HomeMy WebLinkAbout26 - Submissions - RFP - City Hall Parking Lot (6)From:OHare, Cody
To:Bozeman Procurement
Subject:[EXTERNAL]RFP: Bozeman City Hall Parking Lot Replacement
Date:Thursday, July 9, 2026 1:04:35 PM
Attachments:image.png
Bozeman City Hall Parking Lot Replacement 2026 Proposal.pdf
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
Hello,
Please see the attached!
Thank you,
Cody O’Hare
General Manager - Belgrade
Knife River Corporation – Mountain West Region
Cell: 208.553.8107
July 9, 2026
21730 Frontage Road
Belgrade, Montana 59714
O: 406-388-6832
Max Ziegler
Facilities Assistant Superintendent
121 N Rouse Ave,
Bozeman, MT 59715
Subject: Request for Proposals – City of Bozeman City Hall Parking Lot Replacements 2026
A.) Firm Profile
Knife River is a vertically integrated heavy civil contractor delivering end-to-end services from extraction
through construction. Our materials capabilities — mining, crushing, screening, washing, grading,
stockpiling, and trucking — connect seamlessly with our field operations — excavation, site preparation,
mass grading, utilities, demolition, asphalt paving, concrete structures, landfills, and water/sewer
pipelines, including pump and lift stations. With over 1 billion tons of rock resources and nearly 6,000
employees across the western U.S., we mobilize the right people, equipment, and expertise to meet
production targets and schedule commitments.
We prioritize safety, quality, and environmental stewardship through MSHA/OSHA compliance,
disciplined training, and QA/QC plans that include materials testing, inspection hold points, and
continuous improvement. Our teams align permitting and regulatory requirements with execution
stormwater controls (SWPPP), dust and noise mitigation, spill prevention, and reclamation planning —
so operations remain compliant and efficient. We leverage modern, well-maintained fleets sized to
geology and output, with redundancy to protect critical path activities, and employ rigorous project
controls: CPM scheduling, production tracking, quantity verification (including drone surveys where
appropriate), and proactive risk management.
For scopes we do not self-perform, we engage prequalified subcontractors with proven performance,
aligned safety and quality standards, and clear scope integration under our field leadership. We
maintain transparent communication with owners, engineers, and stakeholders through regular
progress meetings and early issue escalation to safeguard budget and schedule. From driveways to
highways, our mission is to build strong neighborhoods and build strong communities, delivering top
quality work on time and on budget.
B.) Description of Proposed Solution
Knife River would set up a parking lot closure on September 14, 2026 on the East parking lot. First
activity would be to remove the existing curb stops in the parking lot and stockpile for reuse. After this is
complete, Knife River will begin removing the existing parking lot material. Once the parking lot material
is removed, Knife River will scarify the existing base, moisture condition the base, and recompact the
material. Once drainage is established then Knife River will utilize a ¾” Type B hot mix asphalt and pave
three (3) inches compacted in one lift. Once paving activities are completed, the existing curb stops will
be replaced, and pavement markings will be installed. This is exact process will be utilized for the West
parking lot.
