Loading...
HomeMy WebLinkAbout26 - Notice of Awards - Bikefill Park Infrastructure McIlhattan Roadway ImprovementsNOTICE OF AWARD Date of Issuance: Owner: City of Bozeman Owner’s Project No.: Engineer: Sanbell Engineer’s Project No.: Project: Bikefill Park Infrastructure: McIlhattan Roadway Improvements Contract Name: Bidder: Knife River Bidder’s Address: 630 Airway Boulevard, Belgrade, MT 59714 You are notified that Owner has accepted your Bid dated July 9, 2026 for the above Contract, and that you are the Successful Bidder and are awarded a Contract for: Bikefill Park Infrastructure: McIlhattan Roadway Improvements The Contract Price of the awarded Contract is $ 985,323.50. Contract Price is subject to adjustment based on the provisions of the Contract, including but not limited to those governing changes, Unit Price Work, and Work performed on a cost-plus-fee basis, as applicable. 3 unexecuted counterparts of the Agreement accompany this Notice of Award, and one copy of the Contract Documents accompanies this Notice of Award, or has been transmitted or made available to Bidder electronically. ☐ Drawings will be delivered separately from the other Contract Documents. You must comply with the following conditions precedent within 15 days of the date of receipt of this Notice of Award: 1. Deliver to Owner 3 counterparts of the Agreement, signed by Bidder (as Contractor). 2. Deliver with the signed Agreement(s) the Contract security (such as required performance and payment bonds) and insurance documentation, as specified in the Instructions to Bidders and in the General Conditions, Articles 2 and 6. 3. Other conditions precedent (if any): None Failure to comply with these conditions within the time specified will entitle Owner to consider you in default, annul this Notice of Award, and declare your Bid security forfeited. Within 10 days after you comply with the above conditions, Owner will return to you one fully signed counterpart of the Agreement, together with any additional copies of the Contract Documents as indicated in Paragraph 2.02 of the General Conditions. Owner: City of Bozeman By (signature): Name (printed): Title: Copy: Engineer EJCDC® C-510, Notice of Award. Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1 of 1 Docusign Envelope ID: 962B1E3E-3E73-8043-81A0-3822B301D4DF City Manager Chuck Winn July 10, 2026 Mr. Kellen Gamradt City of Bozeman 20 E Olive Street #202 Bozeman, MT 59715 SUBJECT: BID AWARD RECOMMENDATION Bikefill Bike Park Infrastructure McIlhattan Roadway Improvements, Sanbell Project No. 22147.01 City Infrastructure Project No. ENGINF-18303 Dear Kellen: On July 9, 2026, competitive bids for the above referenced project were accepted and publicly opened. Ten bids were received from Knife River - Belgrade, Central Plumbing Heating and Excavation, CK May Excavating, Inc., Broadwater Excavation, Williams Civil Construction, DC Excavation, LLC, Roller