Loading...
HomeMy WebLinkAbout014 - C300 - OVERALL UTILITY PLANstststststststststsssssssssssssssssssssssssssssssssssssssswmwmwmwmwmwmwmwmwmwmwmwmwmwmwmwmwmwm wmststststst ststststststssFM FM FMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMbp bp bp bp bp bp bpcommcommcomm commcommcommcommcommcommgasgasgasbpbpbpbpbpbpbpssssROYAL WOLF WYPRINCE LNwmwmwmwmsssswmFFFFFFWSWSWSWSGAS GAS GAS GAS GAS GASGASSSSSSSCOMM COMMBPBPBPBPBP BP BP BP BP BPBPBPBPBPBPBP BP BP BP BP BP BP BP BP BPBPBPBPBPBPBP BP BP BP BP BP BP GENSWITCHSWITCHVAN EVONLYEVONLYCOMPACTONLYCOMPACTONLYCOMPACTONLYCOMPACTONLYCOMPACTONLYCOMPACTONLYCOMPACTONLYCOMPACTONLYCOMPACTONLYCOMPACTONLYCOMPACTONLYCOMPACTONLYEVONLYEVONLYCOMPACTONLYCOMPACTONLYCOMPACTONLYCOMPACTONLYCOMPACTONLYEVONLYEVONLYEVONLYEVONLYCTGENFDCPOWERVAULTCONNECT TO 6" FIRE SERVICE.SANITARY WASTE CONNECTION.COORD. W/ PLUMBING 6" INV: 4587.50TRENCH PLUG AND UTILITY ENTRANCE.NEW TRANSFORMER.SEE ELECTRICAL.GAS SERVICE CONNECTION.SEE PLUMBING.6" FIRE SERVICE CONNECTIONAT BUILDING. SEE FIRE PLANS.TRENCH PLUG AND UTILITY ENTRANCE.4" DOMESTIC SERVICE CONNECTIONAT BUILDING. SEE PLUMBING.TRENCH PLUG AND UTILITY ENTRANCE.LATTICE MATERIALSBOZEMAN, MONTANA±64400 SQFTFFE = 4595.00CONNECT TO EXISTING 6" SSWR STUB.CONTRACTOR TO FIELD VERIFY LOCATION, SIZE AND INVER.T COORD W/ ENGINEERUPON ANY DISCREPANCIESREMOTE FDCPOWER VAULT10.00ELECTRICEASMENTSITE LIGHTING.TYP.SEE ELECTRICALPLANS.PLUMBING ROOM.DOMESTIC WATERAND FIRE ENTRANCE.23.7129.93CONNECT TO 4"DOMESTIC WATER SERVICE.PIPING PITFFE = 4584.00©| ALL RIGHTS RESERVED®DRAWN BY |REVISIONSREVIEWED BY |DESIGNED BY |PROJ# |URSUS MAJOR BOZEMAN, MT 2026SITE PLAN03.06.2026URSUS_MAJ3/6/2026 6:10 PM | L:\URSUS_MAJ\BIMCAD\Civil\Sheets\URSUS_MAJ_C300.dwgC300OVERALLUTILITY PLANSCHLEGEL-1C300OVERALL UTILITY PLAN0153060SCALE: 1" = 30'NORTHWATER NOTES1.UNLESS OTHERWISE NOTED, ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THECURRENT MPWSS AND CITY OF BOZEMAN MODIFICATIONS.2.UNLESS OTHERWISE SPECIFIED, WATER LINES 4" AND LARGER SHALL BE CLASS 51 DUCTILIRON PIPE IN CONFORMANCE WITH AWWA C151. ALL SERVICES AND CONNECTIONSSMALLER THAN 4" SHALL BE TYPE K COPPER MEETING AWWA STANDARD C800 ANDCONFORM TO THE CITY OF BOZEMAN STANDARDS.3.THE CONTRACTOR SHALL SUPPLY ALL NECESSARY FITTINGS, COUPLING, AND SPOOL PIECESFOR CONNECTING NEW