specs _
Itemized comparison of specified item(s)with the proposed substitution.
List significant variations:
None
Accurate cost data comparing proposed substitution with product specified:
--None -- - ---
Designation of maintenance services and sources:
(ATTACH ADDITIONAL SHEETS IF REQUIRED)
For Use by Design Professional.
x Recommended Recommended as Noted
Not Recommended Received Too Late
Signed By Carly Svenvold PE
Date 8/4/2026
For Use by Owner's Representative or Owner:
X - Approved Approved as Noted
---- - Signed by:
No A roved ��� '" Approved Too Late
Signed By � A .U�t,Y _
Date FEED0681654E4C7 8/5/2026
END OF SECTION
Bozeman Public Library Children's Room and Teen Corner Remodel 01 60 10.01
Bozeman, MT 5971S SUBSTITUTION REQUEST FORM
MSR Design 42025021BCR Page 2 of 2
SECTION 0160 10.01
SUBSTITUTION REQUEST FORM
We hereby submit for your consideration the following product instead of the specified item for the
following project: Bozeman Public Library
PROJECTTITLE ChildrPn's Room RPmodPl PROJECT NO. ?n?512i
DRAWING NO. DRAWING TITLE
SPEC.SECTION SPEC.TITLE PARAGRAPH SPECIFIED ITEM
23 33 00 Air Duct Accessor=e!s 2.05 Control Dampers
Proposed Substitution: Greenheck
Attach complete information on changes to Drawings and/or Specifications which proposed
substitution will require for its proper installation.
Submit,with request, all necessary samples and substantiating data to prove equal quality and
performance to that which is specified. Clearly mark manufacturer's literature to indicate equality in
performance.
Substitutions of the materials and equipment described in the Contract Documents will be considered
during the bidding period upon receipt of a written request to the Architect for approval up to ten
(10)days before receipt of bids. Verbal or written requests without the completed Substitution
Request Form will not be considered.
CERTIFICATION OF EQUAL PERFORMANCE AND ASSUMPTION OF LIABILITY FOR EQUAL PERFORMANCE
The undersigned states that the function, appearance,and quality are equivalent or superior to the
specified item.
Sub itted,.by: Keel' yir.ight
�N /
lgn ttu' rep — v
Sound Air LLC
Firm
422 9th Street S. Great Falls, MT 59405
Address
406-727-8483 keeliLsoundairinc.com 8/4/26
Telephone Email Date
Signature shall be by person having authority to legally bind his firm to the above terms. Failure to
provide legally binding signature will result in retraction of approval.
Fill in Blanks Below:
Does the substitution affect dimensions shown on Drawings? Yes
If yes, clearly indicate changes:
Will the undersigned pay for changes to the build' . design, including engineering and detailing costs
caused by the requested substitution? Yes No
If no,fully explain:
What effect does substitution have on other Contracts or other trades?
None
What effect does substitution have on construction schedule?
None
Bozeman Public Library Children's Room and Teen Corner Remodel 0160 10.01
Bozeman, MT 59715 SUBSTITUTION REQUEST FORM
MSR Design 42025021BCR Page 1 of 2
Manufacturer's warranties of the proposed and specified items are:
XX Same Different(Explain on Attachment)
Reason for Request:
Manufa tire not ! Ct_.Pr1 in Specs
Itemized comparison of specified item(s)with the proposed substitution.
List significant variations:
None
Accurate cost data comparing proposed substitution with product specified:
Designation of maintenance services and sources:
(ATTACH ADDITIONAL SHEETS IF REQUIRED)
For Use by Design Professional:
_ X Recommended Recommended as Noted
Not Recommended Received Too Late
Signed By Carly Svenvold PE
Date 8/4/2026
For Use by Owner's Representative or Owner:
X _Approved S ned by: Approved as Noted
i
Not Approv�j� Approved Too Late
Signed By
Date 8/5/202 FEED0881654E4C7
END OF SECTION
Bozeman Public Library Children's Room and Teen Corner Remodel 01 60 10.01
Bozeman, MT 59715 SUBSTITUTION REQUEST FORM
MSR Design#2025021BCR Page 2 of 2
SECTION 0160 10.01
SUBSTITUTION REQUEST FORM
We hereby submit for your consideration the following product instead of the specified item for the
following project: Bozeman Public Library
PROJECT TITLE Chi ldran'G Room Remodel_ PROJECT NO. 2O?5021
DRAWING NO. DRAWING TITLE
SPEC. SECTION SPEC.TITLE PARAGRAPH SPECIFIED ITEM
23 33 00 Air Duct Accessories 2.08 Duct Mounted Access Doors
Proposed Substitution: Greenheck
Attach complete information on changes to Drawings and/or Specifications which proposed
substitution will require for its proper installation.