Construction Inc., Schreder & Brandt MFG, Inc, Equitable, and Ridgeline Excavation, Inc. The following page includes a summary table of the verified bids relative to the engineer’s opinion of probable cost. No discrepancies were noted in Knife River – Belgrade’s bid. Based on this review, Sanbell recommends that the City of Bozeman move forward with a contract award to Knife River - Belgrade in the amount of $985,323.50. A copy of the bid tabulation is attached for reference. Please call if you have any questions or would like further information. Sincerely, Bobby Egeberg, PE Associate | Bozeman Land Development Manager enclosures: Bid Tabulation Docusign Envelope ID: 962B1E3E-3E73-8043-81A0-3822B301D4DF Owner: Bozeman MT, City of Solicitor: Bozeman MT, City of 07/09/2026 03:00 PM MDT Engineer Estimate Knife River - Belgrade Section Title Line Item Item Code Item Description UofM Quantity Unit Price Extension Unit Price Extension Schedule I: Utility Improvements-Base Bid $187,250.00 $203,785.50 100 100 Mobilization and Insurance LS1 $20,000.00 $20,000.00 $16,100.00 $16,100.00 101 101 Dewatering LS1 $15,000.00 $15,000.00 $5,500.00 $5,500.00 102 102 Storm Drain Curb Inlet EA2 $5,000.00 $10,000.00 $4,500.00 $9,000.00 103 103 ADS Storm Chamber and Gravel CF 2250 $16.00 $36,000.00 $24.25 $54,562.50 104 104 Storm Manhole/ Inlet EA7 $5,500.00 $38,500.00 $5,300.00 $37,100.00 105 105 12" Storm Drain w/ FES LF 200 $80.00 $16,000.00 $90.00 $18,000.00 106 106 15" Storm Drain w/ FES LF 46 $100.00 $4,600.00 $98.00 $4,508.00 107 107 72" Equiv. RCP Arch Culvert w/ FES LF 77 $450.00 $34,650.00 $670.00 $51,590.00 108 108 Riprap CY 25 $200.00 $5,000.00 $165.00 $4,125.00 109 109 Construction Staking LS1 $7,500.00 $7,500.00 $3,300.00 $3,300.00 Schedule II: Surface Improvements-Base Bid $1,192,336.50 $741,538.00 200 200 Mobilization and Insurance LS1 $125,000.00 $125,000.00 $66,850.00 $66,850.00 201 201 Traffic Control LS1 $12,000.00 $12,000.00 $5,000.00 $5,000.00 202 202 SWPPP Permitting, Storm Water Management and Erosion Control LS1 $20,000.00 $20,000.00 $19,250.00 $19,250.00 203 203 Strip, Stockpile & Replace or Dispose of Topsoil (6")CY 1350 $16.00 $21,600.00 $15.75 $21,262.50 204 204 Stockpile or Dispose of Cut Excavation CY 19100 $18.00 $343,800.00 $8.00 $152,800.00 205 205 1 1/2-inch Base Course Gravel - Street (4-inch Thick)CY 778 $48.00 $37,344.00 $46.00 $35,788.00 206 206 6" Minus Crushed Subbase Gravel (12-inch Thick)CY 2184 $40.00 $87,360.00 $33.00 $72,072.00 207 207 Asphalt Surface Course - Street (4-inch Section)SY 5890 $38.00 $223,820.00 $23.50 $138,415.00 208 208 Mirafi 380i Separation Fabric SY 5890 $5.00 $29,450.00 $5.00 $29,450.00 209 209 Asphalt Curb LF 965 $19.50 $18,817.50 $10.50 $10,132.50 210 210 MGS Guardrail LF 1680 $39.00 $65,520.00 $43.00 $72,240.00 211 211 MGS Long Span Guardrail LF 150 $45.00 $6,750.00 $45.00 $6,750.00 212 212 Guardrail Terminal