HomeMy WebLinkAbout07-13-26 Public Comment - K. VanDeWalle - Bozeman Creek Vision PlanFrom:Ken VanDeWalle
To:Bozeman Public Comment
Subject:[EXTERNAL]Bozeman Creek Vision Plan
Date:Monday, July 13, 2026 2:08:40 PM
Attachments:City Commission Meeting - Bozeman Creek Vision Plan 7.14.2026.pdf
Bozeman Creek Vision Plan Recommendations.pdf
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
Hi,
Please forward this email and documents to the Bozeman City Commissioners and JimHenderson prior to the City Commission Meeting Tuesday, July 14.
Also, please forward the same email and documents to the Bozeman Downtown Improvement
District Board Members prior to the meeting on Wednesday, July 15th.
Thank you,
Ken VanDeWalle
408 North Plum Avenue
Bozeman, MT 59715
406.581.6149
July 13, 2026
Bozeman City Commission
121 North Rouse Avenue
Bozeman, MT 59715
Re: Comments for the July 14, 2026 Work Session – Bozeman Creek Vision Plan
Dear Mayor Morrison and Commissioners,
Thank you for the opportunity to comment on the Bozeman Creek Vision Plan. After reviewing the Vision Plan
materials and the 2025 Bozeman Creek Flood Mitigation and Reclamation Preliminary Engineering
Report, I support the City's goals of improving flood resilience, ecological health, public access, and
community connectivity.
The Preliminary Engineering Report concludes that Bozeman Creek is an interconnected system with multiple
hydraulic constraints and recognizes that hybrid combinations of alternatives may provide the preferred
long-term solution through phased implementation and continued public involvement.
With that in mind, I respectfully offer the following comments in response to the Commission's discussion
questions.
1. Feedback on the proposed recommendations
My primary recommendation is:
Use Existing Public Assets First.
Before constructing new infrastructure or impacting additional private properties, I encourage the City to fully
evaluate how existing public assets can help achieve the Vision Plan's goals.
I also encourage the Commission to direct staff to evaluate a hybrid approach that combines the strongest
elements of multiple alternatives rather than selecting a single concept.
Projects worthy of additional evaluation include:
● Expanding the flood mitigation and ecological benefits of the Indreland Audubon Wetland Preserve
and other existing wetlands identified in the engineering report.
● Creating additional pocket wetlands and green infrastructure on publicly owned property.
● Evaluating whether the existing historic railroad berm at the Indreland Preserve could provide a more
efficient and less impactful location for a universally accessible crossing than constructing a new bridge
and spur trail between Wallace and Rouse Streets.
● Evaluating opportunities for green infrastructure on City-owned properties, including portions of the City
Hall parking lot.
● Managing invasive vegetation and underbrush while preserving mature trees, which provide habitat,
bank stability, shade, and character. An example of this would be Mill Ditch; by leaving trees and
removing underbrush, the ditch corridor would not be decimated.
Before advancing the proposed railroad bridge and spur trail proposed at the Bozeman Creek between
Wallace and Rouse, I encourage the City to evaluate construction costs, ADA requirements, long-term
maintenance, redundancy with existing trail connections, and potential impacts on our urban wildlife habitat.
2. Target level of flood protection
The Preliminary Engineering Report evaluates alternatives using a design flow of 1,250 cfs, above the FEMA
100-year flow, to account for future conditions.
I support planning beyond today's minimum standards. However, flood resilience should be achieved through a
balanced combination of strategic infrastructure improvements, distributed flood storage, wetland restoration,
and green infrastructure. As the report notes, increasing conveyance at one location without addressing the
larger system may simply move flooding downstream.
3. Balancing ecological health with community needs
Ecological health and community needs should be complementary goals.
Future projects should preserve mature trees where feasible, protect wetlands and riparian habitat, evaluate
wildlife impacts before constructing new trail corridors, and make greater use of existing transportation
infrastructure and trail connections before building redundant facilities.
Finally, I respectfully encourage the Commission to adopt the following guiding principle:
Before acquiring additional private property or constructing new infrastructure, the City should
demonstrate that existing public assets, conservation lands, transportation corridors, and public
infrastructure cannot reasonably achieve comparable public benefits.
As a licensed architect and member of the American Institute of Architects (AIA), I have had the privilege of
working with engineers, landscape architects, artists, public agencies, and community organizations to design
civic spaces, sculptural bridges, parks, memorials, and public spaces throughout Montana. If the City
establishes an advisory committee or stakeholder group as this project advances, I would welcome the
opportunity to contribute my experience in a constructive and collaborative manner.
Thank you for your consideration.
Respectfully,
Kenneth J. VanDeWalle, Architect, AIA
408 N Plum Ave.
Bozeman, MT 59715
archindetail1@gmail.com
Bozeman Creek Vision Plan
Guiding Principles & Recommendations
Submitted by Kenneth J. VanDeWalle, Architect, AIA
Guiding Principle
Use Existing Public Assets First
Before acquiring additional private property or constructing new infrastructure, the City should demonstrate that
existing public assets, conservation lands, transportation corridors, and public infrastructure cannot reasonably
achieve comparable public benefits.
Key Recommendations
1. Evaluate a Hybrid Approach
● Direct staff to develop a preferred alternative that combines the strongest elements of multiple
concepts, consistent with the Preliminary Engineering Report's recommendation that hybrid solutions
be considered.
2. Expand Existing Public Investments
● Enhance the Indreland Audubon Wetland Preserve.
● Create additional pocket wetlands on public land.
● Incorporate green infrastructure into City-owned properties.
● Build upon existing trails and transportation infrastructure before creating redundant facilities.
3. Reevaluate the Proposed Railroad Bridge and Spur Trail
● Compare the proposed crossing between Wallace and Rouse Streets with the existing historic railroad
berm at the Indreland Preserve that would allow access to the wetlands on the other side of the railroad
tracks for citizen scientists to have access to monitor water quality and wetland habitat.
● Evaluate ADA requirements, costs, long-term maintenance, wildlife impacts, and whether the existing
proposed crossing provides benefits beyond existing trail connections.
4. Protect the Creek's Ecological Character
● Preserve mature trees whenever feasible.
● Manage invasive vegetation and underbrush selectively.
● Protect wetlands and riparian habitat.
● Evaluate wildlife impacts before selecting new trail alignments.
5. Measure Success Using Multiple Criteria
Evaluate alternatives using transparent criteria that include:
● Flood mitigation performance
● Ecological health
● Water quality
● Community connectivity
● Construction and maintenance costs
● Property impacts
● Opportunities to leverage existing public investments
Vision
Bozeman Creek should become a model for integrating flood resilience, ecological restoration, recreation, and
thoughtful urban design through collaborative, watershed-scale planning that builds upon the public assets our
community has already invested in.