HomeMy WebLinkAbout012-SP1.0-Specifications Docusign Envelope ID:OB8B83E5-B8B3-4B58-A2DC-E6EFCF2DDOFD STAMP:
GENERAL REQUIREMENTS SECTION 01 10 00
PART 1: GENERAL PART 3: EXECUTION :: p N TA N �2026
1.1 INTENT: 1.2 RELATED WORK: 3.1 SITE CLEARING OPERATIONS:
w A. THESE SPECIFICATIONS AND CONSTRUCTION DRAWINGS DESCRIBE THE WORK TO BE A. FURNISH THE FOLLOWING WORK AS SPECIFIED UNDER CONSTRUCTION DOCUMENTS, A. PROTECTION OF EXISTING TREES, VEGETATION, LANDSCAPING, AND SITE ;' CHRISTOPHER
DONE AND THE MATERIALS TO BE FURNISHED FOR CONSTRUCTION. PLANS ARE BUT COORDINATE WITH OTHER TRADES PRIOR TO BID: IMPROVEMENTS NOT SCHEDULED FOR CLEARING WHICH MIGHT BE DAMAGED BY
NOT TO BE SCALED. CONSTRUCTION ACTIVITIES. GIANNOTTI
B. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BE FULLY EXPLANATORY 1. FLASHING OF OPENING INTO OUTSIDE WALLS. TRIMMING OF EXISTING TREES AND VEGETATION AS RECOMMENDED BY ARBORIST B. '
' AND SUPPLEMENTARY, HOWEVER, SHOULD ANYTHING BE SHOWN, INDICATED OR B '. NO. 105865
SPECIFIED ON ONE AND NOT THE OTHER, IT SHALL BE DONE THE SAME AS IF 2. SEAL AND CAULK ALL OPENINGS. FOR PROTECTION DURING CONSTRUCTION ACTIVITIES. 44,/:
SHOWN, INDICATED OR SPECIFIED IN BOTH. C. CLEARING AND GRUBBING OF STUMPS AND VEGETATION, AND REMOVAL AND
C. THE INTENTION OF DOCUMENTS IS TO INCLUDE ALL LABOR AND MATERIALS 3. PAINTING. CENSE N�•'
z DISPOSAL OF DEBRIS, RUBBISH, DESIGNATED TREES, AND SITE IMPROVEMENTS.
REASONABLY NECESSARY FOR THE PROPER EXECUTION AND COMPLETION OF THE S ••....•• '' C?
�� WORK AS STIPULATED IN THE CONTRACT. 4. CUTTING AND PATCHING. Docusigned.pS�ONAL�N
w� D. TOPSOIL STRIPPING AND STOCKPILING.
w D. CONFLICTS: THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL
MEASUREMENTS AT THE SITE BEFORE ORDERING MATERIALS OR DOING ANY WORK. 1.3 REQUIREMENTS OF REGULATOR AGENCIES: E
NO COMPENSATION SHALL BE ALLOWED DUE TO DIFFERENCES BETWEEN ACTUAL E. TEMPORARY EROSION CONTROL, SILTATION CONTROL, AND DUST CONTROL.