End Section EA4 $4,500.00 $18,000.00 $4,000.00 $16,000.00 213 213 Sawcut and Asphalt Removal SF 110 $7.00 $770.00 $5.00 $550.00 214 214 Signage EA2 $1,000.00 $2,000.00 $1,350.00 $2,700.00 215 215 Epoxy Pavement Markings (White)GAL 22 $500.00 $11,000.00 $160.00 $3,520.00 216 216 Epoxy Pavement Markings (Yellow)GAL 18 $500.00 $9,000.00 $160.00 $2,880.00 217 217 Fence Removal and Storage LF 2080 $15.00 $31,200.00 $8.50 $17,680.00 218 218 Sloughing Repair LS1 $15,000.00 $15,000.00 $4,500.00 $4,500.00 219 219 S150 Erosion Control Blankets SY 7785 $3.00 $23,355.00 $3.80 $29,583.00 220 220 Hydroseeding SF 70050 $1.00 $70,050.00 $0.30 $21,015.00 221 221 Bollard Removal/Reinstallation and DEQ Well Casing Removal/Reinstall Secure Cap LS1 $13,000.00 $13,000.00 $5,100.00 $5,100.00 222 222 Construction Staking LS1 $7,500.00 $7,500.00 $8,000.00 $8,000.00 Schedule II: Surface Improvements-Fixed $40,000.00 $40,000.00 224 224 Miscellaneous Work LS1 $40,000.00 $40,000.00 $40,000.00 $40,000.00 Base Bid Total:$1,419,586.50 $985,323.50 Docusign Envelope ID: 962B1E3E-3E73-8043-81A0-3822B301D4DF Owner: Bozeman MT, City of Solicitor: Bozeman MT, City of 07/09/2026 03:00 PM MDT Section Title Line Item Item Code Item Description UofM Quantity Schedule I: Utility Improvements-Base Bid 100 100 Mobilization and Insurance LS1 101 101 Dewatering LS1 102 102 Storm Drain Curb Inlet EA2 103 103 ADS Storm Chamber and Gravel CF 2250 104 104 Storm Manhole/ Inlet EA7 105 105 12" Storm Drain w/ FES LF 200 106 106 15" Storm Drain w/ FES LF 46 107 107 72" Equiv. RCP Arch Culvert w/ FES LF 77 108 108 Riprap CY 25 109 109 Construction Staking LS1 Schedule II: Surface Improvements-Base Bid 200 200 Mobilization and Insurance LS1 201 201 Traffic Control LS1 202 202 SWPPP Permitting, Storm Water Management and Erosion Control LS1 203 203 Strip, Stockpile & Replace or Dispose of Topsoil (6")CY 1350 204 204 Stockpile or Dispose of Cut Excavation CY 19100 205 205 1 1/2-inch Base Course Gravel - Street (4-inch Thick)CY 778 206 206 6" Minus Crushed Subbase Gravel (12-inch Thick)CY 2184 207 207 Asphalt Surface Course - Street (4-inch Section)SY 5890 208 208 Mirafi 380i Separation Fabric SY 5890 209 209 Asphalt Curb LF 965 210 210 MGS Guardrail LF 1680 211 211 MGS Long Span Guardrail LF 150 212 212 Guardrail Terminal End Section EA4 213 213 Sawcut and Asphalt Removal SF 110 214 214 Signage EA2 215 215 Epoxy Pavement Markings (White)GAL 22 216 216 Epoxy Pavement Markings (Yellow)GAL 18 217 217 Fence Removal and Storage LF 2080 218 218 Sloughing Repair LS1 219 219 S150 Erosion Control Blankets SY 7785 220 220 Hydroseeding SF 70050 221 221 Bollard Removal/Reinstallation and DEQ Well Casing Removal/Reinstall Secure Cap LS1 222 222 Construction Staking LS1 Schedule II: Surface Improvements-Fixed 224 224 Miscellaneous Work LS1 Base Bid Total: Central Plumbing Heating and Excavation CK May Excavating, Inc. Unit Price Extension