Loading...
HomeMy WebLinkAbout004 - C002 - SITE DEMO PLANstststststststststsssssssssssssssssssssssssssssssssssssssswmwmwmwmwmwmwmwmwmwmwmwmwmwmwmwmwmwm wmststststst ststststststssFM FM FMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMbp bp bp bp bp bp bpcommcommcomm commcommcommcommcommcommgasgasgasbpbpbpbpbpbpbpssssEXISTING RETENTION PONDCATTAIL CREEK 6" PVC8" PVC16" DIP24" HDPELIFT STATIONTRACT8" DIP8" PVC24" HDPEROYAL WOLF WYPRINCE LN18" HDPEWELL PUMP CONTROLRIM EL:4592.59INV EL:4577.31RIM EL:4594.44INV EL:4578.46RIM EL:4596.02INV EL:4579.72RIM EL:4592.63INV EL:4581.54RIM EL:4593.90INV EL:4583.08RIM EL:4592.48SUMP EL:4587.87RIM EL:4596.01SUMP EL:4585.95RIM EL:4594.05SUMP EL:4585.2215" HDPE20' UTILITY EASEMENT20' UTILITY EASEMENT20' UTILITY EASEMENT10' UTILITY EASEMENT10' UTILITY EASEMENT10' UTILITY EASEMENT25' PUBLIC TRAIL EASEMENT 12.5' ON EACH SIDE OF TRAILINV EL:4584.356" FIRE SERVICE4" WATER SERVICE6" FIRE SERVICE4" WATER SERVICE6" SEWER SERVICE6" SEWER SERVICE10' UTILITY EASEMENT10' UTILITY EASEMENTwmwmwmwmsssswmSAWCUT, REMOVE AND DISPOSEOF EXISTING CONCRETE AND ASPHALT.SAWCUT, REMOVE AND DISPOSEOF EXISTING CONCRETE AND ASPHALT.TO BE ABANDONEDWITH LOT CONSOLIDATION(SEPARATE APPLICATION)CLEAR AND GRUBTO BE ABANDONEDWITH LOT CONSOLIDATION(SEPARATE APPLICATION)LOT LINE TO BE REMOVEDBY LOT CONSOLIDATION(SEPARATE APPLICATION)SAWCUT, REMOVE AND DISPOSEOF EXISTING CONCRETE AND ASPHALT.REMOVE WATER AND FIRE SERVICES.©| ALL RIGHTS RESERVED®DRAWN BY |REVISIONSREVIEWED BY |DESIGNED BY |PROJ# |URSUS MAJOR BOZEMAN, MT 2026SITE PLAN03.06.2026URSUS_MAJ3/6/2026 6:07 PM | L:\URSUS_MAJ\BIMCAD\Civil\Sheets\URSUS_MAJ_C002.dwgC002SITE DEMO PLANSCHLEGEL-1C002SITE DEMO PLAN0153060SCALE: 1" = 30'NORTHPROJECT CONDITIONS1.CONDITIONS EXISTING AT TIME OF INSPECTION FOR BIDDING PURPOSES WILL BEMAINTAINED BY OWNER AS PRACTICABLE. VARIATIONS WITHIN STRUCTURES MAY OCCURBY OWNER'S REMOVAL AND SALVAGE OPERATIONS PRIOR TO START OF DEMOLITION WORK.2.UNLESS OTHERWISE INDICATED IN CONTRACT DOCUMENTS OR SPECIFIED BY THE OWNER,ITEMS OF SALVAGEABLE VALUE TO CONTRACTOR SHALL BE REMOVED FROM SITE ANDSTRUCTURES. STORAGE OR SALE OF REMOVED ITEMS ON SITE WILL NOT BE PERMITTEDAND SHALL NOT INTERFERE WITH OTHER WORK SPECIFIED IN CONTRACT DOCUMENTS.3.EXPLOSIVES SHALL NOT BE USED.SITE PREPARATION1.PROVIDE, ERECT, AND MAINTAIN EROSION CONTROL DEVICES, TEMPORARY BARRIERS, ANDSECURITY DEVICES PRIOR TO THE START OF DEMOLITION.2.PROTECT EXISTING LANDSCAPING MATERIALS, APPURTENANCES, AND STRUCTURES WHICHARE NOT TO BE DEMOLISHED. REPAIR DAMAGE CAUSED BY DEMOLITION OPERATIONS ATNO COST TO OWNER.3.THE CONTRACTOR IS RESPONSIBLE TO PREVENT MOVEMENT OR SETTLEMENT OFADJACENT STRUCTURES. PROVIDE BRACING AND SHORING AS NEEDED.4.MARK LOCATION OF UTILITIES. PROTECT AND MAINTAIN IN SAFE AND OPERABLE CONDITIONUTILITIES THAT ARE TO REMAIN. PREVENT INTERRUPTION OF EXISTING UTILITY SERVICE TOOCCUPIED OR USED FACILITIES, EXCEPT