MEMORANDUM
DATE: November 14, 2025
TO: Taylor Lonsdale, P.E.
City of Bozeman
FROM: Chris Forster, P.E.
TENW
SUBJECT: Discount Tire – Bozeman, MT (Application #25528)
Traffic Impact Study (TIS)
TENW Project No. 2025-311
This memorandum summarizes a traffic impact study (TIS) prepared for the proposed Discount Tire project
in Bozeman, MT. The scope of the TIS was determined by the City and was confirmed by Montana
Department of Transportation (MDT) staff. This memo includes a project description, trip generation
estimates, trip distribution, intersection level of service and site access analysis, and signal warrant
analysis.
Project Description
The proposed Discount Tire project includes the development of a 7,320 square foot (SF) tire store located
on a vacant site just north of 5997 E. Valley Center Road in Bozeman, MT. A project site vicinity map is
shown in Figure 1.
Primary vehicular access to the site is proposed via an existing shared access driveway onto E Valley
Center Road that is aligned with Honor Lane. The driveway is shared with an adjacent hotel. There is a
secondary vehicular connection to the south to another site that includes a hotel and restaurant. A
preliminary site plan is included in Attachment A. The proposed Discount Tire project is anticipated to be
completed by 2027.
Project Trip Generation
Trip generation estimates for the proposed Discount Tire project were based on methodology
documented in the Institute of Transportation Engineers (ITE) Trip Generation Manual, 12th Edition for Land
Use Code (LUC) 848 (Tire Store).
The net new trip generation estimates account for pass-by trip reductions for the proposed tire store use.
Pass-by trips are made by vehicles that are already on the adjacent streets and make intermediate stops
at the proposed use on route to a primary destination (i.e. on the way from work to home). The pass-by
trip reductions were also based on the latest ITE data.
The resulting new trip generation associated with the proposed Discount Tire project is summarized in
Table 1. Detailed trip generation calculations are included in Appendix B.
11/14/25
Traffic Impact Study (TIS)
Discount Tire (Bozeman, MT)
November 14, 2025
Page 2
Table 1
Trip Generation Summary
Weekday Time Period
New Trips Generated
In Out Total
Daily 79 78 157
AM Peak Hour 10 5 15
PM Peak Hour 9 12 21
Trip Distribution
The anticipated distribution of Discount Tire peak hour project trips was estimated based on existing traffic
counts conducted at the intersection of E. Valley Center Road / Honor Lane. Table 2 summarizes the
resulting general trip distribution patterns. The weekday AM and PM peak hour project trip distribution
and assignment are illustrated in Figure 4.
Table 2
Peak Hour Project Trip Distribution
Route (Direction) Trip Distribution
E Valley Center Rd (North) 45%
E Valley Center Rd (South) 50%
Honor Ln (West) 5%
TOTAL 100%
Traffic Volumes
Existing weekday AM and PM peak hour traffic volumes at the E Valley Center Road / Honor Lane study
intersection were based on counts collected by All Traffic Data (ATD) in October 2025. The AM peak hour
traffic volumes represent the highest hour of traffic between 7:00 and 9:00 a.m. The PM peak hour traffic
volumes represent the highest hour of traffic between 4:00 and 6:00 p.m. Figure 2 illustrates the existing
2025 weekday AM and PM peak hour traffic volumes at the E Valley Center Road / Honor Lane intersection
and average daily traffic (ADT) on the streets in the project vicinity. ADTs were estimated using a K-factor
of 0.10. The existing traffic count sheets are included in Attachment C.
To estimate the future year 2027 No Action (Without Project) weekday AM and PM peak hour traffic
volumes, an annual background growth rate was applied in addition to traffic from several pipeline
development projects. For the background growth rate, recent historical counts on E. Valley Center Road
indicate an average annual growth of less than 0.4 percent per year; therefore a 1 percent annual
background growth rate was applied to the existing traffic volumes which should be considered
conservative. Based on coordination with City staff, trips from the following pipeline development projects
were also included in our traffic forecasts:
• Townplace Suites Ph1 (East Hotel)
• Vance Thompson Vision
• DQ Catron Crossing
• Hyatt House
Traffic Impact Study (TIS)
Discount Tire (Bozeman, MT)
November 14, 2025
Page 3
The resulting future year 2027 No Action weekday AM and PM peak hour traffic volumes at the E Valley
Center Road / Honor Lane intersection are shown in Figure 3.
The future 2027 With Project traffic volumes at the E Valley Center Road / Honor Lane intersection were
determined by adding the project-generated trips (shown in Figure 4 to the No Action 2025 traffic volumes
(shown in Figure 3). The 2027 With Project volumes are shown in Figures 5.
Intersection Levels of Service
Existing LOS
An existing weekday AM and PM peak hour level of service (LOS) analysis was conducted at the study
intersection. Intersection LOS was calculated using the methodology and procedures outlined in the
Highway Capacity Manual (HCM 7th Edition) using the Synchro 12 software program. The 2025 existing
weekday AM and PM peak hour LOS analysis results for the study intersections are summarized in Table
3. The LOS methodology and calculations are included in Appendix D.
Table 3
Existing 2025 Weekday Peak Hour LOS Summary
Study Intersection
LOS
Standard2 LOS
Delay
(sec)
Worst
Approach
AM Peak Hour
Two-Way Stop-Controlled Intersection1:
1. E Valley Center Road / Honor Lane C B 11.6 WB
PM Peak Hour
Two-Way Stop-Controlled Intersection1:
1. E Valley Center Road / Honor Lane C A 9.9 WB
1. LOS reported at the stop-controlled study intersection is based on the control delay of the approach with the highest delay.
2. City of Bozeman Municipal Code Section 38.400.060 – Street Improvement Standards, 2024. The LOS standard is applied to “the
intersection as a whole”. Therefore applying the LOS standard to the worst approach at a two-way stop controlled intersection is
conservative.
As shown in Table 3, the study intersection currently operates at LOS B or better during the weekday AM
and PM peak hours, meeting City of Bozeman LOS standards.
