HomeMy WebLinkAboutComplete_with_Docusign_25703_Findings_of_Fac25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 1 of 26
25703 Gran Cielo Phase 3 Subdivision Preliminary Plat
Public Meeting/Hearing Dates:
Planning Board meeting was held Monday, April 6, 2026 at 6:00 pm.
City Commission meeting was held Tuesday, April 21, 2026 at 6:00 pm
Project Description: A preliminary plat requesting to subdivide four lots in block 14 of Gran
Cielo Subdivision Phase 2 into a major subdivision for residential and open space uses.
42 single household and townhome lots and are proposed to replace 4 multi-household
(apartment use) lots, with 1 open space lot set aside for a stormwater pond. One lot at the
southeast corner of the block will be subject to a further development application and is
intended to be built with rowhouses. Additional uses of land within the subdivision
include an extension of S. 28th Avenue north through the block from Bennett Boulevard
to Apex Drive, and an east-west pedestrian pathway between South 29th Avenue to South
27th Avenue. The subject property is zoned R-5.
This application was deemed complete prior to the February 1, 2026 effective date of the
repeal and replace of Chapter 38 of the Bozeman Municipal Code (BMC) also known as
the 2025 Unified Development Code (2025 UDC). This project is subject to the standards
and review procedures of the UDC in effect prior to February 1, 2026.
Project Location: Addresses TBD, northwest of the corner of South 27th Avenue and Bennett
Boulevard, South of Apex Drive, and East of South 29th Avenue.
Staff Finding: The application conforms to standards and is sufficient for approval with
conditions and code provisions.
Recommended Planning Board Motion: Having reviewed and considered the application
materials, public comment, and all the information presented, I hereby adopt the findings
presented in the staff report for application 25703 and move for the Community
Development Board in its capacity as the Planning Board to recommend approval of the
subdivision with conditions and subject to all applicable code provisions.
Recommended City Commission Motion: Having reviewed and considered the application
materials, public comment, and all the information presented, I hereby adopt the findings
presented in the staff report for application 25703 and move to approve the subdivision
with conditions and subject to all applicable code provisions.
Report Date: May 11, 2026
Staff Contact: Danielle Garber, Senior Planner
Alicia Paz-Solis, Project Engineer
Agenda Item Type: Consent (Quasi-judicial)
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 2 of 26
EXECUTIVE SUMMARY
This report is based on the application materials submitted and public comment received to date.
The application materials are available in the City’s Laserfiche archive and may be accessed
through the Community Development viewer.
Unresolved Issues.
There are no unresolved issues with this application.
Project Summary
The Department of Community Development received a Preliminary Plat Application on
November 26, 2025 requesting a major subdivision to further subdivide Lots 1-4 and Common
Open Space C of Block 14 of Gran Cielo Subdivision Phase 2 into 42 lots. The subject property
is zoned R-5 (Residential High Density District).
This land was previously reviewed under the following applications:
• 17522 Gran Cielo Major Subdivision Preliminary Plat (external link to the Finding of
Facts and Order signed July 16, 2018)
• 19219 Gran Cielo Major Subdivision Preliminary Plat (external link to the online
document repository for this project)
Application 17522 provided the primary review for the Gran Cielo Major Subdivision and the
findings of fact was signed in July of 2018. On February 1, 2019, Application 19219 was
submitted for changes requested to the amount of provided parkland and park design. The
proposed changes under application 19219 were reviewed at a public hearing on September 23,
2019 and the Findings of Fact and Order was signed on November 4, 2019. All required
infrastructure has been constructed or financially guaranteed and subsequent final plat
applications have been reviewed and recorded for all proposed lots in the subdivision under the
following applications:
• 19472 Gran Cielo Subdivision Phase 1 Final Plat
• 20362 Gran Cielo Subdivision Phase 1A Final Plat
• 21414 Gran Cielo Subdivision Phase 2 Final Plat.
This subsequent major subdivision is located in Phase 2 and the recorded Phase 2 Final Plat may
be viewed in the city’s online document repository under document 003 – Existing Recorded
Plat.
This subdivision represents a change of use from multi-household residential lots, subject to
subsequent site plan review, to single household and townhome/rowhome lots. Lot lines will be
added to further subdivide the most recently platted four large lots into smaller building permit
ready lots. All proposed lots meet the minimum lot area and width standards required in Section
38.320.030 of the Bozeman Municipal Code (BMC) for the proposed uses.
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 3 of 26
The subject property was also reviewed previously as a multi-household development on each of
the four lots under the Gran Cielo Block 14 Master Site Plan, application 22389, and subsequent
Gran Cielo Block 14 Phase 1 and Phase 2 site plans, under applications 22391 and 24029. The
master site plan received final approval and the phase 1 site plan application received
preliminary approval on April 8, 2024. With this subsequent major site plan application these
applications will be withdrawn. Previous payments for water adequacy will be applied as a credit
per code provision 4 below.
South 27th and South 29th Avenues, Bennett Boulevard and Apex Drive adjacent to Block 14
have already been constructed and accepted by the City. This application proposes to extend
South 28th Avenue, currently constructed south of Bennett Boulevard into the property to provide
legal and physical access interior to the block. As previously approved with Gran Cielo Phase 2,
an east-west pedestrian corridor will be utilized via easement to mitigate block length and
connect pedestrians between 27th Avenue and 29th Avenue. The previously approved 30-foot
wide public trail easement will be vacated, and a new 10-foot wide pedestrian easement will be
dedicated with this application, slightly north of the existing easement. This approach is
consistent with BMC 38.410.040.D which allows right-of-way for pedestrians in lieu of a street
to be at least 10-feet wide, see code provision 8 below.
Water and sewer mains serving the subject property exist in all streets surrounding the block.
The applicant proposes water and sewer main extensions from Bennett Boulevard, Apex Drive,
South 27th and South 28th Avenues, and through three proposed alleys located within the
subdivision. Providing utility service through proposed alleys minimizes impacts to existing
infrastructure by avoiding the construction of multiple utility service stubs within existing paved
streets. Due to the proposed presence of water and sewer mains, the alleys are proposed to have a
platted width of 30-feet to meet the City’s utility easement width requirements that allow for
adequate space for long-term access and maintenance of public utilities. Code provision 3.b
requires long term funding for private maintenance of alleys that contain city utility
infrastructure.
No phasing is proposed. The site does not contain surface water or wetlands, existing vegetation,
or public lands.
