Loading...
HomeMy WebLinkAbout033 - L1.00 Landscape PlanΔSS SS SS SS SS SS SS SS SS SS T T T T T T T TTTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTE E EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEETTTTTTTTTE E E W W W W GGGGGGGGGGGGGGSDSD WWWSSSSSSWWWWWWWWWW/////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////ΔGAS3' MULCH RINGS4" DEPTHFRONTAGE TRAILBY OTHERLAWN AREABOUNDARYOPEN SPACECONNECT TOEXISTING TRAIL5' WIDE TRASHENCLOSURE BUFFERSHRUB AREABOUNDARYZONING: B-2 COMMUNITY BUSINESS DISTRICT. "AUTOMOBILE REPAIR"TOTAL PARCEL SITE AREA = 109,019 SFBUILT OR HARDSCAPED AREA= 63,355 SFREQUIRED LANDSCAPE COVERAGE (.6 x 63,355 SF)= 36,887 SFTOTAL LANDSCAPED AREA= 45,664 SF TOTAL LAWN AREA= 14,386 SFSHRUB AREA = 31,278 SFONE TREE REQUIRED PER 1,600 SF OF LANDSCAPED AREATREES REQUIRED (36,887/1,600)= 23TREES PROPOSED = 23 (MEETS REQUIREMENT)ONE LARGE CANOPY TREE PER 50 LINEAR FEET OFTOTAL STREET FRONTAGE(313 LF)LARGE CANOPY TREES PROPOSED= 6(MEETS REQUIREMENT)REQUIRED PARKING LOT LANDSCAPE20 SF LANDSCAPE / 1 PARKING SPACE20 SF x 51 PARKING SPACES= 1,020 SFPROPOSED PARKING LOT LANDSCAPE = 2,400 SF(EXCEEDS REQUIREMENT)DATE:NUMBER:PROJECT:DISCOUNT TIRE - BOZEMANMay 14, 2026LLA0644.25TITLE:DESIGN:MJLDRAWN:ZACHECKED:MJLSHEET:SCALE:DISCOUNT TIRE 5889 E VALLEY CENTER ROAD BOZEMAN, MT PROJECT ADDRESS:2111 South C Street, Tacoma, WA 98402 253-209-4053 | Moghan@LyonLA.comREVISIONS:REV 1:REV 2:REV 3:Know what'sbelow.before you dig.CallRDRAWING SET:MOGHAN LYONLICENSED LANDSCAPE A R C HITE C T ST A T E OF MONTANACONCEPTUALREVIEW SET(CONR)L1.00LANDSCAPEPLANGraphic Scale: 1" = 20'-0"1" = 20'-0"010'20'40'80'NOTE:Prior to commencing any work, the applicant must contact the Water Conservation Division to schedule apre-installation meeting. The pre-installation meeting will address the following:1)The approved landscape and irrigation plan and requirements of this Manual;2)Timing of required inspections including the final inspection to obtain a certificate of completion;3)Soil amendment requirements and the process for approval of installed soil, including the partyresponsible for soils inspection;4)Discussion of the day and hours for irrigation scheduling after installation;5)The process required for making changes to the approved landscape and irrigation plan; and6)Installation of landscaping and irrigation according to the approved landscaping and irrigation plan andrequirements of this Manual, which is required to receive a final certificate of occupancy or releasing asecurity as provided by an improvement’s agreement. The pre-installation meeting must include allcontractors responsible for the installation of the landscape and irrigation systems.