Traffic Impact Study (TIS)
Discount Tire (Bozeman, MT)
November 14, 2025
Page 4
INSERT FIGURE 1
Traffic Impact Study (TIS)
Discount Tire (Bozeman, MT)
November 14, 2025
Page 5
INSERT FIGURE 2
Traffic Impact Study (TIS)
Discount Tire (Bozeman, MT)
November 14, 2025
Page 6
INSERT FIGURE 3
Traffic Impact Study (TIS)
Discount Tire (Bozeman, MT)
November 14, 2025
Page 7
INSERT FIGURE 4
Traffic Impact Study (TIS)
Discount Tire (Bozeman, MT)
November 14, 2025
Page 8
Traffic Impact Study (TIS)
Discount Tire (Bozeman, MT)
November 14, 2025
Page 9
Future LOS
Weekday AM and PM peak hour level of service (LOS) analyses were conducted for future (2027)
conditions at the study intersection. The LOS results at the study intersections without and with the
proposed project are summarized in Table 4.
Table 4
Future 2027 Weekday Peak Hour LOS Summary
Study Intersection
2027 No Action 2027 With Project
LOS
Standard2 LOS
Delay
(sec)
Worst
Approach LOS
Delay
(sec)
Worst
Approach
AM Peak Hour
Two-Way Stop-Controlled Intersection1:
1. E Valley Center Road / Honor Lane C B 14.7 WB B 14.8 WB
PM Peak Hour
Two-Way Stop-Controlled Intersection1:
1. E Valley Center Road / Honor Lane C B 11.1 EB B 11.7 WB
1. LOS reported at the stop-controlled study intersection is based on the control delay of the approach with the highest delay.
2. City of Bozeman Municipal Code Section 38.400.060 – Street Improvement Standards, 2024. The LOS standard is applied to “the intersection
as a whole”. Therefore applying the LOS standard to the worst approach at a two-way stop controlled intersection is conservative.
As shown in Table 4, the study intersection is anticipated to operate at LOS B during the weekday AM and
PM peak hours in 2027 with or without the project, meeting City of Bozeman LOS standards.
Site Access Operations
Vehicular access to the site is proposed via an existing shared access driveway that serves as the east leg
of the intersection of E. Valley Center Road / Honor Lane. It should be noted that all trips were assigned
to this location with no project trips using the secondary vehicular connection through the property to the
south. This should result in a conservative analysis at the study intersection/site access location.
To assess operations at the site access, LOS and queuing analyses were conducted during the weekday
AM and PM peak hour for future year 2027 conditions with the proposed Discount Tire project. The
reported queues for the individual movements at the proposed site access driveway are 95th-percentile
queues which are only exceeded 5 percent of the time. The 2027 weekday AM and PM peak hour traffic
volumes at the proposed site access driveway were shown previously in Figure 5.
The weekday AM and PM peak hour site access analyses for future year 2027 are summarized below in
Table 5. The LOS worksheets are included in Attachment D.
Traffic Impact Study (TIS)
Discount Tire (Bozeman, MT)
November 14, 2025
Page 10
Table 5
Future 2027 With Project
Weekday Peak Hour Site Access LOS and Queue Summary
Site Access / Movement LOS
Delay
(sec)
V/C
Ratio
95th %
Queue
(ft)
AM Peak Hour
E Valley Center Road / Shared Access Driveway
Westbound Approach (exiting) B 14.8 0.08 <25’
Southbound Left-Turn (entering) A 7.7 0.01 0’
PM Peak Hour
E Valley Center Road / Shared Access Driveway
Westbound Approach (exiting) B 11.7 0.06 <25’
Southbound Left-Turn (entering) A 7.7 0.01 0’
As shown in Table 5, the individual entering and exiting movements at the existing stop-controlled shared
access driveway on E Valley Center Road are anticipated to operate at acceptable levels (LOS B or better)
with minimal queuing during the weekday AM and PM peak hours in 2027 with the proposed project.
Traffic Signal Warrant Analysis
A traffic signal warrant analysis was conducted at the E Valley Center Road / Honor Lane intersection for
future With Project year 2027 conditions. Signal warrants were based on guidelines outlined in the US
Department of Transportation / Federal Highway Administration, Manual on Uniform Traffic Control Devices
(MUTCD), 2023 Edition. Of the eight signal warrants outlined in the MUTCD, Warrant 3 (Peak Hour) was
analyzed in the AM and PM peak hours.
The With Project AM and PM peak hour traffic volumes used in the signal warrant analysis were shown
previously in Figure 5.
The results of the With Project 2027 signal warrant analysis are summarized in Table 6. Detailed signal
warrant analysis worksheets are included in Attachment E.
Table 6
E Valley Center Road / Honor Lane Signal Warrant Analysis
Warrant Warrant Met?
Warrant 3 – Peak Hour (AM Peak Hour)
Condition A NO
Condition B NO
Warrant Met? NO
Warrant 3 – Peak Hour (PM Peak Hour)
Condition A NO
Condition B NO
Warrant Met? NO
As shown in Table 6, based on With Project 2027 traffic volumes, signal warrant 3 would not be met at the
E Valley Center Road / Honor Lane intersection in both the AM and PM peak hours. Although other MUTCD
warrants such as 8-hour Vehicular Volumes (Warrant 1) and 4-hour Vehicular Volumes (Warrant 2) could
Traffic Impact Study (TIS)
Discount Tire (Bozeman, MT)
November 14, 2025
Page 11
also be analyzed, because Warrant 3 was not met it is highly unlikely that any other applicable signal
warrants would be met. Therefore, we can reasonably conclude that the intersection does not meet signal
warrants in 2027 with the proposed project.
Mitigation
Based on the results of this traffic study, the existing transportation facilities are anticipated to
accommodate the additional traffic generated by the proposed project. No project-specific site access or
off-site transportation improvements were identified. The City will confirm the amount of Transportation
Impact Fees due prior to building permit issuance.
