Loading...
HomeMy WebLinkAbout001-T1-0-Cover Page                                                             SITELOCATION    SITE ADDRESS: THIS DRAWING HAS NOT BEEN PUBLISHED AND IS THE SOLE PROPERTY OF SSC, INC. AND IS LENT TO THE BORROWER FOR THEIR CONFIDENTIAL USE ONLY, AND IN CONSIDERATION OFTHE LOAN OF THIS DRAWING, THE BORROWER PROMISES ANDAGREES TO RETURN IT UPON REQUEST AND AGREES THAT IT WILL NOT BE REPRODUCED, COPIED, LENT OR OTHERWISEDISPOSED OF DIRECTLY OR INDIRECTLY, NOR USED FOR ANYPURPOSE OTHER THAN FOR WHICH IT IS FURNISHED. DRAWING NOTICE: SHEET #:SHEET DESCRIPTION: ENGINEERING LICENSE: STAMP:ASTAMP:STA STATE OF MONTANA ENGINEER: PE#: DISCIPLINE: CG CHRISTOPHER GIANNOTTI 105865 PE CIVIL C SDK SHELTON D. KEISLING 86951PE ELECTRICAL EDJW DAVID J. WALDRON 104827PE ELECTRICAL ETMS TERRANCE M. SUPER 17412PE ELECTRICAL E MDG LOCATION ID: APPLICANT SITE NAME: PLANS PREPARED BY: PLANS PREPARED FOR:      REVDESCRIPTION DATE BY SUBMITTALS: REISSUED FOR CONSTRUCTION 05/08/26 CAL 2 ADDED TOWER OPTIONS 04/04/25 AWD B REVISED LAT LONG 10/17/25 AWD C REVISED PER CLIENT COMMENTS 11/20/25 JDH D ISSUED FOR CONSTRUCTION 12/16/25 DSL 0 REVISED LAT LONG 03/18/26 DSL 1 HYBRID &COAX CABLESPOWER/GROUNDINGFIBER ANTENNAS RRH/BBU PENETRATIONS VZW LANDSPACEACCESS/UTILITYEASEMENTNEW VZWUTILITYEASEMENT                Know what's below.before you dig.Call R               