Loading...
HomeMy WebLinkAbout019 - Wastewater Memo cushingterrell.com March 18, 2026 Development Review Engineer City of Bozeman 20 E. Olive Street Bozeman, MT 59715 RE: Ursus Major Wastewater Memo To whom it may concern: The purpose of this memo is to address wastewater design capacity for the proposed development. Referencing the “Nelson Meadows Subdivision Water and Wastewater Design Report” dated February 2018 by Morrison Maierle the total anticipated wastewater generated for the subdivision is based on an estimated 960 gallons per acre per day. See table below from this report: The Ursus Major parcel is Lot 2A, Block 5, 4.86 acres which results in an estimated sewer capacity reserved for this parcel of 4,665 gpd and 12.59 gpm peak flow when using the same peak hour factor of 3.87. Utilizing guidance from Montana DEQ Circular 4, a typical flow rate of 13 gpd per employee can be used to estimate wastewater flow. With 50 employees, the daily peak demand for domestic wastewater use is 650 gpd. Based on the design of the facility, the process wastewater flow is 3,750 gpd, for a total of 4,400 gpd. Using the same peak hour factor of 3.87, the estimated peak hour flow is 12 gpm. Therefore, the Nelson Meadows sewer system and pump station appears to have been designed to adequately serve the Ursus Major development. Sincerely, Adam Schlegel, PE Civil Engineer