DIMENSIONS AND THOSE ON THE DOCUMENTS. ANY DISCREPANCY SHALL BE A. FURNISH UL LISTED EQUIPMENT WHERE SUCH LABEL IS AVAILABLE, INSTALL IN F. TEMPORARY PROTECTION OF ADJACENT PROPERTY, STRUCTURES, BENCHMARKS, ENG I
REPORTED TO THE OWNER OR THEIR AGENT FOR CONSIDERATION. CONFORMANCE WITH UL STANDARDS WHERE APPLICABLE. AND MONUMENTS. STATE OFMQNTANA
1.2 LICENSING REQUIREMENTS: B. INSTALL ANTENNA, ANTENNA CABLES, AND GROUNDING SYSTEM IN ACCORDANCE ENGINEER: PE#: DISCIPLINE:
WITH DRAWINGS AND SPECIFICATIONS IN EFFECT AT PROJECT LOCATION AND G. WATERING OF TREES AND VEGETATION DURING CONSTRUCTION ACTIVITIES. CG CHRISTOPHERGIANNOTTI 105865PE CIVIL C
A. THE CONTRACTOR IS RESPONSIBLE FOR PROCUREMENT AND MAINTAINING ALL RECOMMENDATIONS OF STATE AND LOCAL BUILDING CODES, AND ANY SPECIAL SDK SHELTON D.KEISLING 86951PE ELECTRICAL E
H. REMOVAL AND LEGAL DISPOSAL OF CLEARED MATERIALS. DJW DAVID J.WALDRON 104827PE ELECTRICAL E
o APPLICABLE LICENSES AND BONDS. CODES HAVING JURISDICTION OVER SPECIFIC PORTIONS OF WORK. THIS INCLUDES TMS TERRANCE M.SUPER 17412PE ELECTR CAL E
o BUT IS NOT LIMITED TO THE FOLLOWING: I. MAINTAIN ALL EXISTING FENCING AND GATES TO MAINTAIN A SECURE SITE AT ALL
Z 1.3 STORAGE: TIMES.
5 1. TIA-222 (TELECOMMUNICATIONS INDUSTRY ASSOCIATION) — STRUCTURAL
N A. ALL MATERIALS MUST BE STORED IN A LEVEL AND DRY FASHION THAT DOES NOT STANDARDS FOR STEEL ANTENNA TOWERS AND ANTENNA SUPPORTING
OBSTRUCT THE FLOW OF OTHER WORK. ANY STORAGE METHOD MUST MEET ALL STRUCTURES. J. PROVIDE AND MAINTAIN ALL TEMPORARY FENCING, BARRICADES, WARNING SIGNALS
RECOMMENDATIONS OF THE ASSOCIATED MANUFACTURER. AND SIMILAR DEVICES NECESSARY TO PROTECT LIFE AND PROPERTY DURING THE
2. FM (FEDERAL AVIATION ADMINISTRATION ADVISORY) — CIRCULAR AC ENTIRE PERIOD OF CONSTRUCTION. REMOVE ALL SUCH DEVICES UPON COMPLETION
OF THE WORK.
1.4 CLEAN UP: 70/7460-1K, OBSTRUCTION MARKING AND LIGHTING. 3.2 CLEARING:
A. THE CONTRACTOR SHALL KEEP THE SITE FREE FROM ACCUMULATION OF WASTE 3. FCC (FEDERAL COMMUNICATIONS COMMISSION) — RULES AND REGULATIONS A. PREVENT DAMAGE TO EXISTING IMPROVEMENTS INDICATED TO REMAIN, INCLUDING
MATERIALS OR RUBBISH AT ALL TIMES. OBSTRUCTION MARKING AND LIGHTING SPECIFICATIONS FOR ANTENNA
o STRUCTURES AND HIGH INTENSITY OBSTRUCTION LIGHTING SPECIFICATIONS FOR ON AND OFF SITE. PROTECT EXISTING TREES AND VEGETATION INDICATED TO
0 1.5 QUALITY ASSURANCE: ANTENNA STRUCTURES. REMAIN. DO NOT STOCKPILE MATERIALS AND RESTRICT TRAFFIC WITHIN DRIP LINE
OF EXISTING TREES TO REMAIN OR THAT INTERFERE WITH ACCESS TO SITE.
w A. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE LOCAL, STATE, AND PROVIDE AND MAINTAIN TEMPORARY GUARDS TO ENCIRCLE TREES OR GROUPS OF
w FEDERAL REGULATIONS. 4. AISC (AMERICAN INSTITUTE OF STEEL CONSTRUCTION) — SPECIFICATION FOR TREES TO REMAIN; OBTAIN APPROVAL BEFORE BEGINNING WORK.
a STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS.