Please contact me at (206) 498-5897 or forster@tenw.com with any questions.
cc: Kristina Kilts, Montana Department of Transportation (MDT)
Bill Fortunato, PACLAND
Attachments
ATTACHMENT A
Preliminary Site Plan
T T T T T T T TTTTTTTTTTTTTTTTT TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTE E EEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEEETTTTTTTTTE E E GGGGGGGGGGGGGG/////////6814 Greenwood Ave. N.Seattle, WA 98103T (206) 522-9510WWW.PACLAND.COMKnow what'sbelow.before you dig.CallR08/25/2025
ATTACHMENT B
Trip Generation Calculations
ITELand UseSize/Units 1LUC 2InOutInOutTotalDAILYProposed Use:Tire Store7,320 GFA84828.5450%50%105104209Pass-By Trips325%-26-26-52New Daily Trips =7978157AM PEAK HOURProposed Use:Tire Store7,320 GFA8482.6964%36%13720Pass-By Trips325%-3-2-5New AM Peak Hour Trips =10515PM PEAK HOURProposed Use:Tire Store7,320 GFA8483.8543%57%121628Pass-By Trips325%-3-4-7New PM Peak Hour Trips =91221Notes:1 GFA = Gross Floor Area.2 Based on Institute of Transportation Engineers (ITE) Trip Generation Manual, 12th Edition, 2025.3 Passby percent based on Institute of Transportation Engineers, Trip Generation Manual, 12th Edition. Discount Tire (Bozeman, MT)Weekday Trip Generation SummaryDirectional DistributionTrips GeneratedTrip Rate or Equation 2
ATTACHMENT C
Existing Traffic Counts
All Traffic Data Services
1 EAST VALLEY CENTER RD & HONOR LN AM
Thursday, October 16, 2025
Peak Hour
07:45 AM - 08:45 AM
Peak 15-Minutes
07:45 AM - 08:00 AM
Traffic Counts - All Vehicles
U-Turn Left Thru Right RTOR U-Turn Left Thru Right RTOR U-Turn Left Thru Right RTOR U-Turn Left Thru Right RTOR
7:00 AM 0 2 0 7 0 0 1 0 0 0 0 5 28 1 0 0 0 38 1 0 83 440
7:15 AM 0 0 0 2 0 0 1 0 0 0 0 10 35 0 0 0 0 47 2 0 97 454
7:30 AM 0 0 0 5 0 0 2 0 0 0 0 3 36 0 0 0 0 56 3 0 105 462
7:45 AM 0 0 0 5 0 0 3 0 1 0 0 6 45 1 0 0 0 93 1 0 155 480
8:00 AM 0 0 0 4 0 0 2 0 1 0 0 3 34 0 0 0 1 52 0 0 97 432
8:15 AM 0 0 0 4 0 0 3 0 2 0 0 4 36 0 0 0 0 54 2 0 105 0
8:30 AM 0 0 0 4 0 0 4 0 0 0 0 3 40 0 0 0 0 72 0 0 123 0
8:45 AM 0 1 0 2 0 0 1 0 1 0 0 2 36 0 0 0 2 60 2 0 107 0
Peak Rolling Hour Flow Rates
U-Turn Left Thru Right RTOR U-Turn Left Thru Right RTOR U-Turn Left Thru Right RTOR U-Turn Left Thru Right RTOR Total
Articulated Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Lights 0 0 0 17 0 0 12 0 4 0 0 16 151 1 0 0 1 267 3 0 472
Mediums 0 0 0 0 0 0 0 0 0 0 0 0 4 0 0 0 0 4 0 0 8
Total 0 0 0 17 0 0 12 0 4 0 0 16 155 1 0 0 1 271 3 0 480
Bicycles on Road 0 0 0 1 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 0 3
Bicycles on Crosswalk 2
Heavy Vehicle Percentage 1.7%
Heavy Vehicle Percentage 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 2.6% 0.0% 0.0% 0.0% 0.0% 1.5% 0.0% 0.0% 1.7%
Peak Hour Factor (PHF) 0.77
Peak Hour Factor (PHF) 0.00 0.25 0.00 0.68 0.00 0.00 0.75 0.00 0.50 0.00 0.00 0.60 0.86 0.50 0.00 0.00 0.38 0.73 0.58 0.00 0.77
Bicycles on Crosswalk
CCW CW Total CCW CW Total CCW CW Total CCW CW Total
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 1 1 0 0 0 0 0 0 0 0 0
8:15 AM 1 0 1 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0
Pedestrians
CCW CW Total CCW CW Total CCW CW Total CCW CW Total
7:00 AM 0 0 0 0 0 0 0 0 0 0 0 0
7:15 AM 0 0 0 0 0 0 0 0 0 0 0 0
7:30 AM 0 0 0 0 0 0 0 0 0 0 0 0
7:45 AM 0 0 0 0 0 0 0 0 0 0 0 0
8:00 AM 0 0 0 0 0 0 0 0 0 0 0 0
8:15 AM 0 0 0 0 0 0 0 0 0 0 0 0
8:30 AM 0 0 0 0 0 0 0 0 0 0 0 0
8:45 AM 0 0 0 0 0 0 0 0 0 0 0 0
Total
Rolling
HourTime
Vehicle Type
Eastbound Westbound Northbound Southbound
HONOR LN HONOR LN EAST VALLEY CENTER RD EAST VALLEY CENTER RD
Eastbound Westbound Northbound Southbound
2 0 0 0
0.0% 0.0% 2.3% 1.5%
0.58 0.80 0.83 0.73
Time
Eastbound Westbound Northbound Southbound
Time
Eastbound Westbound Northbound Southbound
All Traffic Data Services
1 EAST VALLEY CENTER RD & HONOR LN PM
Thursday, October 16, 2025
Peak Hour
04:00 PM - 05:00 PM
Peak 15-Minutes
04:15 PM - 04:30 PM
Traffic Counts - All Vehicles
U-Turn Left Thru Right RTOR U-Turn Left Thru Right RTOR U-Turn Left Thru Right RTOR U-Turn Left Thru Right RTOR
4:00 PM 0 0 0 3 0 0 2 0 3 0 0 2 56 1 0 0 0 69 0 0 136 534
4:15 PM 0 0 0 4 0 0 1 0 3 0 0 0 54 2 0 0 0 75 0 0 139 530
4:30 PM 0 1 0 2 0 0 1 0 1 0 0 3 51 4 0 0 0 63 0 0 126 511
4:45 PM 0 2 0 5 0 0 0 0 2 0 0 3 54 5 0 0 0 62 0 0 133 526
5:00 PM 0 0 0 11 0 0 1 0 2 0 1 1 47 7 0 0 0 62 0 0 132 495
5:15 PM 0 0 0 5 0 0 0 0 0 0 0 3 52 1 0 0 0 59 0 0 120 0
5:30 PM 0 1 0 7 0 0 1 0 1 0 1 3 54 3 0 0 0 70 0 0 141 0
5:45 PM 0 1 0 2 0 0 0 0 0 0 1 3 45 1 0 0 1 48 0 0 102 0
Peak Rolling Hour Flow Rates
U-Turn Left Thru Right RTOR U-Turn Left Thru Right RTOR U-Turn Left Thru Right RTOR U-Turn Left Thru Right RTOR Total
Articulated Trucks 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 2
Lights 0 3 0 14 0 0 4 0 9 0 0 8 207 12 0 0 0 268 0 0 525
Mediums 0 0 0 0 0 0 0 0 0 0 0 0 6 0 0 0 0 1 0 0 7
Total 0 3 0 14 0 0 4 0 9 0 0 8 215 12 0 0 0 269 0 0 534
Bicycles on Road 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Bicycles on Crosswalk 0
Heavy Vehicle Percentage 1.7%
Heavy Vehicle Percentage 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 3.7% 0.0% 0.0% 0.0% 0.0% 0.4% 0.0% 0.0% 1.7%
Peak Hour Factor (PHF) 0.96
Peak Hour Factor (PHF) 0.00 0.38 0.00 0.64 0.00 0.00 0.50 0.00 0.75 0.00 0.75 0.83 0.96 0.64 0.00 0.00 0.25 0.90 0.00 0.00 0.96
Bicycles on Crosswalk
CCW CW Total CCW CW Total CCW CW Total CCW CW Total
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0
Pedestrians
CCW CW Total CCW CW Total CCW CW Total CCW CW Total
4:00 PM 0 0 0 0 0 0 0 0 0 0 0 0
4:15 PM 0 0 0 0 0 0 0 0 0 0 0 0
4:30 PM 0 0 0 0 0 0 0 0 0 0 0 0
4:45 PM 0 0 0 0 0 0 0 0 0 0 0 0
5:00 PM 0 0 0 0 0 0 0 0 0 0 0 0
5:15 PM 0 0 0 0 0 0 0 0 0 0 0 0
5:30 PM 0 0 0 0 0 0 0 0 0 0 0 0
5:45 PM 0 0 0 0 0 0 0 0 0 0 0 0
Time
Eastbound Westbound Northbound Southbound
Time
Eastbound Westbound Northbound Southbound
0.70 0.65 0.95 0.90
0 0 0 0
0.0% 0.0% 3.4% 0.4%
Total
Rolling
HourTime
Vehicle Type
Eastbound Westbound Northbound Southbound
HONOR LN HONOR LN EAST VALLEY CENTER RD EAST VALLEY CENTER RD
Eastbound Westbound Northbound Southbound
ATTACHMENT D
LOS Worksheets
Level of Service Methodology
Level of Service (LOS) generally refers to the degree of congestion at an intersection. It is a measure of vehicle
operating speed, travel time, travel delays, and driving comfort. A letter scale from A to F generally describes
intersection LOS.
Signalized Intersection LOS represents the average control delay (sec/veh) and can be reported for the overall
intersection, for each approach, and for each lane group (additional v/c ratio criteria apply to lane group LOS only).
The table below outlines the HCM (7th Edition) LOS criteria for signalized intersections.
LOS Criteria for Signalized Intersections 1
Control Delay
(sec/veh)
Level of
Service 2 General Description 3
10 A Exceptionally Favorable Progression (or very short cycle lengths) – Most vehicles arrive during
the green indication and travel through the intersection without stopping.
> 10 to 20 B Highly Favorable Progression (or short cycle lengths) – While more vehicles than LOS A stop,
most vehicles still pass through the intersection without stopping.
> 20 to 35 C Favorable Progression (or moderate cycle lengths) – Individual cycle failures begin to appear, but
many vehicles still pass through the intersection without stopping.
> 35 to 55 D Ineffective Progression (or long cycle lengths) – Many vehicles stop and individual cycle failures
are noticeable.
> 55 to 80 E Unfavorable Progression (and long cycle lengths) – Individual cycle failures are frequent.
> 80 F Very Poor Progression (and long cycle lengths) – Most cycles fail to clear the queue at this level.
1 Source: Highway Capacity Manual 7th Edition, Transportation Research Board, 2022.
2 If the volume-to-capacity (v/c) ratio for a lane group exceeds 1.0, LOS F is assigned to the individual lane group. For approach-based and intersection-
wide assessments at signals, LOS is defined solely by control delay.
3 Individual cycle failures: one or more queued vehicles are not able to depart as a result of insufficient capacity during the cycle.
Synchro 12 and/or HCM 2000 LOS methodology may be used when HCM 7th Edition methodology is not supported
at an intersection (i.e., intersection geometry and/or custom phasing) or jurisdictional standards require use of an
alternative methodology.
Unsignalized Intersection LOS (two-way stop control, all-way stop control, and roundabouts) is based on the average
control delay. For two-way stop-controlled intersections, the LOS criteria apply to each controlled minor-street
approach, controlled minor-street lane group, and controlled major-street movement (additional v/c ratio criteria
apply to lane group LOS only). LOS is not calculated for major-street approaches or for the intersection as a whole at
two-way stop-controlled intersections. For all-way stop-controlled intersections and roundabouts, LOS can be
reported for the overall intersection, for each approach, and for each lane group (additional v/c ratio criteria apply to
lane group LOS only). The table below outlines the HCM (7th Edition) LOS criteria for unsignalized intersections based
on these methodologies.
Note: LOS reported for WSDOT roundabouts use signalized intersection delay criteria, per WSDOT Sidra Policy Settings.
