HomeMy WebLinkAbout015-SP2.1-Specifications Docusign Envelope ID:OB8B83E5-B8B3-4B58-A2DC-E6EFCF2DDOFD STAMP:
PART 3: EXECUTION 2. SPLICES SHALL BE MADE ONLY AT OUTLETS, JUNCTION BOXES, OR C. TEST PROCEDURES:
kh ACCESSIBLE RACEWAYS WITH PRESSURE-TYPE CONNECTORS. "" 512/2026
3.1 GENERAL: 1. ALL FEEDERS SHALL HAVE THEIR INSULATION TESTED AFTER INSTALLATION, BUT '.
3. PULLING LUBRICANTS SHALL BE SOAPSTONE POWDER, POWDERED TALC, OR A BEFORE CONNECTION TO DEVICES. THE CONDUCTORS SHALL TEST FREE FROM p N Tq N'•,
A. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH COMMERCIAL PULLING COMPOUND. NO SOAP SUDS, SOAP FLAKES, OIL, OR SHORT CIRCUITS AND GROUNDS. TESTING SHALL BE FOR ONE MINUTE USING 9
3 THE MANUFACTURER'S RECOMMENDATIONS. GREASE SHALL BE USED, AS THESE MAY BE HARMFUL TO CABLE INSULATION. 1000V DC. INVESTIGATE ANY VALUES LESS THAN 50 MEGAOHMS.
z'w CONTRACTOR SHALL USE NYLON OR HEMP ROPE FOR PULLING CABLE TO
B. EQUIPMENT SHALL BE TIGHTLY COVERED AND PROTECTED AGAINST DIRT OR WATER, AVOID SCORING THE CONDUIT. 2. PRIOR TO ENERGIZING CIRCUITRY, TEST WIRING DEVICES FOR ELECTRICAL SHELTON DOUGLAS
AND AGAINST CHEMICAL OR MECHANICAL INJURY DURING INSTALLATION AND CONTINUITY AND PROPER POLARITY CONNECTIONS. KEISLING
CONSTRUCTION PERIODS. 4. CABLES SHALL BE NEATLY TRAINED, WITHOUT INTERLACING, AND BE OF
' SUFFICIENT LENGTH IN ALL BOXES, EQUIPMENT, ETC. TO PERMIT MAKING A 3. MEASURE AND RECORD VOLTAGES BETWEEN PHASES AND BETWEEN PHASE No.PEL-PE-LIC-86951
3.2 LABOR AND WORKMANSHIP: NEAT ARRANGEMENT. CABLES SHALL BE SECURED IN A MANNER TO AVOID WIRES AND NEUTRALS. SUBMIT A REPORT OF MAXIMUM AND MINIMUM fl :Q
TENSION ON CONDUCTORS OR TERMINALS, AND SHALL BE PROTECTED FROM VOLTAGES.