Unit Price Extension $173,017.00 $195,275.00 $10,400.00 $10,400.00 $4,000.00 $4,000.00 $4,400.00 $4,400.00 $2,500.00 $2,500.00 $3,878.00 $7,756.00 $4,500.00 $9,000.00 $19.50 $43,875.00 $23.00 $51,750.00 $4,135.00 $28,945.00 $5,900.00 $41,300.00 $54.00 $10,800.00 $85.00 $17,000.00 $66.00 $3,036.00 $100.00 $4,600.00 $690.00 $53,130.00 $750.00 $57,750.00 $287.00 $7,175.00 $175.00 $4,375.00 $3,500.00 $3,500.00 $3,000.00 $3,000.00 $775,356.00 $762,715.00 $57,145.00 $57,145.00 $28,400.00 $28,400.00 $4,040.00 $4,040.00 $8,500.00 $8,500.00 $16,500.00 $16,500.00 $6,560.00 $6,560.00 $7.50 $10,125.00 $15.00 $20,250.00 $4.90 $93,590.00 $7.00 $133,700.00 $76.00 $59,128.00 $70.00 $54,460.00 $45.00 $98,280.00 $45.00 $98,280.00 $27.00 $159,030.00 $31.00 $182,590.00 $5.00 $29,450.00 $4.00 $23,560.00 $50.00 $48,250.00 $25.00 $24,125.00 $46.75 $78,540.00 $45.00 $75,600.00 $49.50 $7,425.00 $45.00 $6,750.00 $4,386.00 $17,544.00 $4,000.00 $16,000.00 $6.00 $660.00 $2.50 $275.00 $1,400.00 $2,800.00 $1,000.00 $2,000.00 $274.00 $6,028.00 $175.00 $3,850.00 $274.00 $4,932.00 $175.00 $3,150.00 $8.50 $17,680.00 $10.00 $20,800.00 $7,500.00 $7,500.00 $5,500.00 $5,500.00 $2.80 $21,798.00 $3.00 $23,355.00 $0.22 $15,411.00 $0.20 $14,010.00 $8,000.00 $8,000.00 $3,500.00 $3,500.00 $11,500.00 $11,500.00 $7,500.00 $7,500.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $988,373.00 $997,990.00 Docusign Envelope ID: 962B1E3E-3E73-8043-81A0-3822B301D4DF Owner: Bozeman MT, City of Solicitor: Bozeman MT, City of 07/09/2026 03:00 PM MDT Section Title Line Item Item Code Item Description UofM Quantity Schedule I: Utility Improvements-Base Bid 100 100 Mobilization and Insurance LS1 101 101 Dewatering LS1 102 102 Storm Drain Curb Inlet EA2 103 103 ADS Storm Chamber and Gravel CF 2250 104 104 Storm Manhole/ Inlet EA7 105 105 12" Storm Drain w/ FES LF 200 106 106 15" Storm Drain w/ FES LF 46 107 107 72" Equiv. RCP Arch Culvert w/ FES LF 77 108 108 Riprap CY 25 109 109 Construction Staking LS1 Schedule II: Surface Improvements-Base Bid 200 200 Mobilization and Insurance LS1 201 201 Traffic Control LS1 202 202 SWPPP Permitting, Storm Water Management and Erosion Control LS1 203 203 Strip, Stockpile & Replace or Dispose of Topsoil (6")CY 1350 204 204 Stockpile or Dispose of Cut Excavation CY 19100 205 205 1 1/2-inch Base Course Gravel - Street (4-inch Thick)CY 778 206 206 6" Minus Crushed Subbase Gravel (12-inch Thick)CY 2184 207 207 Asphalt Surface Course - Street (4-inch Section)SY 5890 208 208 Mirafi 380i Separation Fabric SY 5890 209 209 Asphalt Curb LF 965 210 210 MGS Guardrail LF 1680 211 211 MGS Long Span Guardrail LF 150 212 212 Guardrail Terminal End Section EA4 213 213 Sawcut and Asphalt Removal SF 110 214 214 Signage EA2 215 215 Epoxy Pavement Markings (White)GAL 22 216 216 Epoxy Pavement Markings (Yellow)GAL 18 217 217 Fence Removal and Storage LF 2080 218 218 Sloughing Repair LS1 219 219 S150 Erosion Control