LOS Criteria for Unsignalized Intersections1
Control Delay (sec/veh) Level of Service 2
10 A
> 10 to 15 B
> 15 to 25 C
> 25 to 35 D
> 35 to 50 E
> 50 F
1 Source: Highway Capacity Manual 7th Edition, Transportation Research Board, 2022.
2 If the volume-to-capacity (v/c) ratio for a lane group exceeds 1.0, LOS F is assigned to the
individual lane group. For approach-based and intersection-wide assessments at
unsignalized intersections, LOS is defined solely by control delay.
Lanes, Volumes, Timings
1: E Valley Center Rd & Honor Ln/Shared Access Dwy 10/29/2025
Discount Tire (Bozeman) Synchro 12 Report
2025 Existing - AM Peak Hour Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 17 12 0 4 16 155 1 1 271 3
Future Volume (vph) 0 0 17 12 0 4 16 155 1 1 271 3
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 130 0 0 240 0 260 0
Storage Lanes 0 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Link Speed (mph) 25 25 45 45
Link Distance (ft) 294 122 457 606
Travel Time (s) 8.0 3.3 6.9 9.2
Confl. Peds. (#/hr) 2 2
Peak Hour Factor 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 2% 2% 2% 2% 2% 2%
Shared Lane Traffic (%)
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
HCM 7th TWSC
1: E Valley Center Rd & Honor Ln/Shared Access Dwy 10/29/2025
Discount Tire (Bozeman) Synchro 12 Report
2025 Existing - AM Peak Hour Page 2
Intersection
Int Delay, s/veh 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 0 17 12 0 4 16 155 1 1 271 3
Future Vol, veh/h 0 0 17 12 0 4 16 155 1 1 271 3
Conflicting Peds, #/hr 0 0 0 0 0 0 2 0 0 0 0 2
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 130 - - - 240 - - 260 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 77 77 77 77 77 77 77 77 77 77 77 77
Heavy Vehicles, % 0 0 0 0 0 0 2 2 2 2 2 2
Mvmt Flow 0 0 22 16 0 5 21 201 1 1 352 4
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 501 603 180 422 604 101 358 0 0 203 0 0
Stage 1 358 358 - 244 244 - - - - - - -
Stage 2 142 244 - 179 360 - - - - - - -
Critical Hdwy 7.5 6.5 6.9 7.5 6.5 6.9 4.14 - - 4.14 - -
Critical Hdwy Stg 1 6.5 5.5 - 6.5 5.5 - - - - - - -
Critical Hdwy Stg 2 6.5 5.5 - 6.5 5.5 - - - - - - -
Follow-up Hdwy 3.5 4 3.3 3.5 4 3.3 2.22 - - 2.22 - -
Pot Cap-1 Maneuver 458 416 838 520 415 941 1197 - - 1367 - -
Stage 1 638 631 - 744 708 - - - - - - -
Stage 2 852 708 - 812 630 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 446 408 837 497 407 941 1195 - - 1367 - -
Mov Cap-2 Maneuver 446 408 - 497 407 - - - - - - -
Stage 1 636 629 - 731 696 - - - - - - -
Stage 2 832 695 - 789 628 - - - - - - -
Approach EB WB NB SB
HCM Ctrl Dly, s/v 9.42 11.63 0.75 0.03
HCM LOS A B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2 WBLn1 SBL SBT SBR
Capacity (veh/h) 1195 - - - 837 564 1367 - -
HCM Lane V/C Ratio 0.017 - - - 0.026 0.037 0.001 - -
HCM Ctrl Dly (s/v) 8.1 - - 0 9.4 11.6 7.6 - -
HCM Lane LOS A - - A A B A - -
HCM 95th %tile Q(veh) 0.1 - - - 0.1 0.1 0 - -
Lanes, Volumes, Timings
1: E Valley Center Rd & Honor Ln/Shared Access Dwy 10/29/2025
Discount Tire (Bozeman) Synchro 12 Report
2025 Existing - PM Peak Hour Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 3 0 14 4 0 9 8 215 12 0 269 0
Future Volume (vph) 3 0 14 4 0 9 8 215 12 0 269 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 130 0 0 240 0 260 0
Storage Lanes 0 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Link Speed (mph) 25 25 45 45
Link Distance (ft) 294 122 457 606
Travel Time (s) 8.0 3.3 6.9 9.2
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 3% 3% 3% 1% 1% 1%
Shared Lane Traffic (%)
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
HCM 7th TWSC
1: E Valley Center Rd & Honor Ln/Shared Access Dwy 10/29/2025
Discount Tire (Bozeman) Synchro 12 Report
2025 Existing - PM Peak Hour Page 2
Intersection
Int Delay, s/veh 0.7
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 3 0 14 4 0 9 8 215 12 0 269 0
Future Vol, veh/h 3 0 14 4 0 9 8 215 12 0 269 0
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 130 - - - 240 - - 260 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96
Heavy Vehicles, % 0 0 0 0 0 0 3 3 3 1 1 1
Mvmt Flow 3 0 15 4 0 9 8 224 13 0 280 0
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 409 533 140 387 527 118 280 0 0 236 0 0
Stage 1 280 280 - 247 247 - - - - - - -
Stage 2 129 253 - 140 280 - - - - - - -
Critical Hdwy 7.5 6.5 6.9 7.5 6.5 6.9 4.16 - - 4.12 - -
Critical Hdwy Stg 1 6.5 5.5 - 6.5 5.5 - - - - - - -
Critical Hdwy Stg 2 6.5 5.5 - 6.5 5.5 - - - - - - -
Follow-up Hdwy 3.5 4 3.3 3.5 4 3.3 2.23 - - 2.21 - -
Pot Cap-1 Maneuver 532 455 889 551 459 918 1272 - - 1335 - -
Stage 1 708 683 - 741 706 - - - - - - -
Stage 2 867 701 - 854 683 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 523 452 889 539 456 918 1272 - - 1335 - -
Mov Cap-2 Maneuver 523 452 - 539 456 - - - - - - -
Stage 1 708 683 - 736 701 - - - - - - -
Stage 2 853 697 - 840 683 - - - - - - -
Approach EB WB NB SB
HCM Ctrl Dly, s/v 9.61 9.86 0.27 0
HCM LOS A A
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2 WBLn1 SBL SBT SBR