Submit, with request, all necessary samples and substantiating data to prove equal quality and
performance to that which is specified. Clearly mark manufacturer's literature to indicate equality in
performance.
Substitutions of the materials and equipment described in the Contract Documents will be considered
during the bidding period upon receipt of a written request to the Architect for approval up to ten
(10)days before receipt of bids. Verbal or written requests without the completed Substitution
Request Form will not be considered.
CERTIFICATION OF EQUAL PERFORMANCE AND ASSUMPTION OF LIABILITY FOR EQUAL PERFORMANCE
The undersigned states that the function, appearance, and quality are equivalent or superior to the
specified item.
Sub f"ttedby: Reel' firight
l
ignature
Sound Air LLC
Firm
422 9th Street S. Great Falls, MT 59405
Address
406-727-8483 keeliasoundairinc.com 8/4/26
Telephone Email Date '
Signature shall be by person having authority to legally bind his firm to the above terms. Failure to
provide legally binding signature will result in retraction of approval.
Fill in Blanks Below: /—
Does the substitution affect dimensions shown on Drawings? Yes l
If yes, clearly indicate changes:
Will the undersigned pay for changes to the build'n design, including engineering and detailing costs
caused by the requested substitution? Yes No
If no,fully explain:
What effect does substitution have on other Contracts or other trades?
None
What effect does substitution have on construction schedule?
None
Bozeman Public Library Children's Room and Teen Corner Remodel 01 60 10.01
Bozeman, MT 59715 SUBSTITUTION REQUEST FORM
MSR Design#2025021BCR Page 1 of 2
Manufacturer's warranties of the proposed and specified items are
XX Same _^Different(Explain on Attachment)
Reason for Request:
_Mauer ufact are not listed in specs
Itemized comparison of specified item(s)with the proposed substitution.
List significant variations:
None
Accurate cost data comparing proposed substitution with product specified:
- None
Designation of maintenance services and sources:
(ATTACH ADDITIONAL SHEETS IF REQUIRED)
For Use by Design Professional:
x Recommended Recommended as Noted
Not Recommended Received Too Late
Signed By Carly Svenvold PE
Date 8/4/2026 _
For Use by Owner's Representative or Owner:
X Approved Approved as Noted
Sign d by:
Not AflZvx
pro7 _ _Approved Too Late
Signed By n' aix
Date 8/5/202 FEEDOB81654E4C7
END OF SECTION
Bozeman Public Library Children's Room and Teen Corner Remodel 01 60 10.01
Bozeman, MT 59715 SUBSTITUTION REQUEST FORM
MSR Design #2025021BCR Page 2 of 2
SECTION 0160 10.01
SUBSTITUTION REQUEST FORM
We hereby submit for your consideration the following product instead of the specified item for the
following project: Bozeman Public Library
PROJECT TITLE Chi 1 dren's Room Remodel PROJECT NO. 20?5021
DRAWING NO. DRAWING TITLE
SPEC. SECTION SPEC.TITLE PARAGRAPH SPECIFIED ITEM
?'� M Air lliir-t Ac-r-PssnrJPR 2_04 Manual Vnlu e dampers
Proposed Substitution:(,rppnhpr k,
Attach complete information on changes to Drawings and/or Specifications which proposed
substitution will require for its proper installation.
Submit,with request, all necessary samples and substantiating data to prove equal quality and
performance to that which is specified. Clearly mark manufacturer's literature to indicate equality in
performance.
Substitutions of the materials and equipment described in the Contract Documents will be considered
during the bidding period upon receipt of a written request to the Architect for approval up to ten
(10)days before receipt of bids. Verbal or written requests without the completed Substitution
Request Form will not be considered.
CERTIFICATION OF EQUAL PERFORMANCE AND ASSUMPTION OF LIABILITY FOR EQUAL PERFORMANCE
The undersigned states that the function, appearance, and quality are equivalent or superior to the
specified item.
Sub ftted;by: Keel',Wright
.ignature
Sound Air LLC
Firm
422 9th Street S. Great Falls, MT 59405
Address
406-727-8483 keeliCsoundairinc.com 8/4/26
Telephone Email Date
Signature shall be by person having authority to legally bind his firm to the above terms. Failure to
provide legally binding signature will result in retraction of approval.
Fill in Blanks Below:
Does the substitution affect dimensions shown on Drawings? Yes
If yes, clearly indicate changes:
Will the undersigned pay for changes to the build'n design, including engineering and detailing costs
caused by the requested substitution? Yes No
If no,fully explain:
What effect does substitution have on other Contracts or other trades?
None
What effect does substitution have on construction schedule?
None
Bozeman Public Library Children's Room and Teen Corner Remodel 01 60 10.01
Bozeman, MT 59715 SUBSTITUTION REQUEST FORM
MSR Design 4,12025021BCR Page 1 of 2
Manufacturer's warranties of the proposed and specified items are:
Same - Different(Explain on Attachment)
Reason for Request:
_Mankif actLirP not 1 i in specs
Itemized comparison of specified item(s)with the proposed substitution.
List significant variations:
None
Accurate cost data comparing proposed substitution with product specified:
--None_ - -- - - -
Designation of maintenance services and sources:
(ATTACH ADDITIONAL SHEETS IF REQUIRED)
For Use by Design Professional:
x Recommended Recommended as Noted
Not Recommended Received Too Late
Signed By Carly Svenvold,PE
Date 8/4/2026 _
For Use by Owner's Representative or Owner:
X Approved -Approved as Noted
Not Appi ovAgnedbj' Approved Too Late
Signed By SLAIA,t, MAX _
Date 8/5/ 0026 FEED0881654E4U
END OF SECTION
Bozeman Public library Children's Room and Teen Corner Remodel 01 60 10.01
Bozeman, MT S971S SUBSTITUTION REQUEST FORM
MSR Design#2025021BCR Page 2 of 2
SECTION 0160 10.01
SUBSTITUTION REQUEST FORM
We hereby submit for your consideration the following product instead of the specified item for the
following project: Bozeman Public Library
PROJECT TITLE_Chi I rJrPns Rnnm RPmod?L PROJECT NO. 2>725021
DRAWING NO. DRAWING TITLE
SPEC.SECTION SPEC.TITLE PARAGRAPH SPECIFIED ITEM
23 33 00 Air duct accessories 2.03 Backdraft & Pressure Relief Dampers
Proposed Substitution: Greenheck
Attach complete information on changes to Drawings and/or Specifications which proposed
substitution will require for its proper installation.
Submit,with request, all necessary samples and substantiating data to prove equal quality and
performance to that which is specified. Clearly mark manufacturer's literature to indicate equality in
performance.
Substitutions of the materials and equipment described in the Contract Documents will be considered
during the bidding period upon receipt of a written request to the Architect for approval up to ten
(10)days before receipt of bids. Verbal or written requests without the completed Substitution
Request Form will not be considered.
CERTIFICATION OF EQUAL PERFORMANCE AND ASSUMPTION OF LIABILITY FOR EQUAL PERFORMANCE
The undersigned states that the function, appearance, and quality are equivalent or superior to the
specified item.
Sub fitted by: KeelV Wright
ign lure
Sound Air LLC
Firm
422 9th Street S. Great Falls, MT 59405
Address
406-727-8483 keeliCsoundairinc.com 8/4/26
Telephone Email Date
Signature shall be by person having authority to legally bind his firm to the above terms. Failure to
provide legally binding signature will result in retraction of approval.
Fill in Blanks Below:
Does the substitution affect dimensions shown on Drawings? Yes
If yes, clearly indicate changes:
Will the undersigned pay for changes to the build'n design, including engineering and detailing costs
caused by the requested substitution? Yes No
If no,fully explain:
What effect does substitution have on other Contracts or other trades?
None
What effect does substitution have on construction schedule?
None
Bozeman Public Library Children's Room and Teen Corner Remodel 01 60 10.01
Bozeman, MT 59715 SUBSTITUTION REQUEST FORM
MSR Design #202.5021BCR Page 1 of 2
Manufacturer's warranties of the proposed and specified items are:
XX Same Different(Explain on Attachment)
Reason for Request:
Manufacture not listed in Specs
Itemized comparison of specified item(s)with the proposed substitution.
List significant variations:
None
Accurate cost data comparing proposed substitution with product specified:
Designation of maintenance services and sources:
(ATTACH ADDITIONAL SHEETS IF REQUIRED)
For Use by Design Professional:
x Recommended Recommended as Noted
Not Recommended Received Too Late
Signed By Carly Svenvold. PE
Date 8/4/2026
For Use by Owner's Representative or Owner:
x Approved Approved as Noted
Not Appro d sr°nea by'. _Approved Too Late
Signed By ��A Atay
Date 8/5/2026 FEED0081654E4C7_.
END OF SECTION
Bozeman Public Library Children's Room and Teen Corner Remodel 01 6010.01
Bozeman, MT 59715 SUBSTITUTION REQUEST FORM
MSR Design 42025021BCR Page 2 of 2