Loading...
HomeMy WebLinkAbout26 - Submissions - RFP - City Hall Parking Lot (6)From:OHare, Cody To:Bozeman Procurement Subject:[EXTERNAL]RFP: Bozeman City Hall Parking Lot Replacement Date:Thursday, July 9, 2026 1:04:35 PM Attachments:image.png Bozeman City Hall Parking Lot Replacement 2026 Proposal.pdf CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Hello, Please see the attached! Thank you, Cody O’Hare General Manager - Belgrade Knife River Corporation – Mountain West Region Cell: 208.553.8107 July 9, 2026 21730 Frontage Road Belgrade, Montana 59714 O: 406-388-6832 Max Ziegler Facilities Assistant Superintendent 121 N Rouse Ave, Bozeman, MT 59715 Subject: Request for Proposals – City of Bozeman City Hall Parking Lot Replacements 2026 A.) Firm Profile Knife River is a vertically integrated heavy civil contractor delivering end-to-end services from extraction through construction. Our materials capabilities — mining, crushing, screening, washing, grading, stockpiling, and trucking — connect seamlessly with our field operations — excavation, site preparation, mass grading, utilities, demolition, asphalt paving, concrete structures, landfills, and water/sewer pipelines, including pump and lift stations. With over 1 billion tons of rock resources and nearly 6,000 employees across the western U.S., we mobilize the right people, equipment, and expertise to meet production targets and schedule commitments. We prioritize safety, quality, and environmental stewardship through MSHA/OSHA compliance, disciplined training, and QA/QC plans that include materials testing, inspection hold points, and continuous improvement. Our teams align permitting and regulatory requirements with execution stormwater controls (SWPPP), dust and noise mitigation, spill prevention, and reclamation planning — so operations remain compliant and efficient. We leverage modern, well-maintained fleets sized to geology and output, with redundancy to protect critical path activities, and employ rigorous project controls: CPM scheduling, production tracking, quantity verification (including drone surveys where appropriate), and proactive risk management. For scopes we do not self-perform, we engage prequalified subcontractors with proven performance, aligned safety and quality standards, and clear scope integration under our field leadership. We maintain transparent communication with owners, engineers, and stakeholders through regular progress meetings and early issue escalation to safeguard budget and schedule. From driveways to highways, our mission is to build strong neighborhoods and build strong communities, delivering top quality work on time and on budget. B.) Description of Proposed Solution Knife River would set up a parking lot closure on September 14, 2026 on the East parking lot. First activity would be to remove the existing curb stops in the parking lot and stockpile for reuse. After this is complete, Knife River will begin removing the existing parking lot material. Once the parking lot material is removed, Knife River will scarify the existing base, moisture condition the base, and recompact the material. Once drainage is established then Knife River will utilize a ¾” Type B hot mix asphalt and pave three (3) inches compacted in one lift. Once paving activities are completed, the existing curb stops will be replaced, and pavement markings will be installed. This is exact process will be utilized for the West parking lot. July 9, 2026 21730 Frontage Road Belgrade, Montana 59714 O: 406-388-6832 Project Team Cody O’Hare – General Manager Josh Walter – Construction Manager