Capacity (veh/h) 1272 - - 523 889 754 1335 - -
HCM Lane V/C Ratio 0.007 - - 0.006 0.016 0.018 - - -
HCM Ctrl Dly (s/v) 7.8 - - 11.9 9.1 9.9 0 - -
HCM Lane LOS A - - B A A A - -
HCM 95th %tile Q(veh) 0 - - 0 0.1 0.1 0 - -
Lanes, Volumes, Timings
1: E Valley Center Rd & Honor Ln/Shared Access Dwy 10/29/2025
Discount Tire (Bozeman) Synchro 12 Report
2027 No Action - AM Peak Hour Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 5 1 40 12 2 4 68 167 1 1 281 19
Future Volume (vph) 5 1 40 12 2 4 68 167 1 1 281 19
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 130 0 0 240 0 260 0
Storage Lanes 0 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Link Speed (mph) 25 25 45 45
Link Distance (ft) 294 122 457 606
Travel Time (s) 8.0 3.3 6.9 9.2
Confl. Peds. (#/hr) 2 2
Peak Hour Factor 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 2% 2% 2% 2% 2% 2%
Shared Lane Traffic (%)
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
HCM 7th TWSC
1: E Valley Center Rd & Honor Ln/Shared Access Dwy 10/29/2025
Discount Tire (Bozeman) Synchro 12 Report
2027 No Action - AM Peak Hour Page 2
Intersection
Int Delay, s/veh 2.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 1 40 12 2 4 68 167 1 1 281 19
Future Vol, veh/h 5 1 40 12 2 4 68 167 1 1 281 19
Conflicting Peds, #/hr 0 0 0 0 0 0 2 0 0 0 0 2
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 130 - - - 240 - - 260 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 77 77 77 77 77 77 77 77 77 77 77 77
Heavy Vehicles, % 0 0 0 0 0 0 2 2 2 2 2 2
Mvmt Flow 6 1 52 16 3 5 88 217 1 1 365 25
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 668 777 197 580 788 109 392 0 0 218 0 0
Stage 1 382 382 - 394 394 - - - - - - -
Stage 2 286 395 - 186 394 - - - - - - -
Critical Hdwy 7.5 6.5 6.9 7.5 6.5 6.9 4.14 - - 4.14 - -
Critical Hdwy Stg 1 6.5 5.5 - 6.5 5.5 - - - - - - -
Critical Hdwy Stg 2 6.5 5.5 - 6.5 5.5 - - - - - - -
Follow-up Hdwy 3.5 4 3.3 3.5 4 3.3 2.22 - - 2.22 - -
Pot Cap-1 Maneuver 348 331 818 402 325 930 1163 - - 1349 - -
Stage 1 618 616 - 608 609 - - - - - - -
Stage 2 703 608 - 804 609 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 316 305 816 346 300 930 1161 - - 1349 - -
Mov Cap-2 Maneuver 316 305 - 346 300 - - - - - - -
Stage 1 616 614 - 562 562 - - - - - - -
Stage 2 643 562 - 750 607 - - - - - - -
Approach EB WB NB SB
HCM Ctrl Dly, s/v 10.63 14.7 2.41 0.03
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2 WBLn1 SBL SBT SBR
Capacity (veh/h) 1161 - - 314 816 394 1349 - -
HCM Lane V/C Ratio 0.076 - - 0.025 0.064 0.059 0.001 - -
HCM Ctrl Dly (s/v) 8.4 - - 16.8 9.7 14.7 7.7 - -
HCM Lane LOS A - - C A B A - -
HCM 95th %tile Q(veh) 0.2 - - 0.1 0.2 0.2 0 - -
Lanes, Volumes, Timings
1: E Valley Center Rd & Honor Ln/Shared Access Dwy 10/29/2025
Discount Tire (Bozeman) Synchro 12 Report
2027 No Action - PM Peak Hour Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 35 3 81 4 1 9 46 219 12 0 267 25
Future Volume (vph) 35 3 81 4 1 9 46 219 12 0 267 25
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 130 0 0 240 0 260 0
Storage Lanes 0 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Link Speed (mph) 25 25 45 45
Link Distance (ft) 294 122 457 606
Travel Time (s) 8.0 3.3 6.9 9.2
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 3% 3% 3% 1% 1% 1%
Shared Lane Traffic (%)
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
HCM 7th TWSC
1: E Valley Center Rd & Honor Ln/Shared Access Dwy 10/29/2025
Discount Tire (Bozeman) Synchro 12 Report
2027 No Action - PM Peak Hour Page 2
Intersection
Int Delay, s/veh 2.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 35 3 81 4 1 9 46 219 12 0 267 25
Future Vol, veh/h 35 3 81 4 1 9 46 219 12 0 267 25
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 130 - - - 240 - - 260 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96
Heavy Vehicles, % 0 0 0 0 0 0 3 3 3 1 1 1
Mvmt Flow 36 3 84 4 1 9 48 228 13 0 278 26
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 502 628 152 471 634 120 304 0 0 241 0 0
Stage 1 291 291 - 330 330 - - - - - - -
Stage 2 210 336 - 141 304 - - - - - - -
Critical Hdwy 7.5 6.5 6.9 7.5 6.5 6.9 4.16 - - 4.12 - -
Critical Hdwy Stg 1 6.5 5.5 - 6.5 5.5 - - - - - - -
Critical Hdwy Stg 2 6.5 5.5 - 6.5 5.5 - - - - - - -
Follow-up Hdwy 3.5 4 3.3 3.5 4 3.3 2.23 - - 2.21 - -
Pot Cap-1 Maneuver 457 403 873 481 399 915 1246 - - 1330 - -
Stage 1 698 675 - 662 649 - - - - - - -
Stage 2 778 645 - 854 666 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 434 387 873 414 384 915 1246 - - 1330 - -
Mov Cap-2 Maneuver 434 387 - 414 384 - - - - - - -
Stage 1 698 675 - 637 624 - - - - - - -
Stage 2 739 620 - 768 666 - - - - - - -
Approach EB WB NB SB
HCM Ctrl Dly, s/v 11.05 10.82 1.33 0
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2 WBLn1 SBL SBT SBR
Capacity (veh/h) 1246 - - 430 873 634 1330 - -
HCM Lane V/C Ratio 0.038 - - 0.092 0.097 0.023 - - -
HCM Ctrl Dly (s/v) 8 - - 14.2 9.6 10.8 0 - -
HCM Lane LOS A - - B A B A - -
HCM 95th %tile Q(veh) 0.1 - - 0.3 0.3 0.1 0 - -
Lanes, Volumes, Timings