July 9, 2026
21730 Frontage Road
Belgrade, Montana 59714
O: 406-388-6832
Project Team
Cody O’Hare – General Manager
Josh Walter – Construction Manager
Ira LeSage – Materials Manager
Tom Etchart – Project Manager
Kurt White – Grade Superintendent
Joe Beebout – Paving Superintendent
C.) Proposed Schedule
IDTask ModeTask Name Duration Start Finish Predecessors1Project Start0 daysMon 9/14/26Mon 9/14/262Project Finish0 daysFri 9/25/26Fri 9/25/26143West Parking Lot5 daysMon 9/14/26Fri 9/18/264Install Parking Lot Closure1 dayMon 9/14/26Mon 9/14/2615Excavate Existing Parking Lot2 daysMon 9/14/26Tue 9/15/2616Scarifiy and Recompact1 dayWed 9/16/26Wed 9/16/2657Pave Parking Lot1 dayThu 9/17/26Thu 9/17/2668Pavement Markings and Reinstall Curb 1 dayFri 9/18/26Fri 9/18/2679East Parking Lot5 daysMon 9/21/26Fri 9/25/2610Install Parking Lot Closure1 dayMon 9/21/26Mon 9/21/26811Excavate Existing Parking Lot2 daysMon 9/21/26Tue 9/22/26812Scarifiy and Recompact1 dayWed 9/23/26Wed 9/23/261113Pave Parking Lot1 dayThu 9/24/26Thu 9/24/261214Pavement Markings and Reinstall Curb 1 dayFri 9/25/26Fri 9/25/26139/149/25TWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSMTWTFSSAug 30, '26Sep 6, '26Sep 13, '26Sep 20, '26Sep 27, '26Oct 4, '26Oct 11, '26Oct 18, '26TaskSplitMilestoneSummaryProject SummaryInactive TaskInactive MilestoneInactive SummaryManual TaskDuration-onlyManual Summary RollupManual SummaryStart-onlyFinish-onlyExternal TasksExternal MilestoneDeadlineProgressManual ProgressPage 1Project: Project1Date: Wed 7/8/26West Parking LotEast Parking Lot
July 9, 2026
21730 Frontage Road
Belgrade, Montana 59714
O: 406-388-6832
D.) Recent and Current Work for the City of Bozeman
Current Projects:
Oak and Ferguson $647,453 Prime Contractor
Asphalt Milling, Earthwork, Gravel, Electrical, Curb and Gutter, Sidewalk and
Asphalt Paving
North 27th Ave $5,332,520 Prime Contractor
Earthwork, Gravel, Storm, Sewer, Water, Electrical, Curb and Gutter, Sidewalk and
Asphalt Paving
Other Projects:
Bozeman Yellowstone International Airport 2024 AIP $11,312,589 Prime Contractor
Earthwork, Gravel, Storm, Sewer, Electrical and
Asphalt Paving
MDT Rocky Canyon – I-90 $16,646,688.00 Prime Contractor
Asphalt Milling, Asphalt Paving, Bridge Deck Repair, Guardrail, Signs, Chip Seal, Striping
2023 C.O.B. Street Improvements $1,793,818 Prime Contractor
Asphalt Milling, Earthwork, Gravel, Curb and Gutter, Sidewalk and
Asphalt Paving
Bozeman Yellowstone International Airport 2023 AIP Prime Contractor
$13,564,114.90
Earthwork, Gravel, Storm, Sewer, Electrical and
Asphalt Paving
West Post Subdivision 2022-2024 - $9,304,665.29 Subcontractor
Earthwork, Gravel, Asphalt Paving, Curb and Gutter
Concrete Flatwork
Pogreba Field 2023 – Three Forks Airport - $5,013,102.74 Prime Contractor
Earthwork, Gravel, Asphalt Paving, Electrical
Bozeman – East $7,436,394.76 Prime Contractor
Milling, Asphalt Paving
Bozeman Yellowstone International Airport 2022 Prime Contractor
Commercial Apron Expansion - $6,407,168.50
Earthwork, Gravel, Storm, Sewer, Electrical and Asphalt Paving
July 9, 2026
21730 Frontage Road
Belgrade, Montana 59714
O: 406-388-6832
Bozeman Yellowstone International Airport 2022 – Rental Lots Prime Contractor
$2,402,882.29
Earthwork, Gravel, Asphalt Paving and Electrical
Bozeman Yellowstone International Airport 2021 – Northside Prime Contractor
Apron Expansion - $4,324,631.86
Earthwork, Gravel, Storm, Electrical and Asphalt Paving
Bozeman Yellowstone International Airport 2021 Prime Contractor
Wings Way Re-Alignment - $689,076.45
Earthwork, Gravel, Electrical and Asphalt Paving
Bozeman Yellowstone International Airport 2018 Prime Contractor
Runway 12-30 Rehabilitation - $4,537,769.58
Asphalt Paving / Paving Fabric / Electrical
Bozeman Yellowstone International Airport 2017 Prime Contractor
Taxiway Pavement Rehabilitation - $2,172,690.50
Asphalt Paving / Paving Fabric
Bozeman Yellowstone International Airport 2016 Prime Contractor
$4,572,290.21
Taxiway Pavement, Signage and Lighting Rehabilitation
Taxiway Reconstruction, Asphalt overlay and Taxiway
lighting/signing upgrades
East Belgrade Interchange – 2013 - $16,603,720.00 Prime Contractor
Road Construction including grading, gravel, paving,
concrete paving, three new bridges, retaining walls,
storm drainage, concrete sidewalks and curb and gutter,
fencing, signing, seeding, electrical, striping.