A. ALL LABOR FOR THE INSTALLATION OF MATERIALS AND EQUIPMENT FURNISHED FOR MECHANICAL INJURY AND FROM MOISTURE. SHARP BENDS OVER CONDUIT �,�'•, 41 Q
BUSHINGS ARE PROHIBITED. DAMAGED CABLES SHALL BE REMOVED AND 4. PERFORM GROUND TEST TO MEASURE GROUND RESISTANCE OF GROUNDING CENSE,.••�N�:'
Z THE ELECTRICAL SYSTEM SHALL BE DONE BY EXPERIENCED MECHANICS OF THE � •
w PROPER TRADES. REPLACED AT THE CONTRACTOR'S EXPENSE. SYSTEM USING THE IEEE STANDARD 3-POINT "FALL-OF-POTENTIAL" METHOD. SS/ �N,
w DocuSignAd.py.ONAL
w¢ PROVIDE PLOTTED TEST VALUES & LOCATION SKETCH. NOTIFY THE ENGINEER ,•••
<w B. ALL ELECTRICAL EQUIPMENT FURNISHED SHALL BE ADJUSTED, ALIGNED AND C. DISCONNECT SWITCHES: IMMEDIATELY IF MEASURED VALUE IS OVER 5 OHMS. 01/l TESTED BY THE CONTRACTOR AS REQUIRED TO PRODUCE THE INTENDED
PERFORMANCE. 1. INSTALL DISCONNECT SWITCHES LEVEL AND PLUMB. CONNECT TO WIRING END OF SECTION J
SYSTEM AND GROUND AS INDICATED. ENG
C. UPON COMPLETION OF THE WORK, THE CONTRACTOR SHALL THOROUGHLY CLEAN END OF SPECIFICATION STATE OF MONTANA
ALL EXPOSED EQUIPMENT, REMOVE ALL LABELS AND ANY DEBRIS, CRATING OR D. GROUNDING: ENGINEER: PE#: DISCIPLINE:
CARTONS AND LEAVE THE INSTALLATION FINISHED AND READY FOR OPERATION. CG CHRISTOPHERGIANNOTTI 105865PE CIVIL C
1. ALL METALLIC PARTS OF ELECTRICAL EQUIPMENT WHICH DO NOT CARRY SDK SHELTON D.KEISLING 86951PE ELECTRICAL E
w CURRENT SHALL BE GROUNDED IN ACCORDANCE WITH THE REQUIREMENTS OF DJW DAVID J.WALDRON 104827PE ELECTRICAL E
3.3 COORDINATION: TMS TERRANCE M.SUPER 17412PE ELECTRICAL E
a ARTICLE 250 OF THE NATIONAL ELECTRICAL CODE.
o A. THE CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ELECTRICAL ITEMS
g WITH THE OWNER-FURNISHED EQUIPMENT DELIVERY SCHEDULE TO PREVENT 2. PROVIDE ELECTRICAL GROUNDING AND BONDING SYSTEMS INDICATED WITH
3 UNNECESSARY DELAYS IN THE TOTAL WORK. ASSEMBLY OF MATERIALS, INCLUDING GROUNDING ELECTRODES, BONDING
> JUMPERS AND ADDITIONAL ACCESSORIES AS REQUIRED FOR A COMPLETE
3.4 INSTALLATION: INSTALLATION.
' A. CONDUIT. 3. ROUTE GROUNDING CONNECTIONS AND CONDUCTORS TO GROUND IN THE
SHORTEST AND STRAIGHTEST PATHS POSSIBLE TO MINIMIZE TRANSIENT VOLTAGE
1. ALL ELECTRICAL WIRING SHALL BE INSTALLED IN CONDUIT AS HEREIN RISES.
SPECIFIED. NO CONDUIT OR TUBING OF LESS THAN 3/4" NOMINAL SIZE SHALL
z BE USED. 4. TIGHTEN GROUNDING AND BONDING CONNECTORS, INCLUDING SCREWS AND
o BOLTS, IN ACCORDANCE WITH MANUFACTURER'S PUBLISHED TORQUE
2. PROVIDE RGS CONDUIT FOR ALL EXPOSED, EXTERIOR CONDUIT. TIGHTENING VALUES FOR CONNECTORS AND BOLTS. WHERE MANUFACTURER'S
w TORQUING REQUIREMENTS ARE NOT AVAILABLE, TIGHTEN CONNECTIONS TO
a 3. PROVIDE SCHEDULE 40 PVC OR RGS CONDUIT BELOW GRADE, 1" MINIMUM, COMPLY WITH TIGHTENING TORQUE VALUES SPECIFIED IN UL 486A TO ASSURE
UNLESS NOTED OTHERWISE. ALL 90 DEGREE BENDS TO ABOVE GRADE SHALL PERMANENT AND EFFECTIVE GROUNDING.
BE RGS. MINIMUM BURIAL DEPTH SHALL BE 24" CLEAR TO TOP OF CONDUIT,
UNLESS NOTED OTHERWISE. 5. ALL UNDERGROUND GROUNDING CONNECTIONS SHALL BE MADE BY THE PLANS PREPARED FOR.