Blankets SY 7785 220 220 Hydroseeding SF 70050 221 221 Bollard Removal/Reinstallation and DEQ Well Casing Removal/Reinstall Secure Cap LS1 222 222 Construction Staking LS1 Schedule II: Surface Improvements-Fixed 224 224 Miscellaneous Work LS1 Base Bid Total: Broadwater Excavation Williams Civil Construction Unit Price Extension Unit Price Extension $218,592.50 $302,800.00 $45,000.00 $45,000.00 $71,000.00 $71,000.00 $12,000.00 $12,000.00 $6,800.00 $6,800.00 $4,500.00 $9,000.00 $5,500.00 $11,000.00 $17.15 $38,587.50 $25.00 $56,250.00 $5,500.00 $38,500.00 $5,600.00 $39,200.00 $62.00 $12,400.00 $173.00 $34,600.00 $80.00 $3,680.00 $175.00 $8,050.00 $650.00 $50,050.00 $800.00 $61,600.00 $135.00 $3,375.00 $320.00 $8,000.00 $6,000.00 $6,000.00 $6,300.00 $6,300.00 $871,083.55 $828,539.40 $30,000.00 $30,000.00 $73,500.00 $73,500.00 $15,000.00 $15,000.00 $3,300.00 $3,300.00 $12,000.00 $12,000.00 $7,000.00 $7,000.00 $9.00 $12,150.00 $14.50 $19,575.00 $14.75 $281,725.00 $6.00 $114,600.00 $31.75 $24,701.50 $58.00 $45,124.00 $28.85 $63,008.40 $46.00 $100,464.00 $35.46 $208,859.40 $36.50 $214,985.00 $4.75 $27,977.50 $5.00 $29,450.00 $14.00 $13,510.00 $19.11 $18,441.15 $40.50 $68,040.00 $47.00 $78,960.00 $42.85 $6,427.50 $50.00 $7,500.00 $3,800.00 $15,200.00 $4,400.00 $17,600.00 $6.00 $660.00 $8.50 $935.00 $1,250.00 $2,500.00 $1,325.00 $2,650.00 $180.00 $3,960.00 $175.00 $3,850.00 $180.00 $3,240.00 $175.00 $3,150.00 $5.00 $10,400.00 $9.25 $19,240.00 $25,000.00 $25,000.00 $12,800.00 $12,800.00 $2.25 $17,516.25 $4.15 $32,307.75 $0.16 $11,208.00 $0.15 $10,507.50 $8,000.00 $8,000.00 $6,300.00 $6,300.00 $10,000.00 $10,000.00 $6,300.00 $6,300.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $1,129,676.05 $1,171,339.40 Docusign Envelope ID: 962B1E3E-3E73-8043-81A0-3822B301D4DF Owner: Bozeman MT, City of Solicitor: Bozeman MT, City of 07/09/2026 03:00 PM MDT Section Title Line Item Item Code Item Description UofM Quantity Schedule I: Utility Improvements-Base Bid 100 100 Mobilization and Insurance LS1 101 101 Dewatering LS1 102 102 Storm Drain Curb Inlet EA2 103 103 ADS Storm Chamber and Gravel CF 2250 104 104 Storm Manhole/ Inlet EA7 105 105 12" Storm Drain w/ FES LF 200 106 106 15" Storm Drain w/ FES LF 46 107 107 72" Equiv. RCP Arch Culvert w/ FES LF 77 108 108 Riprap CY 25 109 109 Construction Staking LS1 Schedule II: Surface Improvements-Base Bid 200 200 Mobilization and Insurance LS1 201 201 Traffic Control LS1 202 202 SWPPP Permitting, Storm Water Management and Erosion Control LS1 203 203 Strip, Stockpile & Replace or Dispose of Topsoil (6")CY 1350 204 204 Stockpile or Dispose of Cut Excavation CY 19100 205 205 1 1/2-inch Base Course Gravel - Street (4-inch Thick)CY 778 206 206 6" Minus Crushed Subbase Gravel (12-inch Thick)CY 2184 207 207 Asphalt Surface Course - Street (4-inch Section)SY 5890 208 208 Mirafi 380i Separation Fabric SY 5890 209 209 Asphalt Curb LF 965 210 210 MGS