Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
012 - APpendix D - Phasing Plan
N18°0 0 ' 4 4 " E 5 7 5 . 4 0 'PARK11.29 acs.PARK11.29 acs.PARK11.29 acs.HHHHHHHHHHHHHHMHHHHHHHHHHHH8W 8W 8W 8W 8W 8W 8W 8W 8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W8W8W8W8W8W8W8W8W8W8W8WDYH DYH DYH DYH DYH DYH 8S8S8S8S8S8S 8S 8S 8S 8S 8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8SSDSD SD SD SDSDSD DDDDDDDDDDBTBTBTBTBTBPBPBPBPBPNGNGNGNGBTBTBTBTBTBTBTBPBPBPBPBPBPBPNGNGNGNGNGBTBTBTBTBTBTBTBPBPBPBPBPBPBPNGNGNGNGNGNGBTBTBT BT BT BT BT BT BT BT BPBPBP BP BP BP BP BP BP BP NGNGNG NG NG NG NG NG BTBTBT BT BT BT BT BT BT BPBPBP BP BP BP BP BP BP NGNG NG NG NG NG BTBT BT BT BT BT BPBP BP BP BP BP NGNG NG NG NG BT BT BT BP BP BP NG NG BT BT BT BP BP BP NG NG NG NG BT BT BT BP BPBTBT BTBTBTBTBTBPBPBPBPBPBPBPNGNGNGNGNGBTBTBTBTBTBPBPBPBPBPNGNGNGBTBTBTBTBTBPBPBPBPBPNGNGNGDYH DYH DYHSDSSGSSSSSSWV WV WV WV WV WV WVWVWV WV WV WV WV WVWWW WWWWWS201854780.033MHS-TEMPS WWWWWWWV WV WV DYH WV WVWV WV WVWV WV WV WVWV WV WV WV WV WVWVWV WVWV W W W W W W W WWWWWSSSSSWWW W W W W S SSSSSSSSSSSDYHDYHS SSFM FMFMFMFMFMFMFMSFMFMFMFMFIGURE NUMBER©PROJECT NO.DRAWN BY:DSGN. BY:APPR. BY:DATE:COPYRIGHT MORRISON-MAIERLE,2026Plotted by cooper krause on Mar/6/2026engineers surveyors planners scientistsMorrisonMaierle2880 Technology Blvd WestBozeman, MT 59718406.587.0721www.m-m.netN:\10130\001.04-PDZandPPLAT\ACAD\Exhibits\10130.001.04_Phase 1 and 2 Plan.dwg 10130.001.04PH-0LAUREL MEADOWS SUBDIVISION BOZEMANMTPHASING PLAN- OVERVIEWRSNRSNCPK12/31/25100200501000SCALE IN FEETLEGENDPHASE PARK BOUNDARY-SEE PARK MASTER PLAN FOR PARK PHASINGPHASE 1 BOUNDARY-SEE PH-1.0 AND PH-1.1 FOR PHASE 1 IMPROVEMENTSPHASE 2 BOUNDARY-SEE PH-2 FOR PHASE 2 IMPROVEMENTSFUTURE PHASE BOUNDARYPHASE 1PHASE 2FUTURE PHASE(RESTRICTED LOT 1)PARKW BABCOCK STLAUR E L P A R K W A Y VAUGHN DRIVEPOND LILY DRIVE STRE E T A ALLE Y B STREET AALLEY ADONNER DRIVEFUTURE PHASE(RESTRICTED LOT 2)MITIGATED WETLAND AREATO BE CONSTRUCTED WITHPHASE 1SHARED USE PATHS TO BECONSTRUCTED WITH PHASE 1END SHARED USE PATH(PHASE 1)CONSTRUCT NEW APPROACH TOPOND LILY WITH PHASE 1 TO ENSURECOMPLETE SHARED USE PATH ROUTEALONG ENTIRE PROPERTY FRONTAGE. N18°00'44"E 575.40'HHHHHHHHHHHHHHMHHHHHHHHHHHH8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W 8W 8W 8W 8W 8W 8W 8W 8W 8W8W8W8W8W8W8W8W8W8WWSWSWSWSWS 8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8SSDSDSDSD SD SD SD SD SD SDSDSDSDSD SD SDSDDDDDDD SDDDBTBTBTBTBTBTBTBTBTBTBTNGNGNGNGNGNGNGNGBT BT BT BT BT BT BTNGNGNGNGNGBTBTBTBTBTBTNGNGNGNGNGNGNGNGBTBTBTBTBT BTBTBTBTBTBTBTBTBTBTBTNGNGNGNGNGNGNG NGBTBTBTBTBTBTBTBTBTBTNGNGNGNGNGNGNGBTBTBTBTBTBTBTBTBTBTNGNGNGNGNGNGNGSDYHGSSSSSWVWVWVWVS201854780.033MHS-TEMPSSS WVWVWVWVWVWVWVWVWVWVSDWSWWWWWWWWWWWWWWWWWWWWWWWWWSSSSSSSSSSSSSSSSSSSSSSSSDYHSSSWSSSSSSFMFMFMFMFMFM FMFMFMFMFMFMFMFMSFIGURE NUMBER©PROJECT NO.DRAWN BY:DSGN. BY:APPR. BY:DATE:COPYRIGHT MORRISON-MAIERLE,2026Plotted by cooper krause on Mar/6/2026engineers surveyors planners scientistsMorrisonMaierle2880 Technology Blvd WestBozeman, MT 59718406.587.0721www.m-m.netN:\10130\001.04-PDZandPPLAT\ACAD\Exhibits\10130.001.04_Phase 1 and 2 Plan.dwg 10130.001.04PH-1.0LAUREL MEADOWS SUBDIVISION BOZEMANMTPHASE 1RSNRSNCPK12/31/255010025500SCALE IN FEETLEGENDPHASE 1 