HomeMy WebLinkAbout26 - Development Agreements - RG 5400 Fowler LLC - Homestead at Buffalo Run Site Plan2878444
Sam a -Ga a i ouny M
Homestead atBuffaloRun SitePlan 21424
IMPROVEMENTS AGREEMENT
FOR THE HOMESTEAD AT BUFFALO RUN SITE PLAN APPLICATION
BOZEMAN,MONTANA
THIS AGREEMENT ismade and enteredintothis 2 dayof Joe ,2026,
by and between RG 5400 Fowler LLC,3400 Walnut Street,Suite 240,Denver,CO 80205,
hereinaftercalled the "Owner"and "Developer,"and the City of Bozeman,a Municipal
Corporation of the Stateof Montana,hereinaftercalledthe "City."
WHEREAS,it is the intentand purpose of the Developer to meet the conditionsof
approval of a SitePlan Applicationto allow constructionof a residentialdevelopment and related
siteimprovements on property located at:Phase 3 -3410 Edgerton Avenue,3380 Edgerton
Avenue,3385 Gabriel Avenue,3375 Gabriel Avenue,3435 Gabriel Avenue,3425 Gabriel
Avenue,and 3415 Gabriel Avenue and legallydescribed as N ½SW ¼SW ¼Section 23,
Township 02 South,Range 05 East of P.M.M.,City of Bozeman,GallatinCounty,Montana.
WHEREAS,itisthe intentof the Developer to obtainfinalroutingapproval forallnew
buildingsinphase 3,and
WHEREAS,itistheintentand purpose ofboth the Developer and the Citytohereby enter
into an Agreement which will guarantee the fulland satisfactorycompletion of the required
improvements on the propertyhereinafterdescribed;and itisthe intentof thisAgreement,and of
the partieshereto,to satisfythe improvements and guarantee requirements for the conditional
approval of saidSitePlan Application.
NOW,THEREFORE,inconsiderationofthe mutual covenants and conditionscontained
herein,itishereby agreed as follows:
1.Property Description
This Agreement pertainsto and includesthose propertieswhich are designatedas R-4_/
R-C_on the City ofBozeman Zoning Map,and identifiedas Phase 3 -3410 Edgerton Avenue,3380
Improvements Agreement Page 1
21424HomesteadatBuffaloRun SP
Homestead atBuffaloRun SitePlan 21424
Edgerton Avenue,3385 Gabriel Avenue,3375 Gabriel Avenue,3435 Gabriel Avenue,3425
GabrielAvenue,and 3415 GabrielAvenue and legallydescribedasN ½SW ¼SW ¼Section 23,
Township 02 South,Range 05 East of P.M.M.,City of Bozeman,GallatinCounty,Montana
2.Improvements
This Agreement specificallyincludesremaining landscaping and irrigationimprovements in the
Meadow Creek Park expansion with Phase 3 per the approved SitePlan Application#21424,and
Modification Applications#23106,24218,and 25018 as illustratedinthe attachedexhibit.
3.Financial Guarantee,Time for Completion of Improvements
Ifthe use of the structureisto occur priortocompletion of allrequiredon-siteimprovements,this
Improvements Agreement must be secured by a financialguarantee,as may be deemed acceptable
by the City,payable to the City of Bozeman,in an amount equal to one and one-halftimes the
estimated cost of the installationof any required improvements not completed at the time
occupancy of structuresisrequested.Improvements may be financiallyguaranteed with a letter
of creditor otheracceptableform of security.Said method of securityshallbe validfor a period
of not lessthan twelve (12)months.In any event,allrequiredimprovements shallbe completed
within nine (9)months of occupancy in orderto avoid defaulton the method of security.
4.Inspection
Representativesof the City shallhave the righttoenterupon theproperty at any reasonabletime
in order to inspectitand to determine ifthe Developer isin compliance with thisAgreement,and
theDeveloper shallpermit the City and itsrepresentativesto enterupon and inspectthe property
atany reasonabletime.