1: E Valley Center Rd & Honor Ln/Shared Access Dwy 10/29/2025
Discount Tire (Bozeman) Synchro 12 Report
2027 With Project - AM Peak Hour Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 5 2 40 16 2 7 68 166 7 7 279 19
Future Volume (vph) 5 2 40 16 2 7 68 166 7 7 279 19
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 130 0 0 240 0 260 0
Storage Lanes 0 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Link Speed (mph) 25 25 45 45
Link Distance (ft) 294 122 457 606
Travel Time (s) 8.0 3.3 6.9 9.2
Peak Hour Factor 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77 0.77
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 2% 2% 2% 2% 2% 2%
Shared Lane Traffic (%)
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
HCM 7th TWSC
1: E Valley Center Rd & Honor Ln/Shared Access Dwy 10/29/2025
Discount Tire (Bozeman) Synchro 12 Report
2027 With Project - AM Peak Hour Page 2
Intersection
Int Delay, s/veh 2.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 2 40 16 2 7 68 166 7 7 279 19
Future Vol, veh/h 5 2 40 16 2 7 68 166 7 7 279 19
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 130 - - - 240 - - 260 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 77 77 77 77 77 77 77 77 77 77 77 77
Heavy Vehicles, % 0 0 0 0 0 0 2 2 2 2 2 2
Mvmt Flow 6 3 52 21 3 9 88 216 9 9 362 25
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 679 794 194 597 802 112 387 0 0 225 0 0
Stage 1 393 393 - 397 397 - - - - - - -
Stage 2 286 401 - 201 405 - - - - - - -
Critical Hdwy 7.5 6.5 6.9 7.5 6.5 6.9 4.14 - - 4.14 - -
Critical Hdwy Stg 1 6.5 5.5 - 6.5 5.5 - - - - - - -
Critical Hdwy Stg 2 6.5 5.5 - 6.5 5.5 - - - - - - -
Follow-up Hdwy 3.5 4 3.3 3.5 4 3.3 2.22 - - 2.22 - -
Pot Cap-1 Maneuver 342 323 822 391 320 926 1168 - - 1341 - -
Stage 1 609 609 - 606 607 - - - - - - -
Stage 2 703 604 - 788 602 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 308 296 822 333 293 926 1168 - - 1341 - -
Mov Cap-2 Maneuver 308 296 - 333 293 - - - - - - -
Stage 1 605 605 - 560 561 - - - - - - -
Stage 2 641 559 - 730 598 - - - - - - -
Approach EB WB NB SB
HCM Ctrl Dly, s/v 10.79 14.77 2.35 0.18
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2 WBLn1 SBL SBT SBR
Capacity (veh/h) 1168 - - 305 822 401 1341 - -
HCM Lane V/C Ratio 0.076 - - 0.03 0.063 0.081 0.007 - -
HCM Ctrl Dly (s/v) 8.3 - - 17.2 9.7 14.8 7.7 - -
HCM Lane LOS A - - C A B A - -
HCM 95th %tile Q(veh) 0.2 - - 0.1 0.2 0.3 0 - -
Lanes, Volumes, Timings
1: E Valley Center Rd & Honor Ln/Shared Access Dwy 10/29/2025
Discount Tire (Bozeman) Synchro 12 Report
2027 With Project - PM Peak Hour Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 35 4 81 12 2 16 46 218 17 6 265 25
Future Volume (vph) 35 4 81 12 2 16 46 218 17 6 265 25
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 130 0 0 240 0 260 0
Storage Lanes 0 1 0 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Link Speed (mph) 25 25 45 45
Link Distance (ft) 294 122 457 606
Travel Time (s) 8.0 3.3 6.9 9.2
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Heavy Vehicles (%) 0% 0% 0% 0% 0% 0% 3% 3% 3% 1% 1% 1%
Shared Lane Traffic (%)
Sign Control Stop Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
HCM 7th TWSC
1: E Valley Center Rd & Honor Ln/Shared Access Dwy 10/29/2025
Discount Tire (Bozeman) Synchro 12 Report
2027 With Project - PM Peak Hour Page 2
Intersection
Int Delay, s/veh 2.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 35 4 81 12 2 16 46 218 17 6 265 25
Future Vol, veh/h 35 4 81 12 2 16 46 218 17 6 265 25
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free
RT Channelized - - None - - None - - None - - None
Storage Length - - 130 - - - 240 - - 260 - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96
Heavy Vehicles, % 0 0 0 0 0 0 3 3 3 1 1 1
Mvmt Flow 36 4 84 13 2 17 48 227 18 6 276 26
Major/Minor Minor2 Minor1 Major1 Major2
Conflicting Flow All 512 642 151 484 646 122 302 0 0 245 0 0
Stage 1 302 302 - 332 332 - - - - - - -
Stage 2 210 341 - 153 315 - - - - - - -
Critical Hdwy 7.5 6.5 6.9 7.5 6.5 6.9 4.16 - - 4.12 - -
Critical Hdwy Stg 1 6.5 5.5 - 6.5 5.5 - - - - - - -
Critical Hdwy Stg 2 6.5 5.5 - 6.5 5.5 - - - - - - -
Follow-up Hdwy 3.5 4 3.3 3.5 4 3.3 2.23 - - 2.21 - -
Pot Cap-1 Maneuver 449 395 875 470 393 912 1249 - - 1326 - -
Stage 1 688 668 - 661 648 - - - - - - -
Stage 2 778 642 - 840 659 - - - - - - -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 420 378 875 402 376 912 1249 - - 1326 - -
Mov Cap-2 Maneuver 420 378 - 402 376 - - - - - - -
Stage 1 685 665 - 636 623 - - - - - - -
Stage 2 732 618 - 751 656 - - - - - - -
Approach EB WB NB SB
HCM Ctrl Dly, s/v 11.2 11.69 1.31 0.16
HCM LOS B B
Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2 WBLn1 SBL SBT SBR
Capacity (veh/h) 1249 - - 415 875 569 1326 - -
HCM Lane V/C Ratio 0.038 - - 0.098 0.096 0.055 0.005 - -
HCM Ctrl Dly (s/v) 8 - - 14.6 9.6 11.7 7.7 - -
HCM Lane LOS A - - B A B A - -
HCM 95th %tile Q(veh) 0.1 - - 0.3 0.3 0.2 0 - -
ATTACHMENT E
Signal Warrant Analysis
Signal Warrant Analysis for E Valley Center Road & Honor Lane
