HomeMy WebLinkAbout048 - L 501 - PARK Landscape Details1L501NTS8' Pilot Rock Picnic TablePICNIC TABLE, SURFACEMOUNT WITH 38"CONCRETE ANCHORSPER MANUFACTURER'SSPECIFICATIONS.TABLES LOCATED INCRUSHER FINES WILLREQUIRE 8" WIDE CURBTO FASTEN BENCH TOO.FINISH GRADEMIN 4" CONCRETESURFACE MOUNT CLAMPSAROUND TABLE FRAME.2L501NTS14'x18' Pavilion with Clerestory Style RoofTO FROSTDEPTHPER CODEFINISH GRADEINSTALL POSTS INCONCRETE FOOTINGS ATEACH PIER LOCATION,SEE NOTE4" CONCRETESTEEL PAVILION,BY OTHERS6" DEPTH 34" MINUSAGGREGATEBASE MATERIALSTEEL BASE PLATE,ATTACHED TO CONCRETEWITH CONCRETE ANCHORS,PER MANUFACTURER'SSPECIFICATIONCOMPACTEDSUBGRADENOTE: DRAWING IS CONCEPTUAL ONLY.CONTRACTOR TO ENGAGE STRUCTURAL ENGINEERFOR FOOTING REINFORCEMENT AND SIZE.MANUFACTURER TO PROVIDE SHOP DRAWINGSPRIOR TO INSTALLATION. CONFIRM ALLMEASUREMENTS BEFORE CONSTRUCTION.34" EXPANSION JOINTWITH 18" RADIUS3L5011" = 1'-0"Steel Edging at Trail EdgeFINISH GRADENOTE:1.REMOVE ALL DEBRIS AND STONES (LARGER THAN 3" DIAMETER)2.ALL PLANTING BEDS TO BE EXCAVATED 18" DEEP. SCARIFY SIDES ANDBOTTOM TO REMOVE GLAZING. ALL BEDS TO RECEIVE NEW, AMENDEDSOIL: MIX 1" COMPOST WITH MIN. 17" NEW TOPSOIL, FOR A COMBINEDSETTLED DEPTH OF 18". RAKE SMOOTH TO MATCH FINAL GRADING PLAN1" REVEALNATIVE SOIL316" X 4" NATURAL STEEL EDGING TACWELDED TO #4 REBAR DRIVENMIN. 18" REBAR SPACED 24" O.C.3" - 4" LAYER OF MULCH. MULCHTYPE PER PLAN.ADJACENT CRUSHERFINES TRAILTOPSOIL, SEE NOTE 24L501NTSPlayWorld Mount Vernon- Play equipment (Phase 2)5L501NTSParkitect Classic Bow Tie Pump Track (Phase 2) LandscapeDetailsL 501design5la.com406.587.4873dateissuedrawn by:checked by:filename:z:\nwb west park neighborhood\autocad\01_sheets\2025 laurel meadows-parks-ph1\l500_west-park-parks_standarddetails2021-ph1.dwg
Laurel Meadows
Phase 1 Park Plan
Bozeman, Montana
KHM/HU TMS
12/16/25Prelim Plat03/10/26Prelim Plat RC 104/29/26Prelim Plat RC 2NOTE: PLAYGROUND EQUIPMENT HAS NOT BEEN REVIEWED FOR PHASE 1CONSTRUCTION AND FINAL PLAYGROUND EQUIPMENT DETAILS ANDSPECIFICATIONS WILL BE PROVIDED WITH PHASE 2 REVIEWPROPOSED PLAY EQUIPMENT FOR PHASE 2 ONLY. SEE NOTE BELOW: SHOWN FOR PARKS DEPT. CONTEXT ONLY ASREQUESTED & NOT SUBJECT TO REVIEW FOR APPROVAL OF PRELIMINARY PLAT AND PHASE 1 REVIEW AT THIS TIME. FINALPHASE 2 PLAY EQUIPMENT WILL BE SUBMITTED AT A LATER DATE WITH PARK PHASE 2 PLAN REVIEW.048