Pre-application review was completed on October 1, 2025. BMC 38.220.060.A requires
documentation of compliance with adopted standards unless waivers have been granted during
the pre-application process. Waivers were granted from the following documentation
requirements: Floodplains; Groundwater; Geology Soils, Slopes; Vegetation; Wildlife; and
Agriculture. Waivers were not requested or not granted for the following documentation
requirements: Surface water; Agricultural water user facilities; Water and sewer; Stormwater
management; Streets, roads, and alleys; Non-municipal utilities; Land use; Parks and recreation;
Neighborhood center; Lighting plan; Miscellaneous; Affordable housing; and growth policy
compliance. Documentation of compliance for the categories not waived can be found in the
application documents folder.
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 4 of 26
On January 30, 2026 the Development Review Committee (DRC) found the application
sufficient for continued review and recommends the conditions and code provisions identified in
this report.
On April 6, 2026 the Community Development Board (CDB), acting in its capacity as the
Planning Board considered the application and provided a unanimous 6-0 recommendation for
approval. Board Member Egnatz asked staff questions related to subsequent building permits and
review processes for meeting minimum densities following the subdivision creation under the
recently adopted 2025 UDC. Staff responded that minimum density would not be revisited for
most of the subdivision since the application proposes primarily single household lots that are
not subject to further plan review. No public comment was provided at the meeting.
The subdivider did not request any variances with this application. As of the writing of this
report one letter of public comment has been received from J. Bennett on March 17, 2026 in
support of the proposed subdivision.
The final decision for this preliminary plat must be made by April 27, 2026 or 60 working days
from the sufficiency date per BMC 38.240.100 and MCA 76-3-616 for exempt subdivisions.
On April 21, 2026, the City Commission voted unanimously 5-0 to approve consent agenda
items G.1 – G.7. This subdivision was approved with that vote as agenda item G.5. No
discussion was provided. A video of the City Commission meeting may be viewed on the City’s
streaming website. No public comment was received.
Alternatives
1. Approve the application with the recommended conditions;
2. Approve the application with modifications to the recommended conditions;
3. Deny the application based on the Commission’s findings of non-compliance with the
applicable criteria contained within the staff report; or
4. Continue the public meeting on the application, with specific direction to staff or the
subdivider to supply additional information or to address specific items.
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 5 of 26
TABLE OF CONTENTS
EXECUTIVE SUMMARY .........................................................................................................2
Unresolved Issues. ...........................................................................................................2
Project Summary .............................................................................................................2
Alternatives .....................................................................................................................4
SECTION 1 – MAP SERIES ......................................................................................................6
SECTION 2 – REQUESTED VARIANCES ............................................................................. 10
SECTION 3 – RECOMMENDED CONDITIONS OF APPROVAL ......................................... 10
SECTION 4 – CODE REQUIREMENTS ................................................................................. 10
SECTION 5 – RECOMMENDATION AND FUTURE ACTIONS ........................................... 14
SECTION 6 – STAFF ANALYSIS and findings ....................................................................... 14
Applicable Subdivision Review Criteria, Section 38.240.150.B, BMC. .......................... 14
Documentation of compliance with adopted standards 38.220.060 ................................. 17
SECTION 7 - FINDINGS OF FACT, ORDER AND APPEAL PROVISIONS ......................... 21
APPENDIX A – PROJECT SITE ZONING AND GROWTH POLICY .................................... 23
APPENDIX B – DETAILED PROJECT DESCRIPTION ......................................................... 25
APPENDIX C – NOTICING AND PUBLIC COMMENT ........................................................ 25
APPENDIX D – OWNER INFORMATION AND REVIEWING STAFF ................................ 25
FISCAL EFFECTS ................................................................................................................... 25
ATTACHMENTS ..................................................................................................................... 25
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 6 of 26
SECTION 1 – MAP SERIES
Exhibit 1 – Zoning
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 7 of 26
Exhibit 2 – Future Land Use Map (2025)
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 8 of 26
Exhibit 3 – Proposed Preliminary Plat for Block 14
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 9 of 26
Exhibit 4 – Existing Recorded Lots, Block 14 Gran Cielo Phase 2
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 10 of 26
SECTION 2 – REQUESTED VARIANCES
No variances are requested with this application.
SECTION 3 – RECOMMENDED CONDITIONS OF APPROVAL
Please note that these conditions are in addition to any required code provisions identified in this
report. These conditions are specific to this project.
Recommended Conditions of Approval:
1. The plat shall conform to all requirements of the Bozeman Municipal Code and the Uniform
Standards for Subdivision Plats (Uniform Standards for Certificates of Survey and
Subdivision Plats (24.183.1104 ARM) and shall be accompanied by all required documents,
including certification from the City Engineer that as-built drawings for public improvements
were received, a platting certificate, and all required and corrected certificates. The Final Plat
application shall include one (1) signed reproducible copy on a 3 mil or heavier stable base
polyester film (or equivalent). The Gallatin County Clerk & Recorders office has elected to
continue the existing medium requirements of 1 mylar with a 1 binding margin on one side
for both plats and COSs. The Clerk and Recorder will file the new Conditions of Approval
sheet as the last same sized mylar sheet in the plat set
2. The applicant shall submit with the application for Final Plat review and approval, a written
narrative stating how each of the conditions of preliminary plat approval and noted code
provisions have been satisfactorily addressed. This narrative shall be in sufficient detail to
direct the reviewer to the appropriate plat, plan, sheet, note, covenant, etc. in the submittal.
3. The subject property is located within the Meadow Creek Subdivision Sewer Payback. If the
subject property did not participate in the original cost of construction of improvements the
subject property will be assessed a payback charge prior to final plat approval.
SECTION 4 – CODE REQUIREMENTS
1. Sec. 38.100.080 – Compliance with regulations required. The applicant is advised that
unmet code provisions, or code provisions that are not specifically listed as conditions of
approval, does not, in any way, create a waiver or other relaxation of the lawful requirements
of the Bozeman Municipal Code or state law.
2. Sec. 38.220.070.A.3 Noxious Weeds. Prior to final plat approval, a memorandum of
understanding must be entered into by the weed control district and the developer. The
memorandum of understanding must be signed by the district and the developer prior to final
plat approval, and a copy of the signed document must be submitted to the com-munity
development department with the application for final plat approval.
