Loading...
HomeMy WebLinkAbout005-C2.0_SITE PLAN////////////////////////////////////8 WEEG GT T8 SS8 SS8 W8 W8 W8 W8 WS S ////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////8 W 8 W 8 WWSWS WS WS WS WSWS8 W/////////T T T T T T TTTTGGGGGGG G G G G E E E E E E E E E EEEE SSSSSSSSSSSSSSSSSSSSWSWSWSGGGGGGG/// /// // / // / // / // / 8 SS8 SS 10 SS10 SS10 SS10 SS10 SS10 SS10 SS10 SS10 SS10 SS8 SS8 SS8 SS8 SSCLOSE T UPWWWWS S SSSSWWWWWWEEEE E E E EG G G G GGGGFDC 292.7'155.8'119.4'1 1 4 . 4 '173.7'216.1EEESSSSWSWSWSGGGTTT11"X17": 1"= 50 ftNGRAPHIC SCALE1 inch = ft.0( IN FEET )12.5252525HEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2026VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYH:\2127\001\ACAD\SHEETS\C2.0_SITE PLAN.dwg Plot Date: 5/27/2026 10:03 AM© HEADWATERS ENGINEERING, INC.REVISION DATE:1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718HEADWATERSMT.NET406-581-5730PROJECT LOCATIONMONTANABOZEMAN05/27/2601/21/26JRMSITE PLAN350 GALLATIN PARK DRIVEBCPC FACILITY2127.001C2.0STORM POND &SNOW STORAGEOFFICEINDOORFACILITY(6 COURTS)OUTDOORCOURTSEXISTING SEWER MAINPROPERTY BOUNDARYPROPERTY BOUNDARYGALLATIN P A R K D R I V E PROPERTY BOUNDARY30' PUBLIC UTILITY EASEMENT PLAT J-300& 30' TRAIL EASEMENT DOC #2074572GRAVEL TRAILGRAVEL TRAIL CONNECTION3' SIDE YARD3' SIDE YARD3' REAR YARD346 GALLATINPARK DRIVEM-1 ZONINGBIKE RACKS (2) HANGERCAPACITY 14+ BIKESFIRE RISER ROOM30' PUBLIC ACCESS EASEMENTDOC #216128130' PUBLIC SEWER EASEMENT FILM 4, PAGE 107820' RECIPROCAL ACCESS EASEMENTPLAT J-30012' PUE, PLAT J-300EXISTING HYDRANTINVERTED U BIKE RACK (2 BIKES)TRASHENCLOSURELEGENDUNDERGROUND ELECTRICSEWER PIPEWATER SERVICE LINEEASEMENT OR SETBACK AS LABELEDUNDERGROUND GAS LINEUNDERGROUND COMMUNICATION LINEEXISTING CONTOURS 0.5' INTERVAL4" IRRIGATION CONDUITPROPOSED SIDEWALKEXISTING CURB AND SIDEWALKGRAVEL TRAILPROPOSED FENCEADA PARKINGSIGN, SEE DETAILSHEET C3.1ADA PARKINGSIGN, SEE DETAILSHEET C3.1STRIPE ADAPARKINGREINFORCEDCONCRETECROSSWALK3' SIDE YARD3' REAR YARD10' F R O N T Y A R D GRAVEL TRAIL24.00'79.6'18.0'79.0'77.0'25.0'24.0'18.0'26.0'37.0'PARKING NOTES1. EXISTING PARKING SPACES = 02. PROPOSED PARKING SPACES = 46, INCLUDING 2 ADA3. AREA OF PROPOSED SPACES = 7,452 SF4. ONSTREET PARKING SPACES = N/A5. EXISTING BICYCLE PARKING SPACES = 06. PROPOSED LONG TERM BICYCLE PARKING SPACES = 67. PROPOSED SHORT TERM BICYCLE PARKING SPACES = 16SITE PLAN NOTES1. NO HISTORIC, CULTURAL OR ARCHAEOLOGICALRESOURCES EXIST ONSITE.2. NO WETLANDS EXIST ONSITE PER THE 2025 WETLANDDELINEATION COMPLETED BY POWER ENGINEERS.3. ZONING = M-14. COMMERCIAL OPEN SPACE IS NOT REQUIRED ININDUSTRIAL ZONING AREAS.5. SITE TO USE A BOX IN THE EXISTING CLUSTER MAILBOXAT THE CORNER OF MANLEY ROAD AND GALLATIN PARKDRIVE6. BUILD-TO REQUIREMENTS ARE N/A FOR M-1 ZONING7. SNOW STORAGE AREA IS 5980 SF OR 22% OF THE PAVEDAREA OF 26,175 SF.8. SNOW REMOVAL WILL ALL BE PUSHED FROM THE FRONTOF THE LOT TO THE REAR OF THE LOT INTO THE STORMPOND. THIS WILL ALLOW ALL SNOW MELT TO BE DIRECTLYTREATED IN THE RETENTION POND. THE CURB IS TO BEDRIVE OVER CURB TO ALLOW THE SNOW PLOWS TO PUSHTHE SNOW OFF OF THE ASPHALT EASILY.9. NO SETBACK ENCROACHMENTS EXIST.PRIVATE OPENSPACE BPRIVATE OPENSPACE CPRIVATE OPENSPACE CLOT 1BLOCK 31.158 ACRESLOT 11BLOCK 20.627 ACRESLOT 5BLOCK 10.533 ACRESLOT 6BLOCK 10.322 ACRESRAILROADRIGHT OF WAYOFFSITEDELINEATEDWETLANDS25' WETLAND SETBACK50' WETLAND SETBACKUTILITYEASEMENT PERDOC 2791401, TOBE ABANDONEDMANLEY DITCHSNOW STORAGE AREA = 5,980 SF(22% OF ASPHALT AREA)M-1 ZONINGM-1 ZONINGM-1 ZONINGSITE VISION TRIANGLESI T E V I S I O N T R I A N G L E ROOF/GUTTER LINEROOF/GUTTER LINEROOF/GUTTER LINENOT WETLAND SETBACK ENCROACHMENT BY FOUNDATION(6) INDOOR BIKE RACKSASPHALT PARKING LOTP H A S E 2 P H A S E 1 BUILDING CONSTRUCTION PHASE LINECOURT #1COURT #2COURT #3COURT #4INSTALL FIRELANE SIGNINSTALL FIRELANE SIGNINSTALL FIRELANE SIGNINSTALL FIRELANE SIGNINSTALL COMPACTPARKING SIGNS, SEEDETAIL SHEET C3.198.1'81.8816.17