HomeMy WebLinkAboutPreApprovedPlans_8-4-26Community Development
City Commission –Housing Work Session
August 4, 2026
“Pre-Approved” Plans
Pre-Reviewed Plans
Construction plans that have undergone most reviews necessary for permit
approval, made available to potential applicants.
Cities using these approaches still require at least a basic permitting
process to verify siting on an appropriate parcel.
South Bend, IN
South Bend, IN
To encourage new construction infill on vacant lots
Worked with 3 local designers in 2022: $115K for 5-Plan Catalog
Designer owns copyright. City has license to reproduce & use plans
Now 8 building types, 3 different façade designs
Free to residents
Professional survey for lot required w/ application
6-plex requires professional stamp
91 units have been built since 2022
Estimate $5K-$8K cost savings; shorter review time
Renton, WA
8 models of ADUs, 3-6 variations per model
Free to residents
Application & Impact Fees waived
Models are as-is –cannot make structural changes
Mandatory pre-screen meeting; 2 week review
Took 2-3 years to develop plans/process
$116K cost –architecture, engineering, energy
95+ pre-screen meetings
5 approved, of which 3 built since 2021. 3 in review.
Seattle
7 models of ADUs
Applicant purchases plan from designer for $1,000
Can also purchase additional services; site plan, survey, engineering, etc.
Models are as-is –cannot make structural changes
Building plans pre-approved; site-specific process still required
2-6 week review; estimate saves 3 months
1 year to develop; call for ADU plans, criteria
~300 approved since 2020, 8-10% of all ADUs
Bozeman
Master Building Permit Process already in place
Has been used by a couple large builders
Saves time in Building Review, site review still necessary
Looking at improving timelines to make more effective
Takeaways
Budget cost –At least $350K, likely more
Time, process to create
Fee waiver concerns –cost recovery, state law
Less aesthetic variation
Currently have 55 STRs located in ADUs
Will they be used?
By the Numbers (2025)
3,583
Building
Permits
1,258
New
Dwelling
Units
22,250
Building
Inspections
303
Planning
Permits
3,782
Business
Licenses
2
Appeals
4
Lawsuits
40 State Bills
reviewed
17 Public
Outreach Events
74 Board &
Commission
Meetings
Annexation/
Initial Zoning Pre-application Preliminary Plat
Infrastructure Design
& Construction Final Plat Concept Plan
Site Plan Building
Permit
Building
Construction Occupancy
Land Use Plan &
Facility Plans
Planning & Permitting Process
Who We Are
CD DirectorErin George
Bozeman Community Development
Current Planning ManagerBrian Krueger Long Range Planning Manager
Chris Saunders
Administrative ManagerLacie Kloosterhof
Development Review Coordinator
Luz Chase
Development Review
Coordinator
Audrey ChorakSenior PlannerTom RogersSenior PlannerDanielle Garber CD Technician IIIClay Galloway
CD Technician IIIDerek Homan
CD Technician IIISam Sagstetter
CD Technician IIJulie Brown
CD Technician IMonica Marbut
CD Technician IITrenton Ruffalo
Senior PlannerSusana Montana
Associate PlannerZachary Moon
Associate PlannerAndrew Stromme
Deputy DirectorRebecca Harbage
Chief Building OfficialBen Abbey
Building Inspector John Cevasco Senior Plans ExaminerCal Doerksen
Building Inspector Garrett Lauer Senior Plans ExaminerKevin Bailey
Building InspectorPaul Neidhardt
Building InspectorRhea Papke
Senior Plans ExaminerDavid Mulick
Building InspectorTony Modugno
Building InspectorShawn O'Donnell
Building InspectorJack Linsted
Building InspectorVacant
CD Technician IMelanie Hoffman
Development Review Coordinator
Jessica Mooring
Building InspectorVacant
Assistant PlannerJonathan Fuller
Associate PlannerCollin Mieras
Development Review Planner
Bailey Minnich
Historic Preservation Planner
Vacant
Location Processes Uses
Form and
Intensity NCOD Utilities Parks
Affordable
Housing
Natural
Resources Transport Landscape Community
Design
Chpt. 38 Unified Dev. Code Elements
Applications-Minor and Major
Development Review Committee
Weekly Review Meeting
Current Planning
Project Dox
Current Planning
Project Review
Still Confused? Not Sure Who to Call?
•Shared inboxes monitored by multiple staff
•building@bozemanmt.gov
•planningtech@bozemanmt.gov
•businesslicenses@bozemanmt.gov
•drcoordinator@bozemanmt.gov
•Connecting with Reviewers
•Planner of the Day (POD) – Planner available each day for questions
•Plans Examiner appointments available via Vagaro