5.Default
Time isof the essenceforthisAgreement.IftheDeveloper shalldefaultinor failtofullyperform
any of itsobligationsin conformance with the time schedule under thisAgreement,and such
defaultor failureshallcontinue fora period of thirty(30)days afterwrittennoticespecifyingthe
defaultisdeposited in the United Statesmail addressed to the owner at RG 5400 Fowler LLC,
3400 Walnut Street,Suite240,Denver,CO 80205,or such otheraddress as the Developer shall
21424HomesteadatBuffaloRun SP
Flomestead atBuffaloRun SitePlan 21424
provide to the City from time to time,without being completely remedied,satisfied,and
discharged,the City may electto enforce any of the following specifiedremedies:
A)The City may,at itsoption,declarethe financialguarantee to be forfeitedand securethe
complete constructionand inspectionof the improvements describedherein.The City's
representative,contractors,and engineers shallhave the rightto enterupon the property
and perform such work and inspection,and the Developers shallpermit and secure any
additionalpermission requiredto enablethem to do so.
B)The City may enforceany otherremedy provided by law.
6.Indemnification
The Developer hereby expresslyagrees to indemnify and hold the City harmless forand against
allclaims,costsand liabilityof every kind and nature,forinjuryor damage receivedor sustained
by any person or entityin connection with,or on account of the performance of work at the
development siteand elsewhere pursuant tothisAgreement.The Developer furtheragreesto aid
and defend the City in the event thatitis named as a defendant in an action concerning the
performance of work pursuant to this Agreement except where such suitis brought by the
Developer.The Developer isnot an agent or employee of theCity.
7.Warranty
The Developer shallwarrant againstdefectsin theseimprovements fora period of one year from
the date of theirwrittenacceptance by the Governing Body.The Developer acknowledges that
the requiredlandscapingmust be maintained in a healthy,growing condition at alltimes.The
Developer isresponsibleforregularweeding,mowing of grass,irrigating,fertilizing,pruning,and
other maintenance of allplantingsas needed.Any plantthatdies must be replaced with another
livingplantthatcomplies with theapproved landscapeplan.The Developer hereby acknowledges
thatfailureto maintain requiredlandscapingina healthygrowing conditionatalltimes may result
in a code violation.
8.Governing Law and Venue
This Agreement shallbe construed under and governed by the laws of the Stateof Montana.In
21424HomesteadatBuffaloRun SP .
Homestead atBuffaloRun SitePlan 21424
the event of litigationconcerning thisAgreement,venue is in the Eighteenth JudicialDistrict
Court,GallatinCounty,Stateof Montana.
9.Attorney's Fees
In the event itbecomes necessary foreitherpartytothisAgreement toretainan attorneytoenforce
any of the terms or conditionsof thisAgreement,then the prevailingparty shallbe entitledto
reasonableattorney'sfeesand costs,to includethesalaryand costsof in-housecounsel including
City Attorney.
10.Modifications or Alterations
No modificationsor amendment of thisAgreement shallbe valid,unlessagreed to inwritingby
thepartieshereto.
11.Invalid Provision
The invalidityor unenforceabilityof any provision of thisAgreement shallnot affectthe other
provisions hereof,and thisAgreement shallbe construed in allrespectsas ifsuch invalidor
unenforceable provisionwere omitted.
12.No Assignment
Itis expresslyagreed that the Developer shallnot assign thisAgreement in whole,or in part,
without priorwrittenconsent of theCity.
13.Successors
Except as provided in paragraph 10,thisAgreement shallbe binding upon,ensure to the benefit
of,and be enforceableby the partiesheretoand theirrespectiveheirs,successorsand assigns.
mprevments Aeersent Page4
21424 HomesteadatBuffaloRun SP
Homestead atBuffaloRun SitePlan 21424
LANDOWNER
By:Drew Kraft £)
RG 5400 Fowler LLC,f
(On behalfof)(Capacity)
STATE OF44GNTANA-)
:ss
COUNTY OF
On this 2 day of ,2026,be o e me,th ndersigned,a Notary
Public forthe Stateof Montana,per nallyappearedfSP)AJ))d(a known tome tobe the
landowner thatexecuted the wi instrument,and acknowledged to me thatthey executed the
same as (insertcapacity)and on behalfof 5400 Fowler LLC.
IN WITNESS WHEREOF,I have hereunto setmy hand and affixedmy officialsealthe
day and year firstabove written.
(SEAL)Signatureand rinted e)
Notary Public or th9 Stateof
Residing at /
My Commissioi xpires:/A(
(Use four digitsforexpiration¼fear)
.iAMESGOUDf
ICFARYPUBUC
STATEOFCOLORADO
NOTARYID20164016598
MYcoMMISSONEXPIRESMAY08,.20A!