WHEN AUTHORIZED IN WRITING BY AUTHORITIESHAVING JURISDICTION. PROVIDE TEMPORARY SERVICES DURING INTERRUPTIONS TOEXISTING UTILITIES AS ACCEPTABLE TO GOVERNING AUTHORITIES AND OWNER.5.THE CONTRACTOR IS RESPONSIBLE TO CALL 1-800-424-5555 (OR 811) AT LEAST 2 WORKINGDAYS PRIOR TO ANY DEMOLITION ACTIVITIES.DEMOLITION NOTES1.THE CONTRACTOR IS RESPONSIBLE FOR PROTECTION OF ALL PROPERTY CORNERS ANDPINS.2.THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OF DAMAGE TO ANY EXISTINGIMPROVEMENTS DURING CONSTRUCTION, SUCH AS, BUT NOT LIMITED TO, DRAINAGE,UTILITIES, PAVEMENT, STRIPING, CURB, ETC. REPAIRS SHALL BE EQUAL TO OR BETTERTHAN EXISTING CONDITIONS3.ALL WORK ON THIS PLAN SHALL BE DONE IN STRICT ACCORDANCE WITH THE PROJECTSPECIFICATIONS.4.THE CONTRACTOR SHALL COMPLY TO THE FULLEST EXTENT WITH THE LATEST STANDARDSOF OSHA DIRECTIVES OR ANY OTHER AGENCY HAVING JURISDICTION FOR EXCAVATION ANDTRENCHING PROCEDURE. CONTRACTOR SHALL USE SUPPORT SYSTEMS, SLOPING,BENCHING, AND OTHER MEANS OF PROTECTION. THIS IS TO INCLUDE, BUT NOT LIMITED,FOR ACCESS AND EGRESS FROM ALL EXCAVATION AND TRENCHING. CONTRACTOR ISRESPONSIBLE TO COMPLY WITH PERFORMANCE CRITERIA FOR OSHA.5.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING THE PUBLIC DURINGDEMOLITION, WHICH INCLUDES BUT IS NOT LIMITED TO CONSTRUCTION FENCING,BARRICADES, SIGNAGE, ETC.6.THE CONTRACTOR SHALL COORDINATE WITH THE PROJECT OWNER AS TO SPECIFIC DETAILSREGARDING REMOVAL OF EXISTING BUILDINGS, CONTENTS AND ASSOCIATEDAPPURTENANCES.7.THE CONTRACTOR IS RESPONSIBLE TO INSPECT THE SITE PRIOR TO BIDDING AND INCLUDEIN THE BID ANY AND ALL ITEMS TO BE REMOVED, DEMOLISHED, OR MAINTAINED ASNECESSARY FOR THE CONSTRUCTION OF THIS PROJECT WHETHER THEY ARE SHOWN ONTHIS PLAN OR NOT.8.ALL MATERIAL GENERATED FROM DEMOLITION ACTIVITIES SHALL BE DISPOSED OF OFF-SITEAT THE CONTRACTORS EXPENSE UNLESS OTHERWISE INDICATED BY THE OWNER. ANAPPROPRIATE DUMP SITE SHALL BE NOMINATED BY THE CONTRACTOR PRIOR TO THE STARTOF CONSTRUCTION.9.THE CONTRACTOR SHALL VERIFY LOCATIONS AND MATERIAL TYPES OF ALL UTILITIES PRIORTO THE START OF DEMOLITION.10.PROVIDE POSITIVE DRAINAGE AT ALL TIMES WITHIN THE CONSTRUCTION AREA. DO NOTALLOW WATER TO POND IN EXCAVATION AREAS, AND MAINTAIN ALL EXISTING DRAINAGEPATTERNS.11.TRAFFIC, BOTH VEHICULAR AND PEDESTRIAN SHALL BE PROTECTED BY EFFECTIVEBARRICADES AND SIGNS IN ACCORDANCE WITH MUTCD GUIDANCE AND AS REQUIRED BYTHE JURISDICTION HAVING AUTHORITY. EFFECTIVE LIGHTING OF OBSTRUCTIONS SHALL BEPROVIDED AT NIGHT.12.PROTECTION OF PROPERTY - THE CONTRACTOR SHALL BE RESPONSIBLE FOR THEPROTECTION OF PUBLIC AND PRIVATE PROPERTY ADJACENT TO HIS WORK, AND SHALLEXERCISE DUE CAUTION TO AVOID DAMAGE TO SUCH PROPERTY. THE CONTRACTOR SHALLREPLACE OR REPAIR TO THEIR ORIGINAL CONDITION, ALL IMPROVEMENTS WITHIN ORADJACENT TO THE WORK AREA WHICH ARE NOT DESIGNATED FOR REMOVAL, AND WHICHARE DAMAGED OR REMOVED AS A RESULT OF OPERATIONS.