Loading...
HomeMy WebLinkAbout037 - L2.00 Irrigation PlanΔSS SS SS SS SS SS SS SS SS SS SS T T T T T T T TTTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTE E EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEETTTTTTTTTE E E W W W W GGGGGGGGGGGGGGSDSD WWWSSSSSSWWW4650465546554655 4655 465546554655 /////////////////////////////////////////////////////////////////////////////////////////////////////////4650465546554655 4655 465546554655 SS SS SS SS SS SS SS SS SS SS SS T T T T T T T TTTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTE E EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEETTTTTTTTTE E E W W W W GGGGGGGGGGGGGGSDSD WWWSSSSSSWWWWWWWWWW//////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////ΔGASMBFC2"534.22"623.02"732.52"833.72"930.72"1030.12"IRRIGATION CONTROLLERFINAL LOCATIONSELECTED BY OWNERIRRIGATION POINT OFCONNECTION323.62"114.12"215.02"420.42"Solar SyncSoil ClickCONNECTION POINT FORWINTERIZATION113.2112"1322.31"1420.61"151.26112"1213.62"MXX1"1"34"1"1"114"1"114"114"114"114"34"112"112"112"34"112"114"112"34"114"114"1"34"DATE:NUMBER:PROJECT:DISCOUNT TIRE - BOZEMANMay 14, 2026LLA0644.25TITLE:DESIGN:MJLDRAWN:ZACHECKED:MJLSHEET:SCALE:DISCOUNT TIRE 5889 E VALLEY CENTER ROAD BOZEMAN, MT PROJECT ADDRESS:2111 South C Street, Tacoma, WA 98402 253-209-4053 | Moghan@LyonLA.comREVISIONS:REV 1:REV 2:REV 3:Know what'sbelow.before you dig.CallRDRAWING SET:MOGHAN LYONLICENSED LANDSCAPE A R C HITE C T ST A T E OF MONTANACONCEPTUALREVIEW SET(CONR)L2.00IRRIGATIONPLANGraphic Scale: 1" = 20'-0"1" = 20'-0"010'20'40'80'NOTE:Prior to commencing any work, the applicant must contact the Water Conservation Division to schedule apre-installation meeting. The pre-installation meeting will address the following:1)The approved landscape and irrigation plan and requirements of this Manual;2)Timing of required inspections including the final inspection to obtain a certificate of completion;3)Soil amendment requirements and the process for approval of installed soil, including the partyresponsible for soils inspection;4)Discussion of the day and hours for irrigation scheduling after installation;5)The process required for making changes to the approved landscape and irrigation plan; and6)Installation of landscaping and irrigation according to the approved landscaping and irrigation plan andrequirements of this Manual, which is required to receive a final certificate of occupancy or releasing asecurity as provided by an improvement’s agreement. The pre-installation meeting must include allcontractors responsible for the installation of the landscape and irrigation systems.