PART 2: PRODUCTS — NOT APPLICABLE TO THIS SECTION B. WATER VEGETATION AS REQUIRED TO MAINTAIN HEALTH. COVER TEMPORARILY
5. NEC (NATIONAL ELECTRICAL CODE) — FOR TOWER LIGHTING KITS. EXPOSED ROOTS WITH WET BURLAP AND BACKFILL AS SOON AS POSSIBLE. COAT PLANS PREPARED FOR:
PART 3: EXECUTION — NOT APPLICABLE TO THIS SECTION 6. UL (UNDERWRITERS LABORATORIES) APPROVED ELECTRICAL PRODUCTS. CUT PLANT SURFACES WITH APPROVED EMULSIFIED ASPHALT PLANT COATING.
� — �
END OF SECTION C. REPAIR . REPLACE VEGETATION DESIGNATED FOR REUSE, WHICH HAS BEEN ���I�O
7. IN ALL CASES, THE FAA RULES AND THE FCC RULES ARE APPLICABLE AND IN DAMAGED. REMOVE HEAVY GROWTHS OF GRASS BEFORE STRIPPING. STOCKPILE
THE EVENT OF CONFLICT, SUPERSEDE ANY OTHER STANDARDS OR SATISFACTORY TOPSOIL CONTAINING NO LARGE STONES, FOREIGN MATTER AND
ry
SPECIFICATIONS. WEEDS ON SITE FOR REUSE.
COMMUNICATIONSfANTENNA'S SECTION 27 00 00 8. LIFE SAFETY CODE NFPA, LATEST EDITION. D. COMPLETELY REMOVE ALL IMPROVEMENTS, STUMPS AND DEBRIS EXCEPT FOR PLANS PREPARED BY:
THOSE INDICATED TO REMAIN. REMOVE BELOW GRADE IMPROVEMENTS AT LEAST 12'
PART 1: GENERAL PART 2: PRODUCTS — NOT APPLICABLE TO THIS SECTION BELOW FINISH GRADE SO AS NOT TO INTERFERE WITH NEW CONSTRUCTION. -•
REMOVE ABANDONED MECHANICAL AND ELECTRICAL WORK AS REQUIRED.1.1 WORK INCLUDED: PART 3: EXECUTION — NOT APPLICABLE TO THIS SECTIONE. PREVENT EROSION AND SILTATION OF STREETS, CATCH BASINS AND PIPING. V�hlr
SC
A. ANTENNA AND FEEDLINE CABLES ARE FURNISHED BY OWNER UNDER SEPARATE END OF SECTION CONTROL WINDBLOWN DUST. REMOVE WASTE MATERIALS AND UNSUITABLE SOIL
CONTRACT. THE CONTRACTOR SHALL ASSIST ANTENNA INSTALLATION CONTRACTOR FROM SITE AND DISPOSE OF IN A LEGAL MANNER.
IN TERMS OF COORDINATION AND SITE ACCESS. ERECTION SUBCONTRACTOR SHALL DRAWING NOTICE:
F. EXCEPT WHERE EXCAVATION TO GREATER DEPTH IS INDICATED, FILL DEPRESSIONS THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE
BE RESPONSIBLE FOR THE PROTECTION OF PERSONNEL AND PROPERTY FROM PROPERTY OF BBC,INC.AND IS LENT TO THE BORROWER FOR
Z HAZARDOUS EXPOSURE TO OVERHEAD DANGER. RESULTING FROM CLEARING, GRUBBING AND DEMOLITION WORK COMPLETELY WITH THEIR CONFIDENTIAL USE ONLY,AND IN CONSIDERATION OF
w SITE CLEARING/EROSION CONTROL SECTION 31 00 00 SUITABLE FILL AND COMPACT AS REQUIRED. THE LOAN OF THIS DRAWING,THE BORROWER PROMISES AND
z AGREES TO RETURN IT UPON REQUEST AND AGREES THAT IT
< B. INSTALL ANTENNAS AS INDICATED ON DRAWINGS AND OWNER SPECIFICATIONS. PART 1 GENERAL WILL NOT BE REPRODUCED,COPIED,LENT OR OTHERWISE
3.3 EROSION CONTROL DISPOSED OF DIRECTLY OR INDIRECTLY,NOR USED FOR ANY
PURPOSE OTHER THAN FOR WHICH IT IS FURNISHED.