Guardrail LF 1680 211 211 MGS Long Span Guardrail LF 150 212 212 Guardrail Terminal End Section EA4 213 213 Sawcut and Asphalt Removal SF 110 214 214 Signage EA2 215 215 Epoxy Pavement Markings (White)GAL 22 216 216 Epoxy Pavement Markings (Yellow)GAL 18 217 217 Fence Removal and Storage LF 2080 218 218 Sloughing Repair LS1 219 219 S150 Erosion Control Blankets SY 7785 220 220 Hydroseeding SF 70050 221 221 Bollard Removal/Reinstallation and DEQ Well Casing Removal/Reinstall Secure Cap LS1 222 222 Construction Staking LS1 Schedule II: Surface Improvements-Fixed 224 224 Miscellaneous Work LS1 Base Bid Total: DC Excavation, LLC Roller Construction Inc. Unit Price Extension Unit Price Extension $249,404.90 $277,347.25 $36,275.12 $36,275.12 $25,727.00 $25,727.00 $10,120.28 $10,120.28 $60,000.00 $60,000.00 $4,908.67 $9,817.34 $5,250.00 $10,500.00 $25.28 $56,880.00 $26.60 $59,850.00 $6,025.83 $42,180.81 $5,830.00 $40,810.00 $90.95 $18,190.00 $52.00 $10,400.00 $98.55 $4,533.30 $67.00 $3,082.00 $796.45 $61,326.65 $717.25 $55,228.25 $210.64 $5,266.00 $170.00 $4,250.00 $4,815.40 $4,815.40 $7,500.00 $7,500.00 $935,495.11 $1,040,553.65 $50,658.75 $50,658.75 $75,000.00 $75,000.00 $6,019.25 $6,019.25 $25,000.00 $25,000.00 $20,492.28 $20,492.28 $40,000.00 $40,000.00 $34.61 $46,723.50 $8.00 $10,800.00 $7.99 $152,609.00 $10.00 $191,000.00 $60.56 $47,115.68 $72.00 $56,016.00 $43.84 $95,746.56 $68.00 $148,512.00 $37.92 $223,348.80 $36.22 $213,335.80 $6.19 $36,459.10 $5.50 $32,395.00 $19.86 $19,164.90 $18.97 $18,306.05 $48.76 $81,916.80 $50.62 $85,041.60 $51.59 $7,738.50 $53.56 $8,034.00 $4,574.63 $18,298.52 $4,750.00 $19,000.00 $7.59 $834.90 $15.50 $1,705.00 $1,504.82 $3,009.64 $1,563.00 $3,126.00 $180.58 $3,972.76 $172.50 $3,795.00 $180.58 $3,250.44 $172.50 $3,105.00 $18.19 $37,835.20 $10.00 $20,800.00 $6,918.96 $6,918.96 $15,000.00 $15,000.00 $5.78 $44,997.30 $5.52 $42,973.20 $0.29 $20,314.50 $0.18 $12,609.00 $3,254.37 $3,254.37 $7,500.00 $7,500.00 $4,815.40 $4,815.40 $7,500.00 $7,500.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $1,224,900.01 $1,357,900.90 Docusign Envelope ID: 962B1E3E-3E73-8043-81A0-3822B301D4DF Owner: Bozeman MT, City of Solicitor: Bozeman MT, City of 07/09/2026 03:00 PM MDT Section Title Line Item Item Code Item Description UofM Quantity Schedule I: Utility Improvements-Base Bid 100 100 Mobilization and Insurance LS1 101 101 Dewatering LS1 102 102 Storm Drain Curb Inlet EA2 103 103 ADS Storm Chamber and Gravel CF 2250 104 104 Storm Manhole/ Inlet EA7 105 105 12" Storm Drain w/ FES LF 200 106 106 15" Storm Drain w/ FES LF 46 107 107 72" Equiv. RCP Arch Culvert w/ FES LF 77 108 108 Riprap CY 25 109 109 Construction Staking LS1 Schedule II: Surface Improvements-Base Bid 200 200 Mobilization and Insurance LS1 201 201 Traffic Control LS1 202 202 SWPPP Permitting, Storm Water Management and Erosion Control LS1 203 203 Strip, Stockpile & Replace or Dispose of