Loading...
HomeMy WebLinkAbout010-C4.1_CONST MANAGEMENT PH2///////////////////////////8 WEEG GT T8 SS8 SS8 W8 W8 W8 WSS ////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////8 W 8 W 8 WWS WS WSWSWS WS WS//////T T T T T T TTTTGGGGGGG G G G G E E E E E E E E EEEEE SSSSSSSSSSSSSSSSSSWSWSWSGGGG/// /// /// /// /// /// 8 S S 8 SS8 SS10 SS10 SS10 SS10 SS10 SS10 SS8 SS8 SS8 SSL O B B Y 10 1 M E C H & S T O R A G E 10 4 CO U R T S 10 5 W W W WSSSSWWW W W WSSSSSSSSSSSSSSSSSSSSSSSSEEEE E E E EG G G G GGGGFDC11"X17": 1"= 40 ftNGRAPHIC SCALE1 inch = ft.0( IN FEET )10202020HEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2026VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYH:\2127\001\ACAD\SHEETS\C4.0_CONST MANAGEMENT.dwg Plot Date: 1/21/2026 7:31 AM© HEADWATERS ENGINEERING, INC.REVISION DATE:1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718HEADWATERSMT.NET406-581-5730PROJECT LOCATIONMONTANABOZEMAN1/21/26JRMCONST. MANAGEMENT PLAN - PH2350 GALLATIN PARK DRIVEBCPC FACILITY2127.001C4.1STORM POND &SNOW STORAGEOFFICEINDOORFACILITY(6 COURTS)OUTDOORCOURTSPROPERTY BOUNDARYPROPERTY BOUNDARYGALLATIN PAR K D R I V E PROPERTY BOUNDARYGRAVEL TRAIL3' SIDE YARD3' SIDE YARD3' REAR YARD346 GALLATINPARK DRIVLOT 11, BLK 2CONSTRUCTIONTRAFFIC TOMANLEYROADEXISTINGHYDRANTMANLEY DITCH20 CYD ROLLOFFDUMPSTEROUTHOUSESTAKED DOWNPHASE 1PHASE 2(OFFICEBUILDING)TOPSOILSTOCKPILECONSTRUCTION MANAGEMENT NOTES:1. TOPSOIL STOCKPILE WILL BE REMOVED AS SOONAS CURB & GUTTER IS INSTALLED AND TOPSOILREDISTRIBUTION CAN BE COMPLETED. ANY EXCESSTOPSOIL WILL BE HAULED OFFSITE AT THAT TIME.2. SWPPP PLAN MUST BE COORDINATED WITH THECONSTRUCTION MANAGEMENT PLANPHASE 2STAGINGAREACONSTRUCTIONFENCE ORSILT FENCEUTILIZEFORCONSTRUCTIONACCESSPHASE 2STAGINGAREAPHASE 2 LIMITS