Ira LeSage – Materials Manager Tom Etchart – Project Manager Kurt White – Grade Superintendent Joe Beebout – Paving Superintendent C.) Proposed Schedule IDTask ModeTask Name Duration Start Finish Predecessors1Project Start0 daysMon 9/14/26Mon 9/14/262Project Finish0 daysFri 9/25/26Fri 9/25/26143West Parking Lot5 daysMon 9/14/26Fri 9/18/264Install Parking Lot Closure1 dayMon 9/14/26Mon 9/14/2615Excavate Existing Parking Lot2 daysMon 9/14/26Tue 9/15/2616Scarifiy and Recompact1 dayWed 9/16/26Wed 9/16/2657Pave Parking Lot1 dayThu 9/17/26Thu 9/17/2668Pavement Markings and Reinstall Curb 1 dayFri 9/18/26Fri 9/18/2679East Parking Lot5 daysMon 9/21/26Fri 9/25/2610Install Parking Lot Closure1 dayMon 9/21/26Mon 9/21/26811Excavate Existing Parking Lot2 daysMon 9/21/26Tue 9/22/26812Scarifiy and Recompact1 dayWed 9/23/26Wed 9/23/261113Pave Parking Lot1 dayThu 9/24/26Thu 9/24/261214Pavement Markings and Reinstall Curb 1 dayFri 9/25/26Fri 9/25/26139/149/25TWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSAug 30, '26Sep 6, '26Sep 13, '26Sep 20, '26Sep 27, '26Oct 4, '26Oct 11, '26Oct 18, '26TaskSplitMilestoneSummaryProject SummaryInactive TaskInactive MilestoneInactive SummaryManual TaskDuration-onlyManual Summary RollupManual SummaryStart-onlyFinish-onlyExternal TasksExternal MilestoneDeadlineProgressManual ProgressPage 1Project: Project1Date: Wed 7/8/26West Parking LotEast Parking Lot July 9, 2026 21730 Frontage Road Belgrade, Montana 59714 O: 406-388-6832 D.) Recent and Current Work for the City of Bozeman Current Projects: Oak and Ferguson $647,453 Prime Contractor Asphalt Milling, Earthwork, Gravel, Electrical, Curb and Gutter, Sidewalk and Asphalt Paving North 27th Ave $5,332,520 Prime Contractor Earthwork, Gravel, Storm, Sewer, Water, Electrical, Curb and Gutter, Sidewalk and Asphalt Paving Other Projects: Bozeman Yellowstone International Airport 2024 AIP $11,312,589 Prime Contractor Earthwork, Gravel, Storm, Sewer, Electrical and Asphalt Paving MDT Rocky Canyon – I-90 $16,646,688.00 Prime Contractor Asphalt Milling, Asphalt Paving, Bridge Deck Repair, Guardrail, Signs, Chip Seal, Striping 2023 C.O.B. Street Improvements $1,793,818 Prime Contractor Asphalt Milling, Earthwork, Gravel, Curb and Gutter, Sidewalk and Asphalt Paving Bozeman Yellowstone International Airport 2023 AIP Prime Contractor $13,564,114.90 Earthwork, Gravel, Storm, Sewer, Electrical and Asphalt Paving West Post Subdivision 2022-2024 - $9,304,665.29 Subcontractor Earthwork, Gravel, Asphalt Paving, Curb and Gutter Concrete Flatwork Pogreba Field 2023 – Three Forks Airport - $5,013,102.74 Prime Contractor Earthwork, Gravel, Asphalt Paving, Electrical Bozeman – East $7,436,394.76 Prime Contractor Milling, Asphalt Paving Bozeman Yellowstone International Airport 2022 Prime Contractor Commercial Apron Expansion - $6,407,168.50 Earthwork, Gravel, Storm, Sewer, Electrical and Asphalt Paving July 9, 2026 21730 Frontage Road Belgrade, Montana 59714 O: 406-388-6832 Bozeman Yellowstone International Airport 2022 – Rental Lots Prime Contractor $2,402,882.29 Earthwork, Gravel, Asphalt Paving and Electrical Bozeman Yellowstone International Airport 2021 – Northside Prime Contractor Apron Expansion - $4,324,631.86 Earthwork, Gravel, Storm, Electrical and Asphalt Paving Bozeman Yellowstone International Airport 2021 Prime Contractor Wings Way Re-Alignment - $689,076.45 Earthwork, Gravel, Electrical and Asphalt Paving Bozeman Yellowstone International Airport 2018 Prime Contractor Runway 12-30 Rehabilitation - $4,537,769.58 Asphalt Paving / Paving Fabric / Electrical Bozeman Yellowstone International