Warrant 3 - AM Peak Hour
Condition A
This warrant is met if all three of the following conditions exist for the same 1 hour (any four consecutive
15-minute periods) of an average day:
1.The total stopped delay experienced by the traffic on one minor-street approach (one direction
only) controlled by a STOP sign equals or exceeds: 4 vehicle-hours for a one-lane approach;
or 5 vehicle-hours for a two-lane approach
E Valley Center Road & Honor Lane, EB approach (2 lanes)
Control Delay (sec/veh) = 17.2 sec/veh **Based on results from HCM 7th analysis
Stopped Delay (sec/veh) = 13.2 sec/veh
Total Volume (veh/hr) = 47 veh/hour
Vehicle-Hours = 0.17 veh-hours
CONDITION 1 MET = NO
2.The volume on the same minor-street approach (one direction only) equals or exceeds 100
vehicles per hour for one moving lane of traffic or 150 vehicles per hour for two moving lanes.
E Valley Center Road & Honor Lane, EB approach volume 47
CONDITION 2 MET =NO
3. The total entering volume serviced during the hour equals or exceeds 650 vehicle per hour for intersections
with three approaches or 800 vehicles per hour for intersections with four or more approaches.
E Valley Center Road & Honor Ln, Total entering volume 618
CONDITION 3 MET =NO
WARRANT MET =NO
NOTE:
This signal warrant shall be applied only in unusual cases, such as office complexes, manufacturing plants, industrial complexes, or high-
occupancy vehicle facilities that attract or discharge large numbers of vehicles over a short time.
Signal Warrant Analysis for E Valley Center Road & Honor Lane
Warrant 3 - AM Peak Hour
Condition B
WARRANT MET2 =NO
Notes:
1 The highest hourly minor/major approach volumes as shown in the data for Warrant 3.
2 The signal warrant is satisfied when the conditions given below exist for one hour of an average day.
MUTCD Warrant Requirements
Warrant 3: Peak Hour - Condition B
The plotted point representing the vehicles per hour on the major street (total of both
approaches) and the corresponding vehicles per hour on the higher-volume minor street
approach (one direction only) for 1 hour of an average day falls above the applicable curve
in Figure 4C-3 for the existing combination of approach lanes.
NOTE:
This signal warrant shall only be applied in unusual cases. Such cases include, but are not limited
to, office complexes, manufacturing plants, industrial complexes, or high-occupancy vehicle
facilities that attract or discharge large numbers of vehicles over a short time.
546, 47
Signal Warrant Analysis for E Valley Center Road & Honor Lane
Warrant 3 - PM Peak Hour
Condition A
This warrant is met if all three of the following conditions exist for the same 1 hour (any four consecutive
15-minute periods) of an average day:
1.The total stopped delay experienced by the traffic on one minor-street approach (one direction
only) controlled by a STOP sign equals or exceeds: 4 vehicle-hours for a one-lane approach;
or 5 vehicle-hours for a two-lane approach
E Valley Center Road & Honor Lane, EB approach (2 lanes)
Control Delay (sec/veh) = 14.6 sec/veh **Based on results from HCM 7th analysis
Stopped Delay (sec/veh) = 11.2 sec/veh
Total Volume (veh/hr) = 120 veh/hour
Vehicle-Hours = 0.37 veh-hours
CONDITION 1 MET = NO
2.The volume on the same minor-street approach (one direction only) equals or exceeds 100
vehicles per hour for one moving lane of traffic or 150 vehicles per hour for two moving lanes.
E Valley Center Road & Honor Lane, EB approach volume 120
CONDITION 2 MET =NO
3. The total entering volume serviced during the hour equals or exceeds 650 vehicle per hour for intersections
with three approaches or 800 vehicles per hour for intersections with four or more approaches.
E Valley Center Road & Honor Lane, Total entering volume 727
CONDITION 3 MET =NO
WARRANT MET =NO
NOTE:
This signal warrant shall be applied only in unusual cases, such as office complexes, manufacturing plants, industrial complexes, or high-
occupancy vehicle facilities that attract or discharge large numbers of vehicles over a short time.
Signal Warrant Analysis for E Valley Center Road & Honor Lane
Warrant 3 - PM Peak Hour
Condition B
WARRANT MET2 =NO
Notes:
1 The highest hourly minor/major approach volumes as shown in the data for Warrant 3.
2 The signal warrant is satisfied when the conditions given below exist for one hour of an average day.
MUTCD Warrant Requirements
Warrant 3: Peak Hour - Condition B
The plotted point representing the vehicles per hour on the major street (total of both
approaches) and the corresponding vehicles per hour on the higher-volume minor street
approach (one direction only) for 1 hour of an average day falls above the applicable curve
in Figure 4C-3 for the existing combination of approach lanes.
NOTE:
This signal warrant shall only be applied in unusual cases. Such cases include, but are not limited
to, office complexes, manufacturing plants, industrial complexes, or high-occupancy vehicle
facilities that attract or discharge large numbers of vehicles over a short time.