EXOTHERMIC WELD PROCESS AND INSTALLED IN ACCORDANCE WITH THE
Fill 4. USE GALVANIZED FLEXIBLE STEEL CONDUIT WHERE DIRECT CONNECTION IS NOT MANUFACTURER'S INSTRUCTIONS.
DESIRABLE FOR REASONS OF EQUIPMENT MOVEMENT, VIBRATION, OR FOR EASE ���I�O
OF MAINTENANCE. USE LIQUIDTIGHT, PVC COATED FLEXIBLE METAL CONDUIT6. ALL GROUND CONNECTIONS SHALL BE INSPECTED FOR TIGHTNESS.
FOR OUTDOOR APPLICATIONS. EXOTHERMIC-WELDED CONNECTIONS SHALL BE APPROVED BY THE
CONSTRUCTION INSPECTOR BEFORE BEING PERMANENTLY CONCEALED.
5. INSTALL GALVANIZED FLEXIBLE STEEL CONDUIT AT ALL POINTS OF CONNECTION
TO EQUIPMENT MOUNTED ON SUPPORTS TO ALLOW FOR EXPANSION AND 7. APPLY CORROSION-RESISTANT FINISH TO FIELD CONNECTIONS, AND PLACES PLANS PREPARED B7
CONTRACTION. WHERE FACTORY APPLIED PROTECTIVE COATINGS HAVE BEEN DESTROYED. USE
COPPER-BASED "NO-OX" OR APPROVED EQUAL. -va
6 A RUN OF CONDUIT ORSHALL
THAN THE EQUIVALENT OFEEN FOUROXES QUARTER-I EINDS INCLUDINGTTHOSEAIBEN SRE 8. A SEPARATE, CONTINUOUS, INSULATED EQUIPMENT GROUNDING CONDUCTOR V�hlr
' LOCATED IMMEDIATELY AT THE BOX OR FITTING. THE RADIUS OF BENDS SHALL SHALL BE INSTALLED IN ALL FEEDER AND BRANCH CIRCUITS ��
NEVER BE SHORTER THAN THAT OF THE CORRESPONDING TRADE ELBOW.
9. BOND ALL INSULATED GROUNDING BUSHINGS WITH A BARE #6 AWG DRAWING NOTICE:
7. WHERE CONDUIT HAS TO BE CUT IN THE FIELD, IT SHALL BE CUT SQUARE GROUNDING CONDUCTOR TO A GROUND BUS OR GROUNDING LUG IN THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE
WITH A PIPE CUTTER USING CUTTING KNIVES. ENCLOSURE. PROPERTY OF BBC,INC.AND IS LENT TO THE BORROWER FOR
z THEIR CONFIDENTIAL USE ONLY,AND IN CONSIDERATION OF
w THE LOAN OF THIS DRAWING,THE BORROWER PROMISES AND
8. ALL CONDUITS SHALL BE SWABBED CLEAN BY PULLING AN APPROPRIATE SIZE 10. DIRECT BURIED GROUND CONDUCTORS SHALL BE INSTALLED AT A NOMINAL
AGREES TO RETURN IT UPON REQUEST AND AGREES THAT IT
MANDREL THROUGH THE CONDUIT BEFORE INSTALLATION OF WIRE OR CABLE. DEPTH OF 30" BELOW GRADE, UNLESS NOTED OTHERWISE. WILL NOT BE REPRODUCED,COPIED,LENT OR OTHERWISE