Topsoil (6")CY 1350 204 204 Stockpile or Dispose of Cut Excavation CY 19100 205 205 1 1/2-inch Base Course Gravel - Street (4-inch Thick)CY 778 206 206 6" Minus Crushed Subbase Gravel (12-inch Thick)CY 2184 207 207 Asphalt Surface Course - Street (4-inch Section)SY 5890 208 208 Mirafi 380i Separation Fabric SY 5890 209 209 Asphalt Curb LF 965 210 210 MGS Guardrail LF 1680 211 211 MGS Long Span Guardrail LF 150 212 212 Guardrail Terminal End Section EA4 213 213 Sawcut and Asphalt Removal SF 110 214 214 Signage EA2 215 215 Epoxy Pavement Markings (White)GAL 22 216 216 Epoxy Pavement Markings (Yellow)GAL 18 217 217 Fence Removal and Storage LF 2080 218 218 Sloughing Repair LS1 219 219 S150 Erosion Control Blankets SY 7785 220 220 Hydroseeding SF 70050 221 221 Bollard Removal/Reinstallation and DEQ Well Casing Removal/Reinstall Secure Cap LS1 222 222 Construction Staking LS1 Schedule II: Surface Improvements-Fixed 224 224 Miscellaneous Work LS1 Base Bid Total: Schreder & Brandt MFG, Inc Equitable Unit Price Extension Unit Price Extension $360,995.42 $215,730.00 $90,000.00 $90,000.00 $20,000.00 $20,000.00 $3,750.00 $3,750.00 $15,000.00 $15,000.00 $3,545.00 $7,090.00 $8,000.00 $16,000.00 $27.81 $62,572.50 $18.00 $40,500.00 $9,054.91 $63,384.37 $6,000.00 $42,000.00 $139.50 $27,900.00 $65.00 $13,000.00 $121.30 $5,579.80 $80.00 $3,680.00 $1,012.50 $77,962.50 $650.00 $50,050.00 $660.25 $16,506.25 $220.00 $5,500.00 $6,250.00 $6,250.00 $10,000.00 $10,000.00 $1,017,816.55 $1,234,120.25 $56,250.00 $56,250.00 $72,311.25 $72,311.25 $4,375.00 $4,375.00 $20,000.00 $20,000.00 $46,447.81 $46,447.81 $35,000.00 $35,000.00 $27.56 $37,206.00 $15.00 $20,250.00 $7.99 $152,609.00 $20.67 $394,797.00 $70.54 $54,880.12 $62.00 $48,236.00 $55.06 $120,251.04 $48.00 $104,832.00 $28.89 $170,162.10 $32.00 $188,480.00 $7.88 $46,413.20 $4.00 $23,560.00 $68.91 $66,498.15 $21.35 $20,602.75 $50.63 $85,058.40 $80.00 $134,400.00 $53.56 $8,034.00 $115.00 $17,250.00 $4,750.00 $19,000.00 $8,500.00 $34,000.00 $28.69 $3,155.90 $9.00 $990.00 $1,562.50 $3,125.00 $1,250.00 $2,500.00 $479.25 $10,543.50 $250.00 $5,500.00 $545.71 $9,822.78 $250.00 $4,500.00 $18.89 $39,291.20 $12.00 $24,960.00 $6,937.50 $6,937.50 $10,000.00 $10,000.00 $6.31 $49,123.35 $3.55 $27,636.75 $0.15 $10,507.50 $0.29 $20,314.50 $11,875.00 $11,875.00 $12,000.00 $12,000.00 $6,250.00 $6,250.00 $12,000.00 $12,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $40,000.00 $1,418,811.97 $1,489,850.25 Docusign Envelope ID: 962B1E3E-3E73-8043-81A0-3822B301D4DF Owner: Bozeman MT, City of Solicitor: Bozeman MT, City of 07/09/2026 03:00 PM MDT Section Title Line Item Item Code Item Description UofM Quantity Schedule I: Utility Improvements-Base Bid 100 100 Mobilization and Insurance LS1 101 101 Dewatering LS1 102 102 Storm Drain Curb Inlet EA2 103 103 ADS Storm Chamber and Gravel CF 2250 104 104 Storm Manhole/ Inlet EA7 105 105 12" Storm Drain w/ FES LF 200 106 