Bozeman Yellowstone International Airport Prime Contractor
2014 Access Roads - $4,084,775.91
Road Construction including grading, gravel, paving,
storm drainage, concrete sidewalks, curb and gutter,
signing, electrical, striping.
Mission Field Airport Improvements - $2,765,970.74 Prime Contractor
Runway & Apron Improvements including electrical,
sealing and striping
July 9, 2026
21730 Frontage Road
Belgrade, Montana 59714
O: 406-388-6832
E.) References
City of Bozeman, Engineering Department, P.O. Box 640, Bozeman, Montana 59771
Gallatin Airport Authority, 850 Gallatin Field Road, Suite #6, Belgrade, Montana 59714
Montana Department of Transportation, Bozeman Division, P.O. Box 1110, Bozeman, Montana
59715
Gallatin County Road and Bridge Department, 205 West Baxter Lane, Bozeman, Montana 59718
F.) Price Proposal
BOZEMAN CITY HALL PARKING LOT REPLACEMENT
BELGRADE, MT 59714
21730 FRONTAGE ROAD
KNIFE RIVER - BELGRADE
CODY O'HARE
208-553-8107
Contact:
Phone:
E-mail:
Job Name:Quote To:Max Ziegler BOZEMAN CITY HALL PARKING LOT REPLACEMENT
7/9/2026Bid Date:Facilities Assistant Superintendent
Date of Plans:121 N Rouse Ave, Bozeman, MT 59715
Phone:Revision Date:
E-mail:Addenda:
KNIFE RIVER IS PLEASED TO OFFER THE FOLLOWING
UNIT PRICES FOR THE REFERENCED PROJECT.
AMOUNTITEM DESCRIPTION QUANTITY UNIT UNIT PRICE
MOBILIZATION LS1.00 10 12,500.00 12,500.00
TRAFFIC CONTROL LS1.00 20 1,070.00 1,070.00
GRADING SF21,345.00 30 2.05 43,757.25
PAVING SF21,345.00 40 2.80 59,766.00
PAVEMENT MARKINGS LS1.00 50 5,000.00 5,000.00
GRAND TOTAL $122,093.25
NOTES:
*WORK EXCLUDED: PERMITS, DEWATERING, COLD WEATHER PROTECTION, TRAFFIC/DUST CONTROL,
SWPPP, SURVEY, UNDERGROUND.
*GRAVEL BASE SHALL BE TRUE TO LINE, GRADE AND COMPACTION BEFORE BEGINNING WORK.
*SUBGRADE / GRAVEL BASE SHALL BE TRUE TO LINE GRADE AND COMPACTION BEFORE BEGINNING
WORK.
*SIDEWALK SUBGRADE SHALL BE CUT/FILLED +/- A TENTH.
*PRICES QUOTED ASSUME WORK TO OCCUR DURING THE 2019 CONSTRUCTION SEASON.