Airport 2017 Prime Contractor Taxiway Pavement Rehabilitation - $2,172,690.50 Asphalt Paving / Paving Fabric Bozeman Yellowstone International Airport 2016 Prime Contractor $4,572,290.21 Taxiway Pavement, Signage and Lighting Rehabilitation Taxiway Reconstruction, Asphalt overlay and Taxiway lighting/signing upgrades East Belgrade Interchange – 2013 - $16,603,720.00 Prime Contractor Road Construction including grading, gravel, paving, concrete paving, three new bridges, retaining walls, storm drainage, concrete sidewalks and curb and gutter, fencing, signing, seeding, electrical, striping. Bozeman Yellowstone International Airport Prime Contractor 2014 Access Roads - $4,084,775.91 Road Construction including grading, gravel, paving, storm drainage, concrete sidewalks, curb and gutter, signing, electrical, striping. Mission Field Airport Improvements - $2,765,970.74 Prime Contractor Runway & Apron Improvements including electrical, sealing and striping July 9, 2026 21730 Frontage Road Belgrade, Montana 59714 O: 406-388-6832 E.) References City of Bozeman, Engineering Department, P.O. Box 640, Bozeman, Montana 59771 Gallatin Airport Authority, 850 Gallatin Field Road, Suite #6, Belgrade, Montana 59714 Montana Department of Transportation, Bozeman Division, P.O. Box 1110, Bozeman, Montana 59715 Gallatin County Road and Bridge Department, 205 West Baxter Lane, Bozeman, Montana 59718 F.) Price Proposal BOZEMAN CITY HALL PARKING LOT REPLACEMENT BELGRADE, MT 59714 21730 FRONTAGE ROAD KNIFE RIVER - BELGRADE CODY O'HARE 208-553-8107 Contact: Phone: E-mail: Job Name:Quote To:Max Ziegler BOZEMAN CITY HALL PARKING LOT REPLACEMENT 7/9/2026Bid Date:Facilities Assistant Superintendent Date of Plans:121 N Rouse Ave, Bozeman, MT 59715 Phone:Revision Date: E-mail:Addenda: KNIFE RIVER IS PLEASED TO OFFER THE FOLLOWING UNIT PRICES FOR THE REFERENCED PROJECT. AMOUNTITEM DESCRIPTION QUANTITY UNIT UNIT PRICE MOBILIZATION LS1.00 10 12,500.00 12,500.00 TRAFFIC CONTROL LS1.00 20 1,070.00 1,070.00 GRADING SF21,345.00 30 2.05 43,757.25 PAVING SF21,345.00 40 2.80 59,766.00 PAVEMENT MARKINGS LS1.00 50 5,000.00 5,000.00 GRAND TOTAL $122,093.25 NOTES: *WORK EXCLUDED: PERMITS, DEWATERING, COLD WEATHER PROTECTION, TRAFFIC/DUST CONTROL, SWPPP, SURVEY, UNDERGROUND. *GRAVEL BASE SHALL BE TRUE TO LINE, GRADE AND COMPACTION BEFORE BEGINNING WORK. *SUBGRADE / GRAVEL BASE SHALL BE TRUE TO LINE GRADE AND COMPACTION BEFORE BEGINNING WORK. *SIDEWALK SUBGRADE SHALL BE CUT/FILLED +/- A TENTH. *PRICES QUOTED ASSUME WORK TO OCCUR DURING THE 2019 CONSTRUCTION SEASON. *PRICING VALID FOR 30 DAYS FROM DATE OF QUOTE. *ANY INCENTIVE/DISINCENTIVE ON KNIFE RIVER'S WORK IS TO BE APPLIED TO KNIFE RIVER'S PAYMENT BASED ON OUR BID PRICE TO YOU. ANY INCENTIVE/DISINCENTIVE ON YOUR MARKUP TO OUR PRICE WILL BE YOURS. *ANY ITEM OF WORK NOT SPECIFICALLY DESCRIBED ABOVE IS EXCLUDED. *COLORED CONCRETE QUOTED ASSUMES COLOR TO BE BRICK RED. OTHER COLORS AVAILABLE BUT MAY CAUSE PRICE CHANGE. THIS ESTIMATE IS BASED ON GRAVEL BEING TRUE TO LINE, GRADE, AND COMPACTION PRIOR TO INITIATING WORK. SCHEDULING WORK IS SUBJECT TO WEATHER, CREW AVAILABILITY, AND ADVANCED Page 1 of 2 July 9, 2026 21730 Frontage Road Belgrade, Montana 59714 O: 406-388-6832 G.) Affirmation of Nondiscrimination and Equal Pay (See Appendix A) KW KURT WHITE KNIFE RIVER - SUPERINTENDENT| KURT.WHITE@KNIFERIVER.NET 406-388-6832 EXPERIENCE GRADING/GRAVEL/CONCRETE SUPERINTEDENT • KNIFE RIVER - BELGRADE• 8/1/17 – CURRENT FOREMAN • KNIFE RIVER - BELGRADE• 8/1/2005 – 8/1/2017 PROJECTS NORTH 27TH AVENUE IMPROVEMENTS – BOB MURRAY 406-582-2269 CONSTRUCTION OF N 27th