106 15" Storm Drain w/ FES LF 46 107 107 72" Equiv. RCP Arch Culvert w/ FES LF 77 108 108 Riprap CY 25 109 109 Construction Staking LS1 Schedule II: Surface Improvements-Base Bid 200 200 Mobilization and Insurance LS1 201 201 Traffic Control LS1 202 202 SWPPP Permitting, Storm Water Management and Erosion Control LS1 203 203 Strip, Stockpile & Replace or Dispose of Topsoil (6")CY 1350 204 204 Stockpile or Dispose of Cut Excavation CY 19100 205 205 1 1/2-inch Base Course Gravel - Street (4-inch Thick)CY 778 206 206 6" Minus Crushed Subbase Gravel (12-inch Thick)CY 2184 207 207 Asphalt Surface Course - Street (4-inch Section)SY 5890 208 208 Mirafi 380i Separation Fabric SY 5890 209 209 Asphalt Curb LF 965 210 210 MGS Guardrail LF 1680 211 211 MGS Long Span Guardrail LF 150 212 212 Guardrail Terminal End Section EA4 213 213 Sawcut and Asphalt Removal SF 110 214 214 Signage EA2 215 215 Epoxy Pavement Markings (White)GAL 22 216 216 Epoxy Pavement Markings (Yellow)GAL 18 217 217 Fence Removal and Storage LF 2080 218 218 Sloughing Repair LS1 219 219 S150 Erosion Control Blankets SY 7785 220 220 Hydroseeding SF 70050 221 221 Bollard Removal/Reinstallation and DEQ Well Casing Removal/Reinstall Secure Cap LS1 222 222 Construction Staking LS1 Schedule II: Surface Improvements-Fixed 224 224 Miscellaneous Work LS1 Base Bid Total: Ridgeline Excavation, Inc Unit Price Extension $256,980.00 $20,000.00 $20,000.00 $12,500.00 $12,500.00 $7,500.00 $15,000.00 $20.00 $45,000.00 $7,500.00 $52,500.00 $100.00 $20,000.00 $105.00 $4,830.00 $950.00 $73,150.00 $400.00 $10,000.00 $4,000.00 $4,000.00 $1,238,377.50 $130,000.00 $130,000.00 $6,500.00 $6,500.00 $7,500.00 $7,500.00 $50.00 $67,500.00 $20.00 $382,000.00 $70.00 $54,460.00 $45.00 $98,280.00 $42.50 $250,325.00 $6.00 $35,340.00 $25.00 $24,125.00 $50.00 $84,000.00 $55.00 $8,250.00 $4,500.00 $18,000.00 $3.00 $330.00 $1,500.00 $3,000.00 $200.00 $4,400.00 $200.00 $3,600.00 $10.00 $20,800.00 $8,500.00 $8,500.00 $2.50 $19,462.50 $0.10 $7,005.00 $3,000.00 $3,000.00 $2,000.00 $2,000.00 $40,000.00 $40,000.00 $40,000.00 $1,535,357.50 Docusign Envelope ID: 962B1E3E-3E73-8043-81A0-3822B301D4DF Name:Contractor #:Affirmation Form:Bid Bond:Base Bid Total: Knife River 10089 x x $ 985,323.50 Central Excavation 4443 x x $ 988,373.00 CK May Excavating 35949 x x 997,990.00$ Broadwater Excavation 269246 x x 1,129,676.05$ Williams Civil Construction 158949 x x 1,171,339.40$ DC Excavation 224559 x x 1,224,900.01$ Roller Excavation 234243 x x 1,357,900.90$ Schreder & Brandt MFG 285154 x x 1,418,811.97$ Equitable 257749 x x 1,489,850.25$ Ridgeline Excavation 261451 x x 1,535,357.50$ Mike Maas Kellen Gamradt City Clerk Engineer II Bid Check:Delivered to Finance:Accepted By:Date: Bid Tab - McIlhattan Roadway Improvements These bids were opened and read before the undersigned at 3:00 pm on Thursday, July 9, 2026 Docusign Envelope ID: 962B1E3E-3E73-8043-81A0-3822B301D4DF