*PRICING VALID FOR 30 DAYS FROM DATE OF QUOTE.
*ANY INCENTIVE/DISINCENTIVE ON KNIFE RIVER'S WORK IS TO BE APPLIED TO KNIFE RIVER'S PAYMENT
BASED ON OUR BID PRICE TO YOU. ANY INCENTIVE/DISINCENTIVE ON YOUR MARKUP TO OUR PRICE WILL
BE YOURS.
*ANY ITEM OF WORK NOT SPECIFICALLY DESCRIBED ABOVE IS EXCLUDED.
*COLORED CONCRETE QUOTED ASSUMES COLOR TO BE BRICK RED. OTHER COLORS AVAILABLE BUT MAY
CAUSE PRICE CHANGE.
THIS ESTIMATE IS BASED ON GRAVEL BEING TRUE TO LINE, GRADE, AND COMPACTION PRIOR TO
INITIATING WORK. SCHEDULING WORK IS SUBJECT TO WEATHER, CREW AVAILABILITY, AND ADVANCED
Page 1 of 2
July 9, 2026
21730 Frontage Road
Belgrade, Montana 59714
O: 406-388-6832
G.) Affirmation of Nondiscrimination and Equal Pay (See Appendix A)
KW
KURT WHITE
KNIFE RIVER - SUPERINTENDENT| KURT.WHITE@KNIFERIVER.NET
406-388-6832
EXPERIENCE
GRADING/GRAVEL/CONCRETE SUPERINTEDENT • KNIFE RIVER - BELGRADE•
8/1/17 – CURRENT
FOREMAN • KNIFE RIVER - BELGRADE• 8/1/2005 – 8/1/2017
PROJECTS
NORTH 27TH AVENUE IMPROVEMENTS – BOB MURRAY 406-582-2269
CONSTRUCTION OF N 27th AVE – BAXTER TO CATTAIL
City of Bozeman 20 E Olive Street, Bozeman, MT 59715
MONTANA STATE UNIVERSITY STADIUM EXPANSION PARKING LOT
RE-CONSTRUCTION AND EXPANSION OF BOBCAT STADIUM PARKING
LOTS
DJ&A 220 W Lamme Street 1D, Bozeman, MT 59718
BOZEMAN AIPRORT 2024 AIP - MARK MAIERLE 406-570-9730
CONSTRUCTION OF NEW TAXIWAY B AND EXTENSION OF MAIN
RUNWAY 11-29
Morrison Maierle 2880 Technology Boulevard, Bozeman, MT 59718
BOZEMAN AIRPORT 2023 AIP – MARK MAIERLE 406-570-9730
APRON EXPANSIONS/ASPHALT OVERLAYS & CONSTRUCTION OF TWO
NEW PARALLEL TAXIWAYS
Morrison Maierle 2880 Technology Boulevard, Bozeman, MT 59718
BOZEMAN AIPRORT 2023 PARKING LOT IMP – MARK MAIERLE 406-570-9730
CONSTRUCTION AND EXPANSION OF RENTAL CAR PARKING LOTS
Morrison Maierle 2880 Technology Boulevard, Bozeman, MT 59718
WINGS WAY REALIGNMENT – MARK MAIERLE 406-570-9430
FULL ROAD RECONSTRUCT W/ RE-ALIGNMENT
Morrison Maierle 2880 Technology Boulevard, Bozeman, MT 59718
2021 BOZEMAN YELLOWSTONE INT’L AIRPORT NORTHSIDE APRON
IMPROVEMENTS – MARK MAIERLE 406-570-9430
CONSTRUCTION OF NEW APRON AND SERVICE ROADS
Morrison Maierle 2880 Technology Boulevard, Bozeman, MT 59718
2022 BOZEMAN YELLOWSTONE INT’L AIRPORT COMMERICAL APRON
EXPANSION – MARK MAIERLE 406-570-9730
OVERLAY OF EXISTING COMMERCIAL APRON AND CONSTRUCTION OF
