Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
033 - A201 - EXTERIOR ELEVATIONS
MATERIALS LEGEND WD-1 WOOD CLADDING MT-2 METAL CLADDING K-1 KALWALL G-1 GLAZING ST-1 STONE CLADDING MT-1 METAL CLADDING G-2 SPANDREL GLAZING MT-3 METAL CLADDINGFIRST FLOOR 100'-0" SECOND FLOOR 115'-0" 010203040506070809101112 T.O. ROOF 149'-1" T.O. OFFICE ROOF 131'-0" T.O. LOW PARAPET 118'-6" 02.212.2 FIRST FLOOR 100'-0" SECOND FLOOR 115'-0" 01 02 03 04 05 06 07 08 09 10 11 12 T.O. ROOF 149'-1" T.O. STAIR PARAPET 133'-0" T.O. OFFICE ROOF 131'-0" T.O. LOW PARAPET 118'-6" 12.2 FIRST FLOOR 100'-0" SECOND FLOOR 115'-0" BDEJGH AF T.O. PARAPET 130'-0" C T.O. LOW PARAPET 118'-6" D.5 A.6 FIRST FLOOR 100'-0" SECOND FLOOR 115'-0" B D E G H T.O. ROOF 149'-1" FC T.O. LOW PARAPET 118'-6" D.5 METAL ROOF KALWAL SKYLIGHT, SEE A110 GUTTER AND DOWNSPOUT GUTTER AND DOWNSPOUT 20'-4"METAL _ MECHANICAL SCREEN WALL REVISIONS 5/15/2026 9:09:43 AM EXTERIOR ELEVATIONS A201 | Project# URSUS_MAJ | L:\URSUS_MAJ\BIMCAD\Revit 05.18.2026 © 2025 | ALL RIGHTS RESERVED SITE PLAN APPLICATION URSUS _ MAJORBOZEMAN, MTLATTICE MATERIALSPROJ# | URSUS_MAJ DESIGNED BY | WATSON DRAWN BY | WATSON REVIEWED BY | Checker 1/16" = 1'-0"A201 1 NORTH ELEVATION 1/16" = 1'-0"A201 2 SOUTH ELEVATION 1/16" = 1'-0"A201 3 EAST ELEVATION 1/16" = 1'-0"A201 4 WEST ELEVATION A201 5 SE CORNER A201 6 NW CORNER 20'-0" TALL CORRUGATED, PERFORATED MECHANICAL SCREEN WALL 10'-0" TALL CORRUGATED, PERFORATED MECHANICAL SCREEN WALL Note: Per BMC 38.260.140.B.5.b, relief from the transparent windowarea requirment is requested based on the following: The growth space housing Lattice materials is designed as a highlycontrolled and secure environment, reflecting both the proprietarynature of the manufacturing processes and the sensitivity of thematerials being produced. Due to the advanced and confidentialdesigns of the growers, visual access into this area must be strictlylimited to prevent the inadvertent disclosure of intellectual property.Transparent windows are therefore not permitted, as they wouldcompromise the physical and visual security of the operation.Additionally, many of the end users of these materials—includingclients within the Department of Defense—require strictconfidentiality regarding the components and systems beingfabricated. As such, preventing public visibility into the growth spaceis essential to maintaining compliance with security protocols,protecting client relationships, and safeguarding criticaltechnologies. A limited area of translucent panel has beenincorporated for daylight, but views are prohibited. Per BMC 38.230.030.B – Windows. Facade is more than 50-feet fromthe front or side street lot line and isexempt from street-facingrequirements.