CLEAR ALL BLOCKAGES AND REMOVE BURRS, DIRT, AND DEBRIS. DISPOSED OF DIRECTLY OR INDIRECTLY,NOR USED FOR ANY
11. ALL GROUNDING CONDUCTORS EMBEDDED IN OR PENETRATING CONCRETE PURPOSE OTHER THAN FOR WHICH IT IS FURNISHED.
9. INSTALL PULL STRINGS IN ALL EMPTY CONDUITS. IDENTIFY PULL STRINGS AT SHALL BE INSULATED OR INSTALLED IN PVC CONDUIT. SUBMITTALS:
' EACH END WITH ITS DESTINATION. DESCRIPTION DATE BY REV
12. INSTALL ELECTROLYTIC GROUNDING SYSTEM IN STRICT ACCORDANCE WITH ADDED TOWER OPTIONS 04/04/25 AWD B
10. PROVIDE INSULATED GROUNDING BUSHINGS FOR ALL CONDUITS STUBBED INTO MANUFACTURER'S INSTRUCTIONS. REMOVE SEALING TAPE FROM LEACHING AND REVISED LAT LONG 10/17/25 AWD C
EQUIPMENT ENCLOSURES OR STUBBED OUT FOR FUTURE USE BY OTHERS. BREATHER HOLES. INSTALL PROTECTIVE BOX FLUSH WITH GRADE. REVISED PER CLIENT COMMENTS 11/20/25 JDH D
w 11. CONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL CONDUITS DURING 13. DRIVE GROUND RODS UNTIL TOPS ARE 30" BELOW FINAL GRADE. ISSUED FOR CONSTRUCTION 12/16/25 DSL 0
CONSTRUCTION. TEMPORARY OPENINGS IN THE CONDUIT SYSTEM SHALL BE REVISED LAT LONG 03/18/26 DSL 1
PLUGGED OR CAPPED TO PREVENT ENTRANCE OF MOISTURE OR FOREIGN 14. GROUNDING CONDUCTOR TO EQUIPMENT GROUND LUGS: REISSUED FOR CONSTRUCTION 105/08/261 CAL 2
MATTER. CONTRACTOR SHALL REPLACE ANY CONDUITS CONTAINING FOREIGN
MATERIALS THAT CANNOT BE REMOVED. a. BOLTED TO EQUIPMENT HOUSING WITH STAINLESS STEEL BOLTS AND LOCK APPLICANT SITE NAME:
12. INSTALL 2" ORANGE DETECTABLE TAPE 12" ABOVE ALL UNDERGROUND CONDUIT WASHERS.
' MT8 HERO-A
AND WIRE. b. ALL EQUIPMENT TO BE GROUNDED SHALL BE FREE OF PAINT OR ANY
OTHER MATERIAL COVERING BARE METAL AT THE POINT OF CONNECTION.
13. CONDUITS SHALL BE INSTALLED IN SUCH A MANNER AS TO INSURE AGAINST MDG LOCATION ID:
Z COLLECTION OF TRAPPED CONDENSATION. 3.5 ACCEPTANCE TESTING:
00 B. WIRE AND CABLE: A. PROVIDE PERSONNEL AND EQUIPMENT, MAKE REQUIRED TESTS, AND SUBMIT TEST 5000979700
a , REPORTS UPON COMPLETION OF TESTS.
1. ALL POWER WIRING SHALL BE COLOR CODED AS FOLLOWS: SITEADDRESs:
120/240V 208Y/120V 480Y/277V B. WHEN MATERIAL AND/OR WORKMANSHIP IS FOUND NOT TO COMPLY WITH THE
DESCRIPTION
PHASE BLACK BLACK BROWN SPECIFIED REQUIREMENTS, THE NONCOMPLYING ITEMS SHALL BE REMOVED FROM 106 E OAK ST
' PHASE B RED RED ORANGE THE JOBSITE AND REPLACED WITH ITEMS COMPLYING WITH THE SPECIFIED BOZEMAN,MT 59715
PHASE C BLUE YELLOW REQUIREMENTS PROMPTLY AFTER RECEIPT OF NOTICE OF SUCH NON-COMPLIANCE.
NEUTRAL WHITE WHITE GRAY SHEET DESCRIPTION:-
GROUND GREEN GREEN GREEN
o a SPECIFICATIONS SP-2.1
(4 OF 4)