Improvements Agreement Page5
21424HomesteadatBuffaloRun SP
Homestead atBuaalo Run SitePlan 21424
THE CITY OF BOZEMAN
Erin George
DirectorCityof Bozeman Community Development
STATE OF MONTANA)
:ss
County of GALLATIN )
On this day of ca¾,2026,before me,a Notary Public forthe Stateof
Montana,personallyappeared Erin George,known to me to be the person described in and who
executed the foregoing instrumentas Directorof the City of Bozeman Department of Community
Development,whose name issubscribedtothewithin instrumentand acknowledged to me thathe
executed the same forand on behalfof saidCity.
IN WITNESS WHEREOF,I have hereunto setmy hand and affixedmy NotarialSeal the
day and year firstabove written.
(SEAL)(Signatureand Printedname)
Notary Public forthe Stateof Montana
X s2b'f-,SAMUEL L SAGSTETTER Residing atBozeman
fortheStat o ontana My Commission Expires:2 .21 O )
Residingat:(IJsefour digitsforexpirationyear)*.SEAL sozeman,Montana
My CommissionExpires:
December22,2026
21424HomesteadatBuffaloRun SP
Homestead atBuffaloRun SitePlan 21424
EXHIBIT A
Total Amount per estimate=$26,675.62
Total Amount guaranteed=$40,013.43
Phase 3 Remaining Park Improvements -Meadow Creek Park Expansion
mussmsform $asynes)PHASE3PAItK(INCLUDEITEMSIA57AND50UTHOFBACKOFCURBALONGKLNtt
AND6ASRIELSTREET)129400 GENERALCONDITIONSINCLUDINGMOOstlZATION,SUPERVISION 1.00 LS $25.738.39$25.738.39
32.80.005LEEVESOncludedmlrnganon 1.00 is $.$
329400 FINEGRAD4NG 9L194.00 5F $0.05$4,559.70
329400 TOPSOltPREP/SCREENONSITEMATERIAL5 1,689.00 CY $2500 $42,22500
329400 TOPWILPLACEMENT(6")1,689.00 CY $9.00$15,201.00
N/A TRA5HRECEPTACLESBYOTHERS $
3294.00LAND5CAPEMULDERS 5.00 EA $190.00$950,00
32.80.00IRRIGATIONINCLUOlMGitEINTOEXISTINGWELL 1.00 ta $137,385
32.9400 CRUSNERRNE5TRAILINTOEMISTINGPARK 1ßm.M So $1 $2.00
$2-91.008LUGRAS$MO ALONGNURKONVEANDGAONttAVENut 7,926.00 5F $$6,737.10
32.95.0080K100IRRGATEDOLUEGRAS5500MULTIUSEAREA 8,000,00 SP 6 00.00
$2.9100NATIVEGRASSREVEGETATION 75,268.00 SF 5 S 10,557.52
3293.00DECIOUOUSTREIS $$
1293.00 (2)2-1/2*CALSKYUNEHONEYLOCUST 2.00 (A $770.00$1,54000
32.93.00(2)2-1/2*NORTHERNREDOAK 2.00 EA $770s $1,54000
3293.00 (2)2-1/2*LITTLELEAFUNO(N 2.00 (A $770 $1,54000
32.93.00(2)2-1/2*OHIOBUCKEYE 2.00 EA $770 $1,54000
3293.00 (321/2*TURltl5HFILSERT 3,00 EA $770 $2,310.00
32.93.00(2}21/2*SUROAK 200 EA $770 $L54000
1293.00 (3)21/2*NORTHERNCATALPA 3.00 EA $770 $2r31000
N/A $TORMTECHSTRUCTUREBYOTH(R5 $
N/A CONCRETEPAD5ANOBENCHESBYOTHERS $
N/A WOOORAllFENCEANDGATE58YOTHER5 $
N/A BA5KETBALLCOURTANOEQUIPMENTBYOTHERS $
N/A CONCRETE(58DEWALK5BYOTHERS)$
$26,675.62
Improvements Agreement Page 7
21424HomesteadatBuffaloRun SP
Homestead atBuffaloRun SitePlan 21424
Improvements Agreement Page 8
21424HomesteadatBuffaloRun SP