AVE – BAXTER TO CATTAIL City of Bozeman 20 E Olive Street, Bozeman, MT 59715 MONTANA STATE UNIVERSITY STADIUM EXPANSION PARKING LOT RE-CONSTRUCTION AND EXPANSION OF BOBCAT STADIUM PARKING LOTS DJ&A 220 W Lamme Street 1D, Bozeman, MT 59718 BOZEMAN AIPRORT 2024 AIP - MARK MAIERLE 406-570-9730 CONSTRUCTION OF NEW TAXIWAY B AND EXTENSION OF MAIN RUNWAY 11-29 Morrison Maierle 2880 Technology Boulevard, Bozeman, MT 59718 BOZEMAN AIRPORT 2023 AIP – MARK MAIERLE 406-570-9730 APRON EXPANSIONS/ASPHALT OVERLAYS & CONSTRUCTION OF TWO NEW PARALLEL TAXIWAYS Morrison Maierle 2880 Technology Boulevard, Bozeman, MT 59718 BOZEMAN AIPRORT 2023 PARKING LOT IMP – MARK MAIERLE 406-570-9730 CONSTRUCTION AND EXPANSION OF RENTAL CAR PARKING LOTS Morrison Maierle 2880 Technology Boulevard, Bozeman, MT 59718 WINGS WAY REALIGNMENT – MARK MAIERLE 406-570-9430 FULL ROAD RECONSTRUCT W/ RE-ALIGNMENT Morrison Maierle 2880 Technology Boulevard, Bozeman, MT 59718 2021 BOZEMAN YELLOWSTONE INT’L AIRPORT NORTHSIDE APRON IMPROVEMENTS – MARK MAIERLE 406-570-9430 CONSTRUCTION OF NEW APRON AND SERVICE ROADS Morrison Maierle 2880 Technology Boulevard, Bozeman, MT 59718 2022 BOZEMAN YELLOWSTONE INT’L AIRPORT COMMERICAL APRON EXPANSION – MARK MAIERLE 406-570-9730 OVERLAY OF EXISTING COMMERCIAL APRON AND CONSTRUCTION OF NEW APRON AND SERVICE ROAD Morrison Maierle 2880 Technology Boulevard, Bozeman, MT 59718 S. 3RD/GRAF ROUNDABOUT – DANIELLE SHARF 406-922-4325 CONSTUCTION OF NEW ROUNDABOUT Sanderson Stewart 106 E. Babcock Suite 1L, Bozeman, MT 59715 ASPEN STREET – 7TH TO 5TH – DANIELLE SHARF 406-922-4325 COMPLETE ROAD RE-CONSTRUCTION Sanderson Stewart 106 E. Babcock Suite 1L, Bozeman, MT 59715 ROUSE AVE - NORTH – CRAIG WALKER 406-556-4700 MDT - 100 Nelson Road, Bozeman, MT 59715 TAMARACK STREET IMPRROVEMENTS - SHANE STRONG 406-823-9462 FULL ROAD RECONSTUCTION KLJ - 1982 Stadium Drive, Suite 3, Bozeman, MT 59715 STUCKY ROUNDABOUT – PAUL COGLEY 406-556-4700 NEW ROUNDABOUT CONSTRUCTION MDT - 100 Nelson Road, Bozeman, MT 59715 BAXTER LANE – DAVIS TO 19TH – STACI VENNER 406-580-4438 FULL ROAD RECONSTRUCTION RPA – 3810 Valley Commons, Suite 4, Bozeman, MT 59718 NELSON MEADOWS SUBDIVISION – MATT EKSTROM 406-587-0721 NEW SUBDIVISION CONSTRUCTION Morrison Maierle 2880 Technology Boulevard, Bozeman, MT 59718 JB JOE BEEBOUT KNIFE RIVER - SUPERINTENDENT| JOSEPH.BEEBOUT@KNIFERIVER.NET 406-388-6832 EXPERIENCE ASPHALT PAVING SUPERINTEDENT • KNIFE RIVER - BELGRADE• 2024 - CURRENT GRADING/GRAVEL FOREMAN • KNIFE RIVER - BELGRADE• 2016 - 2023 PROJECTS GALLATIN COUNTY RURAL IMPROVEMENT DISTRICT PAVING ASPHALT OVERLAY OF EXISTING SUBDIVISIONS Morrison Maierle 2880 Technology Boulevard, Bozeman, MT 59718 Jack Schunke – 406-587-0721 GALLATIN COUNTY LEVELING COURSE AND OVERLAY ASPHALT OVERLAY OF EXISTING ROADS Morrison Maierle 2880 Technology Boulevard, Bozeman, MT 59718 Levi Ewan – 406-582-3250 ROCKY CANYON I-90 OVERLAY ASPHALT MILL AND OVERLAY OF I-90 FROM BEAR CANYON TO JACKSON CREEK Montana Department of Transportation 786 Nelson Road, Bozeman, MT 59718 Chad Mozol 406-556-4700 BOZEMAN AIPRORT 2024 AIP CONSTRUCTION OF NEW TAXIWAY B AND EXTENSION OF MAIN RUNWAY 11-29 Morrison Maierle 2880 Technology Boulevard, Bozeman, MT 59718 Mark Maierle 406-570-9730 2 MONTANA STATE UNIVERSITY STADIUM EXPANSION PARKING LOT RE-CONSTRUCTION AND EXPANSION OF BOBCAT STADIUM PARKING LOTS DJ&A 220 W Lamme Street 1D, Bozeman, MT 59718 BOZEMAN AIPRORT 2023 PARKING LOT IMP – MARK MAIERLE 406-570-9730 CONSTRUCTION AND EXPANSION OF RENTAL CAR PARKING LOTS Morrison Maierle 2880 Technology Boulevard, Bozeman, MT 59718 Mark Maierle 406-570-9730