Loading...
HomeMy WebLinkAbout001 - Development Review ApplicationBOZEMANMT Planning Division Submitted Date: 03-02-2026 11:56 AM DEVELOPMENT REVIEW APPLICATION Remember to obtain owner signature on this form prior to uploading with the rest of your submittal PROJECT INFORMATION Project Name:Ursus Major Site Plan Project Type(s):Site Plan SP Street Address:NE corner of Royal Wolf Way and Prince Lane Legal Description: Nelson Meadows SUB, S22, T01S, R05E, Block 5, Lot 2 & 3, Per Plat J-680 Description of Project: Approximately 80,000 SF manufacturing facility and associated parking Current Zoning:M-1 Light Manufacturing District Existing Use:Undeveloped Proposed Use:Industrial Gross Lot Area:211912 Number of New Buildings:1 Type and Number of Dwellings:0 Building Size (SF):80000 Non-Residential Building Size (SF):80000 Building Height (ft):40 Affordable Housing (Y/N): Departure/Deviation Request (Y/N):No Zoning Verification Expedited (Y/N):No Wetlands Activity (Y/N):Yes Traffic Study or Waiver:Traffic Study Is there a pre-application pertaining to this project?:Yes Project Name and Project Number:26056 PROPERTY OWNER Company Name:Lattice Materials Name:Zachery Gill Full Address:516 E Tamarack St, Bozeman, MT 59715 Email:zachery.gill@latticematerials.com Phone:4065862122 APPLICANT Company Name:Cushing Terrell Name:Adam Schlegel Full Address:411 East Main Street , Bozeman, Montana 59715 Email:adamschlegel@cushingterrell.com Phone:4069227111 REPRESENTATIVE Company Name:Cushman Wakefield Name:Justin Stewart Full Address:1401 Lawrence Street 1100 , Denver, Colorado 80202 Email:Justin.Stewart@cushwake.com Phone:7206460939 CERTIFICATIONS AND SIGNATURES Applicant signature is captured electronically at time of application submittal. This application PDF must also be signed by the property owner(s) for all application types before the submittal will be accepted. The only exception to this is an informal review application that may be signed by the applicant(s) only. The applicant(s) and property owner(s) submit this application for review under the terms and provisions of the Bozeman Municipal Code. It is further indicated that any work undertaken to complete a development approved by the City of Bozeman shall be in conformance with the requirements of the Bozeman Municipal Code and any special conditions established by the approval authority. I acknowledge that the City has an Impact Fee Program and impact fees may be assessed for my project. Further, I agree to grant City personnel and other review agency representative's access to the subject site during the course of the review process (Section 38.200.050, BMC). I (We) hereby certify that the above information is true and correct to the best of my (our) knowledge. Certification of Completion and Compliance - I understand that conditions of approval may be applied to the application and that I will comply with any conditions of approval or make necessary corrections to the application materials in order to comply with municipal code provisions. Statement of Intent to Construct According to the Final Plan - I acknowledge that construction not in compliance with the approved final plan may result in delays of pccupancy or costs to correct noncompliance. Property Owner Signature: Printed Name:Zachery Gill CONTACT US Alfred M. Stiff Professional Building phone 406-582-2260 20 East Olive Street fax 406-582-2263 Bozemn, MT 59715 planning@bozeman.net www.bozeman.net/planning Justin Stewart Property Owner Rep Signature: