Loading...
HomeMy WebLinkAbout2026-08-05_Greenheck Substitution_MM26.08.05_BZN26.08.06 SECTION 0160 10.01 SUBSTITUTION REQUEST FORM We hereby submit for your consideration the following product instead of the specified item for the following project: Bozeman Public Library PROJECTTITLE .hi 1 drPn',q Ranm Remoc3_el_ PROJECT NO. 2025021 DRAWING NO. DRAWING TITLE SPEC. SECTION SPEC.TITLE PARAGRAPH SPECIFIED ITEM 23 37 13 Grilles. Registers and D'ffu ers 2.01 Proposed Substitution: MetalAIre (Greenheck_Z_ Attach complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Submit,with request, all necessary samples and substantiating data to prove equal quality and performance to that which is specified. Clearly mark manufacturer's literature to indicate equality in performance. Substitutions of the materials and equipment described in the Contract Documents will be considered during the bidding period upon receipt of a written request to the Architect for approval up to ten (10)days before receipt of bids. Verbal or written requests without the completed Substitution Request Form will not be considered. CERTIFICATION OF EQUAL PERFORMANCE AND ASSUMPTION OF LIABILITY FOR EQUAL PERFORMANCE The undersigned states that the function, appearance, and quality are equivalent or superior to the specified item. sub fLted;by: Keel' JtVright Ignature Sound Air LLC Firm 422 9th Street S. Great Falls, MT 59405 Address 406-727-8483 keeli@soundairine.com 8/4/26 Telephone Email Date Signature shall be by person having authority to legally bind his firm to the above terms. Failure to provide legally binding signature will result in retraction of approval. Fill in Blanks Below: Does the substitution affect dimensions shown on Drawings? Yes If yes, clearly indicate changes: Will the undersigned pay for changes to the buildinR design, including engineering and detailing costs caused by the requested substitution? Yes No If no, fully explain: What effect does substitution have on other Contracts or other trades? None What effect does substitution have on construction schedule? None Bozeman Public Library Children's Room and Teen Corner Remodel 01 60 10.01 Bozeman, MT 59715 SUBSTII UTION REQUEST FORM MSR Design 412025021BCR Page 1 of 2 Manufacturer's warranties of the proposed and specified items are: XX Same Different (Explain on Attachment) Reason for Request: _MAnuf-acture no 1's ed in specs _ Itemized comparison of specified item(s)with the proposed substitution. List significant variations: None Accurate cost data comparing proposed substitution with product specified: --None -- - --- Designation of maintenance services and sources: (ATTACH ADDITIONAL SHEETS IF REQUIRED) For Use by Design Professional. x Recommended Recommended as Noted Not Recommended Received Too Late Signed By Carly Svenvold PE Date 8/4/2026 For Use by Owner's Representative or Owner: X - Approved Approved as Noted ---- - Signed by: No A roved ��� '" Approved Too Late Signed By � A .U�t,Y _ Date FEED0681654E4C7 8/5/2026 END OF SECTION Bozeman Public Library Children's Room and Teen Corner Remodel 01 60 10.01 Bozeman, MT 5971S SUBSTITUTION REQUEST FORM MSR Design 42025021BCR Page 2 of 2 SECTION 0160 10.01 SUBSTITUTION REQUEST FORM We hereby submit for your consideration the following product instead of the specified item for the following project: Bozeman Public Library PROJECTTITLE ChildrPn's Room RPmodPl PROJECT NO. ?n?512i DRAWING NO. DRAWING TITLE SPEC.SECTION SPEC.TITLE PARAGRAPH SPECIFIED ITEM 23 33 00 Air Duct Accessor=e!s 2.05 Control Dampers Proposed Substitution: Greenheck Attach complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Submit,with request, all necessary samples and substantiating data to prove equal quality and performance to that which is specified. Clearly mark manufacturer's literature to indicate equality in performance. Substitutions of the materials and equipment described in the Contract Documents will be considered during the bidding period upon receipt of a written request to the Architect for approval up to ten (10)days before receipt of bids. Verbal or written requests without the completed Substitution Request Form will not be considered. CERTIFICATION OF EQUAL PERFORMANCE AND ASSUMPTION OF LIABILITY FOR EQUAL PERFORMANCE The undersigned states that the function, appearance,and quality are equivalent or superior to the specified item. Sub itted,.by: Keel' yir.ight �N / lgn ttu' rep — v Sound Air LLC Firm 422 9th Street S. Great Falls, MT 59405 Address 406-727-8483 keeliLsoundairinc.com 8/4/26 Telephone Email Date Signature shall be by person having authority to legally bind his firm to the above terms. Failure to provide legally binding signature will result in retraction of approval. Fill in Blanks Below: Does the substitution affect dimensions shown on Drawings? Yes If yes, clearly indicate changes: Will the undersigned pay for changes to the build' . design, including engineering and detailing costs caused by the requested substitution? Yes No If no,fully explain: What effect does substitution have on other Contracts or other trades? None What effect does substitution have on construction schedule? None Bozeman Public Library Children's Room and Teen Corner Remodel 0160 10.01 Bozeman, MT 59715 SUBSTITUTION REQUEST FORM MSR Design 42025021BCR Page 1 of 2 Manufacturer's warranties of the proposed and specified items are: XX Same Different(Explain on Attachment) Reason for Request: Manufa tire not ! Ct_.Pr1 in Specs Itemized comparison of specified item(s)with the proposed substitution. List significant variations: None Accurate cost data comparing proposed substitution with product specified: Designation of maintenance services and sources: (ATTACH ADDITIONAL SHEETS IF REQUIRED) For Use by Design Professional: _ X Recommended Recommended as Noted Not Recommended Received Too Late Signed By Carly Svenvold PE Date 8/4/2026 For Use by Owner's Representative or Owner: X _Approved S ned by: Approved as Noted i Not Approv�j� Approved Too Late Signed By Date 8/5/202 FEED0881654E4C7 END OF SECTION Bozeman Public Library Children's Room and Teen Corner Remodel 01 60 10.01 Bozeman, MT 59715 SUBSTITUTION REQUEST FORM MSR Design#2025021BCR Page 2 of 2 SECTION 0160 10.01 SUBSTITUTION REQUEST FORM We hereby submit for your consideration the following product instead of the specified item for the following project: Bozeman Public Library PROJECT TITLE Chi ldran'G Room Remodel_ PROJECT NO. 2O?5021 DRAWING NO. DRAWING TITLE SPEC. SECTION SPEC.TITLE PARAGRAPH SPECIFIED ITEM 23 33 00 Air Duct Accessories 2.08 Duct Mounted Access Doors Proposed Substitution: Greenheck Attach complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Submit, with request, all necessary samples and substantiating data to prove equal quality and performance to that which is specified. Clearly mark manufacturer's literature to indicate equality in performance. Substitutions of the materials and equipment described in the Contract Documents will be considered during the bidding period upon receipt of a written request to the Architect for approval up to ten (10)days before receipt of bids. Verbal or written requests without the completed Substitution Request Form will not be considered. CERTIFICATION OF EQUAL PERFORMANCE AND ASSUMPTION OF LIABILITY FOR EQUAL PERFORMANCE The undersigned states that the function, appearance, and quality are equivalent or superior to the specified item. Sub f"ttedby: Reel' firight l ignature Sound Air LLC Firm 422 9th Street S. Great Falls, MT 59405 Address 406-727-8483 keeliasoundairinc.com 8/4/26 Telephone Email Date ' Signature shall be by person having authority to legally bind his firm to the above terms. Failure to provide legally binding signature will result in retraction of approval. Fill in Blanks Below: /— Does the substitution affect dimensions shown on Drawings? Yes l If yes, clearly indicate changes: Will the undersigned pay for changes to the build'n design, including engineering and detailing costs caused by the requested substitution? Yes No If no,fully explain: What effect does substitution have on other Contracts or other trades? None What effect does substitution have on construction schedule? None Bozeman Public Library Children's Room and Teen Corner Remodel 01 60 10.01 Bozeman, MT 59715 SUBSTITUTION REQUEST FORM MSR Design#2025021BCR Page 1 of 2 Manufacturer's warranties of the proposed and specified items are XX Same _^Different(Explain on Attachment) Reason for Request: _Mauer ufact are not listed in specs Itemized comparison of specified item(s)with the proposed substitution. List significant variations: None Accurate cost data comparing proposed substitution with product specified: - None Designation of maintenance services and sources: (ATTACH ADDITIONAL SHEETS IF REQUIRED) For Use by Design Professional: x Recommended Recommended as Noted Not Recommended Received Too Late Signed By Carly Svenvold PE Date 8/4/2026 _ For Use by Owner's Representative or Owner: X Approved Approved as Noted Sign d by: Not AflZvx pro7 _ _Approved Too Late Signed By n' aix Date 8/5/202 FEEDOB81654E4C7 END OF SECTION Bozeman Public Library Children's Room and Teen Corner Remodel 01 60 10.01 Bozeman, MT 59715 SUBSTITUTION REQUEST FORM MSR Design #2025021BCR Page 2 of 2 SECTION 0160 10.01 SUBSTITUTION REQUEST FORM We hereby submit for your consideration the following product instead of the specified item for the following project: Bozeman Public Library PROJECT TITLE Chi 1 dren's Room Remodel PROJECT NO. 20?5021 DRAWING NO. DRAWING TITLE SPEC. SECTION SPEC.TITLE PARAGRAPH SPECIFIED ITEM ?'� M Air lliir-t Ac-r-PssnrJPR 2_04 Manual Vnlu e dampers Proposed Substitution:(,rppnhpr k, Attach complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Submit,with request, all necessary samples and substantiating data to prove equal quality and performance to that which is specified. Clearly mark manufacturer's literature to indicate equality in performance. Substitutions of the materials and equipment described in the Contract Documents will be considered during the bidding period upon receipt of a written request to the Architect for approval up to ten (10)days before receipt of bids. Verbal or written requests without the completed Substitution Request Form will not be considered. CERTIFICATION OF EQUAL PERFORMANCE AND ASSUMPTION OF LIABILITY FOR EQUAL PERFORMANCE The undersigned states that the function, appearance, and quality are equivalent or superior to the specified item. Sub ftted;by: Keel',Wright .ignature Sound Air LLC Firm 422 9th Street S. Great Falls, MT 59405 Address 406-727-8483 keeliCsoundairinc.com 8/4/26 Telephone Email Date Signature shall be by person having authority to legally bind his firm to the above terms. Failure to provide legally binding signature will result in retraction of approval. Fill in Blanks Below: Does the substitution affect dimensions shown on Drawings? Yes If yes, clearly indicate changes: Will the undersigned pay for changes to the build'n design, including engineering and detailing costs caused by the requested substitution? Yes No If no,fully explain: What effect does substitution have on other Contracts or other trades? None What effect does substitution have on construction schedule? None Bozeman Public Library Children's Room and Teen Corner Remodel 01 60 10.01 Bozeman, MT 59715 SUBSTITUTION REQUEST FORM MSR Design 4,12025021BCR Page 1 of 2 Manufacturer's warranties of the proposed and specified items are: Same - Different(Explain on Attachment) Reason for Request: _Mankif actLirP not 1 i in specs Itemized comparison of specified item(s)with the proposed substitution. List significant variations: None Accurate cost data comparing proposed substitution with product specified: --None_ - -- - - - Designation of maintenance services and sources: (ATTACH ADDITIONAL SHEETS IF REQUIRED) For Use by Design Professional: x Recommended Recommended as Noted Not Recommended Received Too Late Signed By Carly Svenvold,PE Date 8/4/2026 _ For Use by Owner's Representative or Owner: X Approved -Approved as Noted Not Appi ovAgnedbj' Approved Too Late Signed By SLAIA,t, MAX _ Date 8/5/ 0026 FEED0881654E4U END OF SECTION Bozeman Public library Children's Room and Teen Corner Remodel 01 60 10.01 Bozeman, MT S971S SUBSTITUTION REQUEST FORM MSR Design#2025021BCR Page 2 of 2 SECTION 0160 10.01 SUBSTITUTION REQUEST FORM We hereby submit for your consideration the following product instead of the specified item for the following project: Bozeman Public Library PROJECT TITLE_Chi I rJrPns Rnnm RPmod?L PROJECT NO. 2>725021 DRAWING NO. DRAWING TITLE SPEC.SECTION SPEC.TITLE PARAGRAPH SPECIFIED ITEM 23 33 00 Air duct accessories 2.03 Backdraft & Pressure Relief Dampers Proposed Substitution: Greenheck Attach complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Submit,with request, all necessary samples and substantiating data to prove equal quality and performance to that which is specified. Clearly mark manufacturer's literature to indicate equality in performance. Substitutions of the materials and equipment described in the Contract Documents will be considered during the bidding period upon receipt of a written request to the Architect for approval up to ten (10)days before receipt of bids. Verbal or written requests without the completed Substitution Request Form will not be considered. CERTIFICATION OF EQUAL PERFORMANCE AND ASSUMPTION OF LIABILITY FOR EQUAL PERFORMANCE The undersigned states that the function, appearance, and quality are equivalent or superior to the specified item. Sub fitted by: KeelV Wright ign lure Sound Air LLC Firm 422 9th Street S. Great Falls, MT 59405 Address 406-727-8483 keeliCsoundairinc.com 8/4/26 Telephone Email Date Signature shall be by person having authority to legally bind his firm to the above terms. Failure to provide legally binding signature will result in retraction of approval. Fill in Blanks Below: Does the substitution affect dimensions shown on Drawings? Yes If yes, clearly indicate changes: Will the undersigned pay for changes to the build'n design, including engineering and detailing costs caused by the requested substitution? Yes No If no,fully explain: What effect does substitution have on other Contracts or other trades? None What effect does substitution have on construction schedule? None Bozeman Public Library Children's Room and Teen Corner Remodel 01 60 10.01 Bozeman, MT 59715 SUBSTITUTION REQUEST FORM MSR Design #202.5021BCR Page 1 of 2 Manufacturer's warranties of the proposed and specified items are: XX Same Different(Explain on Attachment) Reason for Request: Manufacture not listed in Specs Itemized comparison of specified item(s)with the proposed substitution. List significant variations: None Accurate cost data comparing proposed substitution with product specified: Designation of maintenance services and sources: (ATTACH ADDITIONAL SHEETS IF REQUIRED) For Use by Design Professional: x Recommended Recommended as Noted Not Recommended Received Too Late Signed By Carly Svenvold. PE Date 8/4/2026 For Use by Owner's Representative or Owner: x Approved Approved as Noted Not Appro d sr°nea by'. _Approved Too Late Signed By ��A Atay Date 8/5/2026 FEED0081654E4C7_. END OF SECTION Bozeman Public Library Children's Room and Teen Corner Remodel 01 6010.01 Bozeman, MT 59715 SUBSTITUTION REQUEST FORM MSR Design 42025021BCR Page 2 of 2