Loading...
HomeMy WebLinkAbout026-UTILITY CONFLICT MITIGATION PLAN-EX A7.6'4.0'17.2'11.0'9.0'~6.0'~1.75'5.0'11"X17": 1"= 2 ftGRAPHIC SCALE1 inch = ft.0( IN FEET ).5111HEADWATERSPROJECT NUMBERDRAWING NUMBERDRAWN BY:DATE:2026VERIFY SCALETHESE PRINTS MAY BEREDUCED. LINE BELOWMEASURES ONE INCH ONORIGINAL DRAWING. MODIFY SCALE ACCORDINGLYH:\2127\001\ACAD\SHEETS\EXHIBITS\STORM POND-SEWER.dwg Plot Date: 4/4/2026 10:36 AM© HEADWATERS ENGINEERING, INC.REVISION DATE:1105 REEVES RD WEST, SUITE 6, BOZEMAN, MT 59718HEADWATERSMT.NET406-581-5730PROJECT LOCATIONMONTANABOZEMAN04/04/26JRMUTILITY CONFLICT MITIGATION PLAN350 GALLATIN PARK DRIVEBCPC FACILITY2127.001EX A3:1 SLOPE2:1 SLOPEEXISTING SEWERMAIN UPSIZED TO27" PVCFUTURE 27" PVCSEWER MAINAPPROXIMATECONSTRUCTIONTRENCHSTANDARD30 TONEXCAVATORSTORMPONDEXISTING GROUNDSTRUCTURALSLOPE REQ.NATIVEGRASSESON SLOPE