BOUNDARYPROPOSED 8" SEWER MAINPROPOSED 8" WATER MAINPROPOSED STORM MAINWETLAND TO BE MITIGATEDWITH PHASE 1UTILITY NOTESREMOVE TEMPORARY STORM POND, INSTALL FOREBAY 1INSTALL WETPONDRELOCATE LUMINAIRERELOCATE STORM INLETSINSTALL NEW 12"X8" TAPPING TEE AND GATE VALVEABANDON EXISTING 8" WATER MAIN STUB AT THE 12" MAININSTALL NEW WATER SERVICE CONNECTION TO EXISTING MAININSTALL NEW 48" SEWER MANHOLEMITIGATE WETLAND TO PARK (SEE EXHIBIT PH-1.1)INSTALL TEMPORARY DEAD END BARRICADEINSTALL TEMPORARY 2" BLOW-OFFFUTURE FOREBAY. NOT PART OF PHASE 1 OR 22134567898577773412691010101111118S8WSDPHASE 1PHASE 2LAUREL PARKWAY POND LILY DRIVE STREET A ALLEY B ALLEY ADONNER DRIVEFUTURE PHASE121210FULL LENGTH OF LAURELPARKWAY SHARED USE PATH TOBE CONSTRUCTED WITH PHASE 1,FROM BABCOCK TO THE EXISTING5FT SIDEWALK AT THE NORTHERNBOUNDARY OF THE PROPERTY.PHASE 1 INFRASTRUCTURE IMPROVEMENTS INCLUDE A COMPLETE SHAREDUSE PATH ALONG LAUREL PARKWAY AND W. BABCOCK STREET FOR THEFULL FRONTAGE OF THE PROPERTY. THE PROPOSED MITIGATED WETLANDIN THE PARK IS ALSO PART OF PHASE 1. N18°00'44"E 575.40'HHHHHHHHHHHHHHHHHHHHMHHHHHHHHHHHH8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W 8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8W8WDYHDYHDYH DYH DYH 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S 8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8S8SSDSD DDDSDDDBTBPNGBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPNGNGNGNGNGNGNGNGNGNGNGBTBTBTBTBTBTBTBTBTBTBTBTBTBTBTBPBPBPBPBPBPBPBPBPBPBPBPBPBPBPNGNGNGNGNGNGNGNGNGNGNGNGBTBTBTBTBTBT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BT BPBPBPBPBPBP BP BP BP BP BP BP BP BP BP BP BP BP BP BP BP NGNGNGNGNG NG NG NG NG NG NG NG NG NG NG NG BTBTBTBTBT BT BT BT BT BT BT BT BT BT BT BT BT BT BPBPBPBPBP BP BP BP BP BP BP BP BP BP BP BP BP BP NGNGNG NG NG NG NG NG NG NG NG NG NG BTBTBT BT BT BT BT BT BT BT BT BT BT BPBPBP BP BP BP BP BP BP BP BP BP BP NGNG NG NG NG NG NG NG NG NG BT BT BP BP NG BTBP NGBTBTBTBTBTBTBT BTBTBTBTBTBTBTBPBPBPBPBPBPBPBPBPBPBPBPBPNGNGNGNGNGNGNGNGNGNGDYHDYHSDSSSSWV WV WV WV WV WVWVWV WV WWWWWWWWWWWWWWWWW WWSSWV DYHWVWVWVWVWV WV WV WV WVWWWWWW WWWWWWWWWWWWSSSSSSSSSSSSSSSSSSDYHDYHS FIGURE NUMBER©PROJECT NO.DRAWN BY:DSGN. BY:APPR. BY:DATE:COPYRIGHT MORRISON-MAIERLE,2026Plotted by cooper krause on Mar/6/2026engineers surveyors planners scientistsMorrisonMaierle2880 Technology Blvd WestBozeman, MT 59718406.587.0721www.m-m.netN:\10130\001.04-PDZandPPLAT\ACAD\Exhibits\10130.001.04_Phase 1 and 2 Plan.dwg 10130.001.04PH-2LAUREL MEADOWS SUBDIVISIONBOZEMANMTPHASE 2RSNRSNCPK12/31/255010025500SCALE IN FEETUTILITY NOTESCONNECT TO EXISTING WATER MAIN STUBCONNECT TO PHASE 1 WATER MAIN STUBSCONNECT TO PHASE 1 SEWER MAIN STUBSINSTALL TEMPORARY STORM PONDINSTALL TEMPORARY DEAD END BARRICADE213412223335554LEGENDPHASE 2 BOUNDARYPROPOSED 8" SEWER MAINPROPOSED 8" WATER MAINPROPOSED STORM MAIN8S8WSDPHASE 1PHASE 2LAUREL PARKWAY POND LILY DRIVE STREET AALLEY AW BABCOCK STREETDONNER DRIVEFUTURE PHASEFULL LENGTH OF LAURELPARKWAY SHARED USE PATH TOBE CONSTRUCTED WITH PHASE 1,FROM BABCOCK TO THE EXISTING5FT SIDEWALK AT THE NORTHERNBOUNDARY OF THE PROPERTY.FULL LENGTH OF W. BABCOCKSTREET SHARED USE PATH TO BECONSTRUCTED WITH PHASE 1, FROMLAUREL PARKWAY TO THE EASTERNBOUNDARY OF THE PROPERTY.