Loading...
HomeMy WebLinkAbout035 - AS002 - ARCHITECTURAL SITE DETAILSB 02 03 04 05 06 A LOADINGELECTRIC ROOM VESTIBULE UPS PLUMBING69'-4"39'-8"4'-5" 33'-8"4'-0" 29'-5" AS002 4 AS002 3 AS0022 AS002 6 AS0025 7 12 A002 ______________ 12 A002 ______________8 A002 ______________ 12 A002 ______________ 12 A002 ______________ 12 A002 ______________10'-7" 10'-3" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 8'-0" 02.2 G-1 G-2 GROUND MOUNTED TRANSFORMER, BY NORTHWEST ENERGY 49'-10" 49'-10" BACKUP GENERATOR, TYP. SWITCHGEAR, TYP. COOLING TOWER, TYP. CHILLER, TYP. ARGON NITROGEN CORRUGATED METAL PANELS OVER HSS TUBE STEEL STRUCTURE, REF STRUCTURAL 20'-4"4"CORRUGATED METAL PANELS OVER HSS TUBE STEEL STRUCTURE, REF STRUCTURAL 20'-4"4"CORRUGATED METAL PANELS OVER HSS TUBE STEEL STRUCTURE, REF STRUCTURAL A 20'-4"4"A.6CORRUGATED METAL PANELS OVER HSS TUBE STEEL STRUCTURE, REF STRUCTURAL 10'-4"4"CORRUGATED METAL PANELS OVER HSS TUBE STEEL STRUCTURE, REF STRUCTURAL CORRUGATED METAL PANELS OVER HSS TUBE STEEL STRUCTURE, REF STRUCTURAL 10'-4"4"CORRUGATED METAL PANELS OVER HSS TUBE STEEL STRUCTURE, REF STRUCTURAL SEE ELEVATIONSHOLLOW STRUCTURAL SECTION CUSTOM PERFORATED METAL CLADDING POST POST EMBEDDED IN CONCRETE POST BASE CONCRETE FOOTING REVISIONS 5/15/2026 11:47:51 AM ARCHITECTURAL SITE DETAILS AS002 | Project# URSUS_MAJ | L:\URSUS_MAJ\BIMCAD\Revit 05.18.2026 © 2025 | ALL RIGHTS RESERVED SITE PLAN APPLICATION URSUS _ MAJORBOZEMAN, MTLATTICE MATERIALSPROJ# | URSUS_MAJ DESIGNED BY | Designer DRAWN BY | Author REVIEWED BY | Checker 1/8" = 1'-0"AS002 1 FIRST FLOOR - MECHANICAL YARD ENLARGED PLAN 1/8" = 1'-0"AS002 2 WEST MECH YARD SCREEN - EAST 1/8" = 1'-0"AS002 3 WEST MECH YARD SCREEN - NORTH 1/8" = 1'-0"AS002 4 WEST MECH YARD SCREEN - WEST 1/8" = 1'-0"AS002 5 EAST MECH YARD SCREEN - EAST 1/8" = 1'-0"AS002 6 EAST MECH YARD SCREEN - NORTH 1/8" = 1'-0"AS002 7 EAST MECH YARD SCREEN - WEST 1/2" = 1'-0"AS002 8 PANEL SECTION NORTH REF 03.06.2026 05.15.2026 CITY COMMENTS # 1