UTILITIES TO EXISTING UTILITIES. THESE PLANS MAY NOT SHOW ALLREQUIRED COMPONENTS FOR MAKING THE CONNECTIONS.4.THE MINIMUM DEPTH OF BURY TO THE TOP OF PIPE FOR WATER LINES IS 6.5 FT AND AMAXIMUM OF 7.5 FT OF COVER. WHERE AT LEAST 6.5 FT OF COVER CANNOT BE MAINTAINED,INSTALL RIGID INSULATION BOARD ABOVE PIPING AS INDICATED ON PLANS.5.THE CONTRACTOR MUST ENSURE THAT A MINIMUM OF 10 FEET (OUTSIDE PIPE WALL TOOUTSIDE PIPE WALL) OF CLEARANCE IS MAINTAINED ON THE HORIZONTAL PLANE BETWEENALL WATER AND SEWER MAINS. ADDITIONALLY, THE CONTRACTOR MUST ALSO ENSURETHAT 18 INCHES OF VERTICAL CLEARANCE IS MAINTAINED BETWEEN WATER AND SEWERMAINS THAT CROSS. IMMEDIATELY NOTIFY ENGINEER OF CONFLICTS.6.LOCATIONS OF FITTINGS, BENDS, VALVES, AND OTHER APPURTENANCE ARE APPROXIMATE.PROVIDE ADEQUATE SPACING BETWEEN FIXTURES TO MAINTAIN PIPE INTEGRITY. PROVIDEAS BUILT LOCATIONS FOR ALL FIXTURES.7.ANY EXISTING OR NEW VALVES THAT CONTROL THE CITY OF BOZEMAN WATER SUPPLYSHALL BE OPERATED BY CITY PERSONNEL ONLY.8.PRESSURE TEST AND DISINFECT ALL WATER LINES IN ACCORDANCE WITH THE CITY OFBOZEMAN STANDARDS AND ALL OTHER GOVERNING AGENCIES' STANDARDS.9.ALL FITTINGS SHALL BE MECHANICAL JOINT WITH CONCRETE THRUST BLOCKS MEETINGCITY OF BOZEMAN STANDARDS.10.ALL DUCTILE IRON FITTINGS TO BE WRAPPED IN POLYWRAP.SEWER NOTES1.UNLESS OTHERWISE NOTED, ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THECURRENT MPWSS AND CITY OF BOZEMAN MODIFICATIONS.2.UNLESS OTHERWISE SPECIFIED, SANITARY SEWER PIPE SHALL BE PVC IN CONFORMANCEWITH ASTM D-3034, SDR 26. ALL SERVICES AND CONNECTIONS SHALL CONFORM TO THECITY OF BOZEMAN STANDARDS.3.ALL PIPES SHALL BE BEDDED WITH TYPE 1 BEDDING PER CURRENT MPWSS & ANYAPPLICABLE CITY OF BOZEMAN MODIFICATIONS.4.THE CONTRACTOR SHALL FLUSH AND CLEAN ALL SEWER PIPE AND MANHOLES.5.CONTRACTOR SHALL FIELD VERIFY LINE AND GRADE OF ANY EXISTING AND PROPOSEDUTILITY.DRY UTILITY NOTES1.THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE INSTALLATION OF ALL "DRY"UTILITIES (ELECTRIC, GAS, TELEPHONE) WITH SERVICE PROVIDERS.2.REFER TO ELECTRICAL PLANS FOR ADDITIONAL CONDUIT AND SITE LIGHTINGREQUIREMENTS.3.REFER TO LANDSCAPE PLANS FOR IRRIGATION CONDUIT.4.THE CONTRACTOR IS RESPONSIBLE TO CALL 1-800-424-5555 (OR 811) AT LEAST 2 WORKINGDAYS PRIOR TO ANY EARTH DISTURBING ACTIVITIES OR UTILITY EXCAVATIONS.