NEW APRON AND SERVICE ROAD
Morrison Maierle 2880 Technology Boulevard, Bozeman, MT 59718
S. 3RD/GRAF ROUNDABOUT – DANIELLE SHARF 406-922-4325
CONSTUCTION OF NEW ROUNDABOUT
Sanderson Stewart 106 E. Babcock Suite 1L, Bozeman, MT 59715
ASPEN STREET – 7TH TO 5TH – DANIELLE SHARF 406-922-4325
COMPLETE ROAD RE-CONSTRUCTION
Sanderson Stewart 106 E. Babcock Suite 1L, Bozeman, MT 59715
ROUSE AVE - NORTH – CRAIG WALKER 406-556-4700
MDT - 100 Nelson Road, Bozeman, MT 59715
TAMARACK STREET IMPRROVEMENTS - SHANE STRONG 406-823-9462
FULL ROAD RECONSTUCTION
KLJ - 1982 Stadium Drive, Suite 3, Bozeman, MT 59715
STUCKY ROUNDABOUT – PAUL COGLEY 406-556-4700
NEW ROUNDABOUT CONSTRUCTION
MDT - 100 Nelson Road, Bozeman, MT 59715
BAXTER LANE – DAVIS TO 19TH – STACI VENNER 406-580-4438
FULL ROAD RECONSTRUCTION
RPA – 3810 Valley Commons, Suite 4, Bozeman, MT 59718
NELSON MEADOWS SUBDIVISION – MATT EKSTROM 406-587-0721
NEW SUBDIVISION CONSTRUCTION
Morrison Maierle 2880 Technology Boulevard, Bozeman, MT 59718
JB
JOE BEEBOUT
KNIFE RIVER - SUPERINTENDENT| JOSEPH.BEEBOUT@KNIFERIVER.NET
406-388-6832
EXPERIENCE
ASPHALT PAVING SUPERINTEDENT • KNIFE RIVER - BELGRADE• 2024 -
CURRENT
GRADING/GRAVEL FOREMAN • KNIFE RIVER - BELGRADE• 2016 - 2023
PROJECTS
GALLATIN COUNTY RURAL IMPROVEMENT DISTRICT PAVING
ASPHALT OVERLAY OF EXISTING SUBDIVISIONS
Morrison Maierle 2880 Technology Boulevard, Bozeman, MT 59718
Jack Schunke – 406-587-0721
GALLATIN COUNTY LEVELING COURSE AND OVERLAY
ASPHALT OVERLAY OF EXISTING ROADS
Morrison Maierle 2880 Technology Boulevard, Bozeman, MT 59718
Levi Ewan – 406-582-3250
ROCKY CANYON I-90 OVERLAY
ASPHALT MILL AND OVERLAY OF I-90 FROM BEAR CANYON TO JACKSON
CREEK
Montana Department of Transportation 786 Nelson Road, Bozeman, MT
59718
Chad Mozol 406-556-4700
BOZEMAN AIPRORT 2024 AIP
CONSTRUCTION OF NEW TAXIWAY B AND EXTENSION OF MAIN
RUNWAY 11-29
Morrison Maierle 2880 Technology Boulevard, Bozeman, MT 59718
Mark Maierle 406-570-9730
2
MONTANA STATE UNIVERSITY STADIUM EXPANSION PARKING LOT
RE-CONSTRUCTION AND EXPANSION OF BOBCAT STADIUM PARKING
LOTS
DJ&A 220 W Lamme Street 1D, Bozeman, MT 59718
BOZEMAN AIPRORT 2023 PARKING LOT IMP – MARK MAIERLE 406-570-9730
CONSTRUCTION AND EXPANSION OF RENTAL CAR PARKING LOTS
Morrison Maierle 2880 Technology Boulevard, Bozeman, MT 59718
Mark Maierle 406-570-9730