C. INSTALL GALVANIZED STEEL ANTENNA MOUNTS AS INDICATED ON DRAWINGS.
1.1 SUMMARY: A. PROVIDE EROSION AND SILTATION CONTROL AS REQUIRED TO MEET ALL LOCAL SUBMITTALS:
' D. INSTALL FURNISHED GALVANIZED STEEL WAVEGUIDE LADDER AS INDICATED ON A. PROVIDE SITE—CLEARING AS REQUIRED TO COMPLETE WORK AS SHOWN ON AND STATE REQUIREMENTS. DESCRIPTION DATE BY REV A
DRAWINGS. CONTRACT DOCUMENTS INCLUDING CLEARING, GRUBBING, STRIPPING, EROSION AND END OF SECTION ADDED TOWER OPTIONS 04/04/25 WD B
SILTATION CONTROL, AND PROTECTION OF LANDSCAPE MATERIALS DESIGNATED TO REVISED LAT LONG 10/17/25 AWD C
E. THE CONTRACTOR SHALL PROVIDE FREQUENCY DOMAIN REFLECTOMETER (FDR) BE PROTECTED DURING CONSTRUCTION. REVISED PER CLIENT COMMENTS 11/20/25 JDH D
TEST RESULTS TO THE CONSTRUCTION MANAGER AND OWNER WITHIN ONE WEEK 1.2 QUALITY ASSURANCE:
ISSUED FOR CONSTRUCTION 12/16/25 DSL 0
OF COMPLETION.
LL A. COMPLY WITH GOVERNING CODES AND REGULATIONS. REVISED LAT LONG o3/18/26 DSL 1
F. INSTALL FEEDLINE CABLES AND TERMINATORS BETWEEN ANTENNAS AND EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS. WEATHERPROOF ALL CONNECTORS B. SITE PROTECTION: PROVIDE ALL NECESSARY JOB SITE MAINTENANCE FROM REISSUED FOR CONSTRUCTION 05/08/26 CALI 2
BETWEEN THE ANTENNA AND EQUIPMENT PER MANUFACTURER'S REQUIREMENTS. COMMENCEMENT OF WORK UNTIL COMPLETION OF THE SUBCONTRACT APPLICANT SITE NAME:
' TERMINATE ALL FEEDLINE CABLE THREE (3) FEET IN EXCESS OF ENTRY PORT LOCATION UNLESS OTHERWISE STATED. C. AVOID DAMAGE TO THE SITE AND TO EXISTING FACILITIES, STRUCTURES, TREES, MT8 HERO-A
AND SHRUBS DESIGNATED TO REMAIN. TAKE PROTECTIVE MEASURES TO PREVENT
G. ANTENNA AND FEEDLINE CABLE GROUNDING: EXISTING FACILITIES THAT ARE NOT DESIGNATED FOR REMOVAL FROM BEING
DAMAGED BY THE WORK. MDG LOCATION ID:
Z 1. ALL FEEDLINE CABLE GROUNDING CONNECTIONS ARE TO BE WEATHER SEALED PART 2: PRODUCTS
w Z WITH ANDREW CONNECTOR/SPLICE WEATHERPROOFING KITS OR APPROVED 5000979700
00 EQUAL. 2.1 MATERIALS-
2. ALL FEEDLINE CABLE GROUNDING KITS ARE TO BE INSTALLED ON STRAIGHT A. TREE PROTECTION, EROSION CONTROL, SILTATION CONTROL, AND DUST CONTROL SITE ADDRESS:
RUNS OF FEEDLINE CABLE (NOT WITHIN BENDS)
MATERIALS SUITABLE FOR SITE CONDITIONS. 106 E OAK ST
BOZEMAN,MT 59715
SHEET DESCRIPTION: SHEET#:
o SPECIFICATIONS
a
(1 OF 4)
.0
U