3. Sec. 38.220.310, and 320. Property owners’ association. Updated Property owners’
association (POA) documents including covenants must be provided with the final plat prior
to being finalized and recorded. The POA documents must include the requirements of BMC
38.220.310, and 320 where applicable. Additionally, the following must be included:
a. In accordance with BMC 38.270.090, the subdivision stormwater maintenance plan
must clearly state that the Property Owners’ Association, as recorded in the CC&Rs,
must be responsible for maintenance of all permanent and temporary stormwater
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 11 of 26
management facilities located outside of the public right-of-way. The approved
stormwater plan must be incorporated into the Property Owners’ Association governing
documents, and documentation demonstrating inclusion of the stormwater maintenance
plan must be provided prior to final plat approval.
b. The applicant must provide a permanent funding source, such as the levying of
assessments against all properties within the development, for alley maintenance where
alleys in the development are designed to accommodate public utility lines and other
infrastructure. The alleys in the proposed subdivision functioning as privately
maintained public streets for the purposes of utility conveyance must provide the
required documentation detailed in BMC 38.400.020.A.2 prior to final plat approval.
4. Sec. 38.410.130 - Water adequacy. Water adequacy and payment of any remaining cash-in-
lieu of water rights (CILWR) is required prior to final plat approval. A CILWR credit of 5.24
acre-fee, paid with Gran Cielo Block 14 Ph 1 SP, application number 22391, is available to
be applied to the offset, however no other credit for the property has been found. If the owner
is aware that additional CILWR was paid, please provide evidence of the payment and the
application(s) it was paid under. The applicant must provide the annual irrigation water
requirement. The preliminary estimate for the subdivision is 12.67acre-feet however, the
estimate can't be finalized until the irrigation demand is provided and verified by the
City's Water Conservation Division. The demand must be offset prior to final plat approval.
5. Sec. 38.220.070.8—Conditions of approval. A sheet(s) of the plat depicting conformance
with subdivision application approval must be submitted as set forth in 24.183.1107 ARM as
may be amended and as required by the county clerk and recorder, and must: Be entitled
"Conditions of Approval of [insert name of subdivision]" with a title block including the
quarter-section, section, township, range, principal meridian, county, and, if applicable, city
or town in which the subdivision is located.
a. Contain any text and/or graphic representations of requirements by the governing body
for final plat approval including, but not limited to, setbacks from streams or riparian
areas, floodplain boundaries, no-build areas, building envelopes, or the use of particular
parcels.
b. Include a certification statement by the landowner that the text and/or graphics shown
on the conditions of approval sheet(s) represent(s) requirements by the governing body
for final plat approval and that all conditions of subdivision application have been
satisfied.
c. Include a notation stating that the information shown is current as of the date of the
certification, and that changes to any land-use restrictions or encumbrances may be
made by amendments to covenants, zoning regulations, easements, or other documents
as allowed by law or by local regulations.
d. Include a notation stating that buyers of property should ensure that they have obtained
and reviewed all sheets of the plat and all documents recorded and filed in conjunction
with the plat, and that buyers of property are strongly encouraged to contact the local
community development department and become informed of any limitations on the
use of the property prior to closing.
e. List all associated recorded documents and recorded document numbers.
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 12 of 26
f. Include a tabulation of parkland credit for the entire subdivision and attributed to each
lot.
g. Include a tabulation of open space. List easements, including easements for agricultural
water user facilities.
h. In addition, the applicant must add a note to the conditions of approval sheet of the plat
that:
i. The maintenance of all stormwater facilities, including stormwater facilities
within the park parcels, is the responsibility of the property owners’ association
(POA).
ii. No crawl spaces will be permitted with future development of the site, unless a
professional engineer registered in the State of Montana certifies that the lowest
point of any proposed structure is located above the seasonal high groundwater
level and provide supporting groundwater data prior to the release of building
permit. In addition, sump pumps are not allowed to be connected to the sanitary
sewer system.
iii. Sump pumps are also not allowed to be connected to the drainage system unless
capacity is designed into the drainage system to accept the pumped water. Water
from sump pumps may not be discharged onto streets, such as into the curb and
gutters where they may create a safety hazard for pedestrians and vehicles.
iv. Include a notation stating that topsoil depth and topsoil quality requirements
must be met on all future subdivided lots prior to installation of landscaping and
irrigation, as outlined in the most recent version of the City of Bozeman
Landscape and Irrigation Performance and Design Standards Manual.
v. Lot access must be constructed to the standard set forth by the City of Bozeman
Design Standards and Specifications Policy, and the City of Bozeman
Modifications to the Montana Public Works Standard Specifications per
Bozeman Municipal Code Requirements.
vi. This subdivision is exempt from parkland dedication per Sec. 38.420.020.B.5
BMC.
6. Sec. 38.240.410 through 38.240.540 – Plat certificates. The language contained in the
certificates on the final plat must follow the language in the corresponding certificates in this
code section. Since the final plat application is a separate application and will be subject to
the new 2025 UDC text and subdivision procedures when submitted, please also reference
BMC 38.750.150 (effective February 1, 2026).
7. Sec. 38.360.280 – Agricultural water user facilities. Prior to final plat approval, or City
infrastructure approval, whichever occurs first, the applicant must obtain and provide written
consent from the ditch owner for any proposed encroachment to ditch easements, including
proposed street and sidewalk construction within South 27th Avenue and immediately
adjacent to the west-side of South 27th Avenue.
8. Sec. 38.410.040.D – Rights-of-way for pedestrians. Rights-of-way not less than ten feet
wide for pedestrian walks are required where deemed necessary to provide circulation or
access to parks, open space, schools, playgrounds, shopping centers, transportation, and other
community facilities. In addition, no continuous length of block may exceed 600 feet without
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 13 of 26
intersecting a street or pedestrian walk. The proposed east-west pedestrian sidewalk is
required to be installed and landscaped with the subdivision improvements. Pedestrian walks
must be constructed as a city standard sidewalk and comply with the provisions of section
38.400.080. The pedestrian walk must be maintained by the adjacent property owners’
association.
9. Sec. 38.410.060 - Easements. All easements must be described, dimensioned and shown on
the final plat in their true and correct location. In addition to the utility and pedestrian
easements depicted with this preliminary plat application, prior to final plat approval the
applicant must provide the following:
a. Sec. 38.410.060.D – Easements for agricultural water user facilities. An agricultural
water user easement meeting the requirements of 38.410.060.D must be recorded prior
to final plat approval for all ditches on the property and within South 27th Ave that may
convey water rights.
10. Sec. 38.410.080 – Grading and drainage. The developer must install complete drainage
facilities in accordance with the requirements of the state department of environmental
quality and the city and must conform to any applicable facilities plan and the terms of any
approved site-specific stormwater control plan. The city's requirements are contained in the
Design Standards and Specifications Policy and the City of Bozeman Modifications to
Montana Public Works Standard Specifications, and by this reference these standards are
incorporated into and made a part of these regulations.
a. Prior to final infrastructure approval, the applicant must submit final stormwater facility
layouts and routing documentation in accordance with DCS Chapter 6 (Stormwater)
and DCS Section 2.2.3 (Stage 3 – Final Infrastructure Review). Final layout for
facilities located within or draining public right-of-way such as the S. 27th Avenue
proposed stormwater retention pond, S. 28th Avenue boulevard infiltrator, and Apex
Pond must be coordinated with future roadway sections, pedestrian facilities, and utility
alignments.
b. Prior to final infrastructure approval, the applicant must provide final stormwater
conveyance design in accordance with DCS Chapter 6, including specific inlet and
structure locations, evaluation of inlet spacing and corner capture, and confirmation of
roadway conveyance sizing. This review must include an evaluation of whether
additional or dual inlets are required, particularly along South 27th Avenue.
c. Prior to final infrastructure approval, the applicant must submit a final Operations and
Maintenance Plan in accordance with DCS Chapter 6 that reflects the final approved
infrastructure plans, constructed stormwater facility materials and configurations. The
final plan must also clearly define long-term maintenance responsibilities, inspection
activities, sediment removal approach, and maintenance access provisions, including
identification of any required access or drainage easements necessary for City access to
stormwater facilities that drain public right-of-way.
11. Sec. 38.550.070 – Landscaping of public lands. Landscaping in boulevards adjacent to
open space parcels, landscaping within open space parcels, landscaping through mid-block
crossings, and boulevard landscaping adjacent to arterial and collector streets is required to
be installed or financially guaranteed prior to final plat approval. Additionally:
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 14 of 26
a. Rock mulch is prohibited around public boulevard trees. Public boulevard trees must
have a 3' diameter wood mulch ring 3"-4" in depth. Include a note this process will be
followed during construction. See "City of Bozeman Landscape and Irrigation
Performance and Design Standards Manual" Section 3.2.1 "Landscape Design
Standards", "Tree Requirements Outside of Parking Lots and Boulevards", 3).
SECTION 5 – RECOMMENDATION AND FUTURE ACTIONS
The Development Review Committee (DRC) determined the application was sufficient for
continued review and recommended approval with conditions on January 30, 2026.
Planning Board meeting was held Monday, April 6, 2026 at 6:00 pm
City Commission meeting was held Tuesday, April 21, 2026 at 6:00 pm
SECTION 6 – STAFF ANALYSIS AND FINDINGS
Analysis and resulting recommendations are based on the entirety of the application materials,
municipal codes, standards, plans, public comment, and all other materials available during the
review period. Collectively this information is the record of the review. The analysis in this
report is a summary of the completed review.
Applicable Subdivision Review Criteria, Section 38.240.150.B, BMC.
In considering applications for subdivision approval under this title, the advisory boards and City
Commission shall consider the following:
1) Compliance with the survey requirements of Part 4 of the Montana Subdivision and
Platting Act
The preliminary plat was prepared in accordance with the surveying and monumentation
requirements of the Montana Subdivision and Platting Act by a Professional Engineer registered
in the State of Montana. As noted in the code requirements, the final plat must comply with State
statute, Administrative Rules of Montana, and the Bozeman Municipal Code.
2) Compliance with the local subdivision regulations provided for in Part 5 of the Montana
Subdivision and Platting Act
The final plat must comply with the standards identified and referenced in the Bozeman
Municipal Code. The subdivider is advised that unmet code provisions, or code provisions not
specifically listed as a condition of approval, do not, in any way, create a waiver or other
relaxation of the lawful requirements of the Bozeman Municipal Code or State law. Sections 3
and 4 of this report identify conditions and code provisions necessary to meet all municipal
standards. The listed code requirements address necessary documentation and compliance with
standards. Therefore, upon satisfaction of all conditions and code corrections the subdivision will
comply with the subdivision regulations.
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 15 of 26
3) Compliance with the local subdivision review procedures provided for in Part 6 of the
Montana Subdivision and Platting Act
The Bozeman Planning Board public meeting and City Commission public hearings are properly
noticed in accordance with the Bozeman Municipal Code. Based on the recommendation of the
Development Review Committee (DRC) and other applicable review agencies, as well as any
public testimony received on the matter, the City Commission will make the final decision on the
subdivider’s request. Review of this subdivision was conducted under the terms of 76-3-616
MCA as authorized in 38.240.100.
The Department of Community Development received a preliminary plat application on
November 26, 2025. The DRC reviewed the preliminary plat application and determined the
submittal was sufficient to allow for the continued review of the proposed subdivision.
On January 30, 2026 the Development Review Committee (DRC) found the application
sufficient for continued review and recommends the conditions and code provisions identified in
this report.
The applicant posted public notice on the subject property on March 13, 2026. The applicant
sent public notice to all landowners of record within 200-feet of the subject property via first
class mail, on March 13, 2026. As of the date of the writing of this report, one letter of public
comment was received in support of the subdivision proposal from J. Bennett on March 17,
2026.
On March 31, 2026 a major subdivision staff report was completed and forwarded with a
recommendation of conditional approval for consideration to the Planning Board on April 6, 2026.
On April 6, 2026 the Community Development Board (CDB), acting in its capacity as the
Planning Board considered the application and provided a unanimous 6-0 recommendation for
approval. Board Member Egnatz asked staff questions related to subsequent building permits and
review processes for meeting minimum densities following the subdivision creation under the
recently adopted 2025 UDC. Staff responded that minimum density would not be revisited for
most of the subdivision since the application proposes primarily single household lots that are
not subject to further plan review. No public comment was provided at the meeting.
On April 9, 2026 a major subdivision staff report was completed and forwarded with a
recommendation of conditional approval for the City Commission decision on April 21, 2026.
On April 21, 2026, the City Commission voted unanimously 5-0 to approve consent agenda
items G.1 – G.7. This subdivision was approved with that vote as agenda item G.5. No
discussion was provided, and no public comment was received. A video of the City Commission
meeting may be viewed on the City’s streaming website.
4) Compliance with Chapter 38, BMC and other relevant regulations
Community Development staff and the DRC reviewed the preliminary plat against all applicable
regulations and the application complies with the BMC and all other relevant regulations with
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 16 of 26
conditions and code corrections. This report includes Conditions of Approval and required code
provisions as recommended by the DRC for consideration by the City Commission to complete
the application processing for final plat approval. All municipal water and sewer facilities will
conform to the regulations outlined by the Montana Department of Environmental Quality and
the requirements of the Design Standards and Specifications Policy (DSSP) and the City of
Bozeman Modifications to Montana Public Works Standard Specifications.
Water/sewer –Document 028 contains the supplementary capacity and design memo prepared
by the applicant for existing infrastructure and new water and sewer mains. This memo was
reviewed by the Engineering Division for compliance with state and local Public Works
Standard Specifications, the City’s design standards, the City of Bozeman Water Facility Plan
and was found to meet City’s review requirements. Adequate water distribution systems and
capacity, and sewage collection and disposal capacity exist to serve the subdivision. Detailed
utility design will be further evaluated during the infrastructure review stage by the Engineering
Division. Code provision 4 requires the applicant offset estimated water demand prior to final
plat approval per subsection D of BMC 38.410.130. Per this section, the applicant must provide
payment of cash-in-lieu of water rights at a rate established by the most recent City Commission
resolution.
Easements - The final plat must provide and depict all necessary utilities and required utility
easements. Public utilities are already located within dedicated street right of ways, with extensions
proposed within South 28th Avenue and dedicated alleys. Additional easements are required for an
agricultural user facility. 10-foot front yard utility easements are depicted on the preliminary plat
and are proposed to be granted with the final plat in accordance with standards. See code provision
9 for easement requirements.
Parks – No additional parkland is required per BMC 38.420.020.B.5 – Land dedication or its
equivalent cash donation in-lieu of land dedication must not be required for a development for
which the required amount of parkland is shown to have already been provided. The maximum
parkland dedication for the underlying subdivision was provided with the initial phase of Gran
Cielo. The city’s parks planner reviewed the application for compliance with parkland
requirements and determined that no additional parkland is triggered by the additional lot lines.
A developed public park constructed with the initial phase of Gran Cielo exists to the south of
the subject property and is accessible via existing public sidewalks.
Stormwater – Document 029 contains a draft stormwater management and design report. The
design report will be finalized during the infrastructure review phase by the Engineering
Division. The subject property contains existing stormwater infrastructure constructed for Gran
Cielo Subdivision Phase 2, including the existing Apex Pond detention facility. This detention
pond is currently located in the northwest corner of the subject property and is platted as
Common Open Space C (see exhibit 4 depicting the existing recorded plat). This application
proposes redesigning the detention pond to updated stormwater requirements, including
modifications to storage and outlet controls structures, and adding additional stormwater capacity
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 17 of 26
with the 27th Avenue right-of-way to accommodate runoff from new public improvements. The
applicant provided calculations to ensure that the previous allocated capacity to the larger
subdivision was accounted for, as well as demand from newly proposed public infrastructure.
This report was reviewed by the Engineering Division for compliance with state and local Public
Works Standard Specifications, the City’s design standards, and was found to preliminarily meet
code requirements with code provision 10 outlining remaining review requirements with the final
layout. Code provision 3 requires the property owners’ association to maintain all stormwater
facilities outside of the public right-of-way and to incorporate an updated maintenance plan into
the association documents prior to final plat approval. This will ensure the proper maintenance of
necessary stormwater infrastructure after the subdivision is fully built out.
Police/Fire – The City of Bozeman’s Police and Fire emergency response area includes this
subject property. The subdivision does not impact the City’s ability to provide emergency
services to the subject property. The necessary addresses will be provided to enable 911 response
to individual parcels prior to recording of the final plat. Required fire hydrants exist to serve the
2 proposed lots.
5) The provision of easements to and within the subdivision for the location and installation
of any necessary utilities
The final plat will provide and depict all necessary utilities and required utility easements. 10-
foot front yard utility easements are depicted on the preliminary plat and are proposed to be
granted with the final plat in accordance with standards.
6) The provision of legal and physical access to each parcel within the subdivision and the
notation of that access on the applicable plat and any instrument transferring the parcel
The final plat will provide legal and physical access to each parcel within the subdivision. The
new proposed lots have access from all existing streets, as well as proposed alleys and the
proposed extension of South 28th Avenue into the subject property. All lots are designed with at
least 25-feet of frontage on a public street and/or a public street and an improved alley as
required in BMC 38.400.090.
Documentation of compliance with adopted standards 38.220.060
The Development Review Committee (DRC) completed a subdivision pre-application plan
review on October 1, 2025 and no variances were requested. Waivers were granted as indicated
in each section below.
Staff offers the following summary comments on the documents required with Article
38.220.060, BMC.
38.220.060.A.1 – Surface water
No surface water is present within the subject property. The applicant provided a letter from
Sundog Ecological, Inc. dated January 21, 2026 documenting existing nearby surface water and
wetlands previously delineated in 2024 and 2025. This letter can be viewed under application
document 020. Per this letter, “No waterway or wetlands were observed along the [South] 27th
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 18 of 26
Avenue Expansion corridor from 300 feet south of Bennett Boulevard to the north side of Apex
Drive.” A lateral of the Middle Creek canal flows from south to north along the eastern boundary
and crosses the northeast corner of the subject property. Per the applicant’s surface water
documentation “A short section of the ditch was previously re-aligned and piped under South
27th avenue. Improvements to South 27th avenue and the installation of a water main will occur
within close proximity to the piped section of the ditch, and thus Middle Creek Ditch Company
was notified per BMC 38.360.280.B.” See a further discussion of agricultural water user
facilities below.
38.220.060.A.2 - Floodplains
No flood hazards were evaluated during review of this application. Documentation of this
standard was waived with the pre-application review.
38.220.060.A.3 - Groundwater
A geotechnical investigation was conducted during the initial preliminary plat review under
Application No. 17522. A new report was not required with this application. Condition of
Approval 1 on the original recorded Gran Cielo Subdivision Phase 2 plat limits the construction
of crawlspaces or basements due to seasonal high groundwater tables present at the subject
property. Code provision 5 requires a conditions of approval page to be added to the proposed
plat for final plat review. The applicant must add the following notes: No crawl spaces will be
permitted with future development of the site, unless a professional engineer registered in the
State of Montana certifies that the lowest point of any proposed structure is located above the
seasonal high groundwater level and provide supporting groundwater data prior to the release of
building permit. In addition, sump pumps are not allowed to be connected to the sanitary sewer
system; and Sump pumps are also not allowed to be connected to the drainage system unless
capacity is designed into the drainage system to accept the pumped water. Water from sump
pumps may not be discharged onto streets, such as into the curb and gutters where they may
create a safety hazard for pedestrians and vehicles. Documentation of this standard was waived
with the pre-application review.
38.220.060.A.4 - Geology, Soils and Slopes
This subdivision will not significantly impact the geology, soils or slopes. No significant
geological features or slopes exist on the site. A new geotechnical investigation report was not
required with this application. Documentation of this standard was waived with the pre-
application review.
38.220.060.A.5 - Vegetation
There is no significant vegetation on the subject property aside from naturally occurring grasses
and ground cover. The subject property is currently used for construction staging for the larger
development. Noxious weeds must be controlled and a memorandum of understanding must be
signed by the weed control district and the developer final to final plat approval. Documentation
of this standard was waived with the pre-application review.
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 19 of 26
38.220.060.A.6 - Wildlife
Subdivision of a previously subdivided block located entirely within an urban setting will not
significantly impact wildlife. Residential development already exists along the southern
boundary and the subject property has been actively used for construction staging for some
years. Documentation of this standard was waived with the pre-application review.
38.220.060.A.7 - Agriculture
This subdivision will not impact agriculture. No agricultural activities are conducted on the site.
Documentation of this standard was waived with the pre-application review.
38.220.060.A.8 - Agricultural Water User Facilities
A lateral of the Middle Creek canal flows from south to north along the eastern boundary and
crosses the northeast corner of the subject property. Per the applicant’s surface water
documentation “A short section of the ditch was previously re-aligned and piped under South
27th Avenue. Improvements to South 27th Avenue and the installation of a water main will occur
within close proximity to the piped section of the ditch, and thus Middle Creek Ditch Company
was notified per BMC 38.360.280.B.” Per City requirements, the applicant is required with code
provision 7 to obtain and provide written consent from the ditch owner for any new
encroachment within the ditch easement, including the proposed South 27th Avenue sidewalk or
any related improvement. Code provision 9.a requires easements for agricultural water user
facilities be provided prior to final plat approval for all ditches on the property and within South
27th Avenue that may convey water rights.
38.220.060.A.9 - Water and Sewer
See discussion above under primary review criteria. Water and sewer mains serving the subject
property exist in all streets surrounding the block. The applicant proposes water and sewer main
extensions from Bennett Boulevard, Apex Drive, and South 27th Avenue partially within the new
extension of South 28th Avenue, but mainly within 3 alleys proposed with the subdivision.
Adequate water distribution systems and capacity, and sewage collection and disposal capacity
exists to serve the subdivision. Detailed utility design will be further evaluated during the
infrastructure review stage by the Engineering Division.
38.220.060.A.10 - Stormwater Management
The subdivision will modify the existing detention pond to comply with recently adopted
stormwater design standards, and to add additional stormwater capacity with the South 27th
Avenue right-of-way. See the discussion above under primary review criteria.
38.220.060.A.11 - Streets, Roads and Alleys
The subdivision will not significantly impact the City’s street infrastructure. Local street access
is existing and proposed to be expanded. South 27th and South 29th Avenues, Bennett Boulevard
and Apex Drive adjacent to Block 14 have already been constructed and accepted by the City.
This application proposes to extend South 28th Avenue, currently constructed south of Bennett
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 20 of 26
Boulevard into the property to provide legal and physical access interior to the block. As part of
this subdivision, South 27th Avenue must be improved along the project frontage (Apex to
Bennett Boulevard) to meet the City’s collector street section standards. This will ensure the
corridor develops consistently and has the appropriate long-term capacity. Document 030
contains the 2017 Gran Cielo Subdivision traffic impact study (TIS) and an updated TIS dated
November 21, 2025 prepared by a professional engineer licensed with the State of Montana. The
updated TIS provided a comparison of this new subdivision layout, lot count, and projected
traffic generation characteristics to the original study. Per the new TIS “This update is necessary
due to substantial changes in the roadway network west of South 19th Avenue since the original
TIS, including the construction of South 27th Avenue between Stucky Road and West Graf
Street.” The TIS details traffic capacity data for existing conditions, as well as projected trip
generation utilizing accepted ITE manuals, and found that “the updated estimates indicate a 23
percent reduction in projected trips. This decrease is primarily due to revised assumptions
reflecting lower development density and updated trip generation rates from the latest ITE
manual. These updated projections offer a more accurate representation of anticipated traffic
volumes associated with the full buildout of Phase 3.” Additionally, “The Bozeman TMP
[Transportation Master Plan] recommends to widen Stucky Road to a three-lane urban collector
roadway from Gooch Hill Road to South 19th Avenue. This improvement is scheduled in the
current CIP (SIF191) for construction in 2027.” The City’s transportation engineer reviewed this
report, and the proposed street design for compliance with state and local Public Works Standard
Specifications, the City’s design standards, and was found to meet code requirements.
38.220.060.A.12 – Non-Municipal Utilities
The applicant has received confirmation of future service connections from Charter
Communications for the proposed subdivision. This response is provided under document 031.
Northwestern Energy equipment is existing within the front yard 10-foot utility easements along
all existing rights-of-way surrounding the subject property. New front yard utility easements are
proposed along South 28th Avenue, and within rear yards adjacent to alleys and will provide
location flexibility for non-municipal utilities during buildout of the subdivision infrastructure. A
will-serve letter was provided by Northwestern Energy under document 031.1.
38.220.060.A.13 - Land Use
The application has provided future land use data consistent with the R-5 zoning district under
document 032. Proposed land uses for the subdivision are single household residential including
townhomes and rowhomes. Building permits for lots created by this subdivision will be subject
to Bozeman Municipal Code (BMC) provisions at the time of application, and the new R-D
zoning designation for the subject property.
38.220.060.A.14 - Parks and Recreation Facilities
No additional parkland dedication or cash-in-lieu of parkland is required with this subdivision.
The Parks Department reviewed the parkland requirements during the DRC review process. See
discussion above under primary review criteria.
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 21 of 26
38.220.060.A.15 - Neighborhood Center Plan
To provide a neighborhood focal point, all residential subdivisions that are ten net acres in size
or greater, must have a neighborhood center. A neighborhood center was provided with the
original Gran Cielo Subdivision.
38.220.060.A.16 - Lighting Plan
Street lighting was installed or financially guaranteed with the Gran Cielo Phase 2 Subdivision
final plat. The applicant proposes additional street lighting, detailed under application document
035, as well as bollard lighting within the east-west pedestrian pathway between 27th and 29th
Avenues.
38.220.060.A.17 - Miscellaneous
The proposed subdivision is not located within 200 feet of any public land access or within a
delineated Wildland Urban Interface area. No health or safety hazards on-site or off-site will be
created with this development.
38.220.060.A.19 - Affordable Housing
This application does not rely on incentives authorized in 38.380. Therefore, no analysis is
required.
SECTION 7 - FINDINGS OF FACT, ORDER AND APPEAL PROVISIONS
A. PURSUANT to Chapter 38, Article 2, BMC, and other applicable sections of Chapter 38,
BMC, public notice was given, opportunity to submit comment was provided to affected
parties, and a review of the preliminary plat described in these findings of fact was
conducted.
B. The purposes of the preliminary plat review were to consider all relevant evidence
relating to public health, safety, welfare, and the other purposes of Chapter 38, BMC; to
evaluate the proposal against the criteria and standards of Chapter 38 BMC; and to
determine whether the plat should be approved, conditionally approved, or denied.
C. The matter of the preliminary plat application was considered by the City Commission at
a public meeting on April 21, 2026 at which time the Department of Community
Development Staff reviewed the project, submitted and summarized the conditions of
approval, and summarized the public comment submitted to the City prior to the public
meeting in the provided staff report.
D. The City Commission requested public comment at the public meeting on April 21, 2026
and no public comment was received.
E. It appeared to the City Commission that all parties and the public wishing to examine the
proposed preliminary plat and offer comment were given the opportunity to do so. After
receiving the recommendation of the relevant advisory bodies established by Section
Chapter 38, BMC, and considering all matters of record presented with the application
and during the public comment period defined by Chapter 38, BMC, the City
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 22 of 26
Commission has found that the proposed preliminary plat would comply with the
requirements of the Bozeman Municipal Code if certain conditions were imposed.
Therefore, being fully advised of all matters having come before her regarding this
application, the City Commission makes the following decision.
F. The preliminary plat has been found to meet the criteria of Chapter 38, BMC, and is
therefore approved, subject to the conditions listed in Section 3 of this report and the
correction of any elements not in conformance with the standards of the Chapter
including those identified in Section 4 of this report. The evidence contained in the
submittal materials, advisory body review, public testimony, and this report, justify the
conditions imposed on this development to ensure that the final site plan and subsequent
construction complies with all applicable regulations, and all applicable criteria of
Chapter 38, BMC.
G. This City Commission order may be appealed by bringing an action in the Eighteenth
District Court of Gallatin County, within 30 days after the adoption of this document by
the City Commission, by following the procedures of Section 76-3-616, MCA. The
preliminary approval of this minor subdivision shall be effective for one (1) year from the
date of the signed Findings of Fact and Order approval. At the end of this period the City
may, at the request of the subdivider, grant an extension to its approval by the
Community Development Director for a period of mutually agreed upon time.
DATED this ________ day of _____________________, 2026
BOZEMAN CITY COMMISSION
_________________________________
JOEY MORRISON
Mayor
ATTEST:
_______________________________
MIKE MAAS
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
June2nd
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 23 of 26
City Clerk
APPROVED AS TO FORM:
_________________________________
GREG SULLIVAN
City Attorney
APPENDIX A – PROJECT SITE ZONING AND GROWTH POLICY
Zoning Designation and Land Uses:
This application was deemed complete prior to the February 1, 2026 effective date of the repeal
and replace of Chapter 38 of the Bozeman Municipal Code (BMC) also known as the 2025
Unified Development Code (2025 UDC). This project is subject to the standards and review
procedures of the UDC in effect prior to February 1, 2026. Prior to February 1, the subject
property was zoned R-5, and is now zoned R-D. The following is an analysis of R-5 zoning, with
a brief summary of R-D zoning below.
The subject property is zoned R-5, Residential mixed-use high density district. The intent of the
R-5 residential mixed-use high density district is to provide for high-density residential
development through a variety of compatible housing types and residentially supportive
commercial uses in a geographically compact, walkable area to serve the varying needs of the
community's residents. These purposes are accomplished by:
1. Providing for a mixture of housing types, including single and multi-household dwellings to
serve the varying needs of the community's residents.
2. Allowing offices and small scale retail and restaurants as secondary uses provided special
standards are met.
Use of this zone is appropriate for areas adjacent to mixed-use districts and/or served by transit
to accommodate a higher density of residents in close proximity to jobs and services.
This application meets the intent of the R-5 district by adding additional residential homes in
proximity to an established park, and nearby mixed-use and commercial zoned districts. The
proposed subdivision meets minimum R-5 density requirements within an emerging area of
development within the City. The overall subdivision provides a mixture of housing types
including single household, townhomes, and rowhomes. Nearby zoning includes R-3, R-4, and
REMU. Un-annexed commercial uses exist within a quarter mile of the proposed subdivision.
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 24 of 26
Annexed and zoned mixed-use nodes exist within a quarter to a half mile to the northeast and
southeast.
The single household lots within this proposed subdivision will be subject to building permit
review following infrastructure construction and final plat approval and recording. These
building permits will be subject to R-D zoning requirements within the 2025 UDC update at the
time of submittal. R-D zoning is directly correlated to the previous R-5 zoning within the text
update. Areas previously zoned R-5 were zoned R-D in the 2025 UDC. R-5 and R-D are both
Residential Mixed Use High Density Districts, and both correlate to the 2020 and 2025 Bozeman
Community Plan designation of Urban Neighborhood (Residential).
Adopted Growth Policy Designation:
This subdivision at the time of submittal was subject to the Bozeman Community Plan 2020
(2020 BCP). Table 4 of the 2020 BCP shows the correlation between the future land use map
designation of Urban Neighborhood and implementing zoning R-5 district. Prior to preliminary
plat adequacy and completeness on January 30, 2026, the 2025 Bozeman Community Plan (2025
BCP) was adopted by the City Commission with Resolution 2025-71 on October 28, 2025. This
technical update incorporated the new zoning districts from the 2025 UDC update changing the
correlating zoning district within the Urban Neighborhood designation from R-5 to R-D. This
application is subject to the 2025 BCP since the 2025 plan was adopted prior to adequacy of this
application in January, 2026. As noted above, R-D zoning is directly associated with the
previous R-5 zoning within the text update. Areas previously zoned R-5 were zoned R-D in the
2025 UDC update. R-5 and R-D are both Residential Mixed Use High Density Districts. The
below overview of growth policy is for the 2025 BCP.
The subject property is designated as Urban Neighborhood. R-5/R-D zoning is properly
correlated to the Urban Neighborhood land use designation. This category promotes
neighborhoods substantially dominated by housing, yet integrated with small-scale commercial
and civic uses. The housing can include single-attached and small single-detached dwellings,
apartments, and live-work units. If buildings include ground floor commercial uses, residences
should be located on upper floor. Variation in building mass, height, and other design
characteristics should contribute to a complete and interesting streetscape.
Secondary supporting uses, such as retail, office, and civic uses, are permitted on the ground
floor. All uses should complement existing and planned residential uses. Non-residential uses are
expected to be pedestrian oriented and emphasize the human scale with modulation in larger
structures. Stand alone, large, non-residential uses are discouraged. Non-residential spaces
should provide an interesting pedestrian experience with quality urban design for buildings, sites,
and open spaces.
This category is appropriate near commercial centers. Larger areas should be well served by
multimodal transportation routes. Multi-unit, higher density, urban development is expected.
Any development within this category should have a well-integrated transportation and open
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 25 of 26
space network that encourages pedestrian activity and provides ready-access within and adjacent
development.
This proposed subdivision is well suited to implement the Urban Neighborhood designation by
providing additional residential homes within an established residential neighborhood and
correlated zoning district. Nearby REMU and B-2M zoning provides opportunities for future
commercial development within a half mile of the proposed subdivision. An open space trail
network and parks are located to the south, southeast, and east, with recently approved and yet
unconstructed expansions to parks and trails to the west and southwest. This application will
expand the public ROW transportation system and public realm including a local street and
associated sidewalks and an east-west pedestrian pathway.
APPENDIX B – DETAILED PROJECT DESCRIPTION
Project Background and Description
A preliminary plat application by the applicant, WWC Engineering, 895 Technology Boulevard,
Suite 203, Bozeman, MT 59718, representing owner Bozeman Haus LLC, 15267 SE Rivershore,
Vancouver, WA 98683. See the full background of application approvals for this property in the
executive summary.
APPENDIX C – NOTICING AND PUBLIC COMMENT
Notice was provided at least 15 and not more than 45 days prior to the City Commission public
meeting per BMC 38.220.420, The City scheduled public notice for this application to begin on
March 16, 2026. The applicant posted public notice on the subject property on March 13, 2026
and sent public notice to physically adjacent landowners of record within 200-feet of the subject
property via first class mail on March 13, 2026. The City has received one public comment from
J. Bennett on March 17, 2026 in support of the proposed subdivision.
APPENDIX D – OWNER INFORMATION AND REVIEWING STAFF
Owner: Bozeman Haus LLC, 15267 SE Rivershore, Vancouver, WA 98683.
Applicant: WWC Engineering, 895 Technology Boulevard, Suite 203, Bozeman, MT 59718
Representative: Same as Applicant
Report By: Danielle Garber, Senior Planner
FISCAL EFFECTS
Fiscal impacts are undetermined at this time, but will include property tax revenues from new
development, along with increased costs to deliver municipal services to the property. Impact
fees will be collected at the time of building permit issuance for individual buildings along with
City sewer and water connection fees.
ATTACHMENTS
The full application and file of record can be viewed digitally at the Community Development
Department at 20 E. Olive Street, Bozeman, MT 59715, the application drawings and documents
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
25703 Findings of Fact and Order for Gran Cielo Phase 3 Subdivision Page 26 of 26
and a copy of the public notice may be viewed in the City’s online document repository located
at https://www.bozeman.net/departments/community-development/planning/project-information-
portal, select the “Project Documents Folder” link and navigate to application 25703 located
within the 2025 folder.
Project documents and drawings are available at this direct link to the public document
repository for application 25703.
The following are direct links to documents and drawings available in the online public archive
under application 25703:
• Drawing 001 1 Preliminary Plat Page 1
• Drawing 001 2 Preliminary Plat Page 2
• Document 002 Response to Pre-App Comments
• Document 006 Subdivision Information
• Document 008 Streets, Roads, and Grades
• Document 015 Waivers
• Document 018 Landscape
• Document 020 Surface Water
• Document 027 Agricultural Water User Facilities
• Document 028 Water and Sewer
• Document 029 Stormwater Management
• Document 030 Streets, Roads, and Alleys
• Document 042 Ditch Noticing Correspondence
Docusign Envelope ID: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5
Certificate Of Completion
Envelope Id: 2CECD5C1-E94C-8FEB-835A-89E80DD6E4A5 Status: Completed
Subject: Complete with Docusign: 25703_Findings_of_Fact.pdf
Source Envelope:
Document Pages: 26 Signatures: 3 Envelope Originator:
Certificate Pages: 5 Initials: 0 Alex Newby
AutoNav: Enabled
EnvelopeId Stamping: Enabled
Time Zone: (UTC-08:00) Pacific Time (US &
Canada)
Stamps: 1 alex.newby@bozemanmt.gov
IP Address: 155.190.3.7
Record Tracking
Status: Original
6/3/2026 10:02:27 AM
Holder: Alex Newby
alex.newby@bozemanmt.gov
Location: DocuSign
Security Appliance Status: Connected Pool: StateLocal
Signer Events Signature Timestamp
Greg Sullivan
greg.sullivan@bozemanmt.gov
City of Bozeman
Security Level: Email, Account Authentication
(None)Signature Adoption: Pre-selected Style
Using IP Address: 155.190.3.7
Sent: 6/3/2026 10:07:42 AM
Viewed: 6/3/2026 10:19:03 AM
Signed: 6/3/2026 10:19:12 AM
Electronic Record and Signature Disclosure:
Accepted: 6/3/2026 10:19:03 AM
ID: 343d0631-a65c-49b2-8700-9b73262bedec
Joey Morrison
joey.morrison@bozemanmt.gov
Mayor
Security Level: Email, Account Authentication
(None)Signature Adoption: Drawn on Device
Using IP Address:
2600:100e:b09d:1a38:d8c1:d007:b80f:200b
Signed using mobile
Sent: 6/3/2026 10:19:13 AM
Viewed: 6/3/2026 4:06:11 PM
Signed: 6/3/2026 4:06:26 PM
Electronic Record and Signature Disclosure:
Accepted: 6/3/2026 4:06:11 PM
ID: 42f06ce6-7431-4447-bb26-04341acfbca4
Mike Maas
mike.maas@bozemanmt.gov
City Clerk
City of Bozeman
Security Level: Email, Account Authentication
(None)
Signature Adoption: Pre-selected Style
Using IP Address: 155.190.3.7
Sent: 6/3/2026 4:06:29 PM
Viewed: 6/9/2026 12:53:49 PM
Signed: 6/9/2026 12:54:29 PM
Electronic Record and Signature Disclosure:
Accepted: 8/23/2022 2:22:44 PM
ID: b1bb90fd-5db8-4a5f-9451-9536f39ef003
In Person Signer Events Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events Status Timestamp
Carbon Copy Events Status Timestamp
Danielle Garber
danielle.garber@bozemanmt.gov
Security Level: Email, Account Authentication
(None)
Sent: 6/3/2026 10:07:41 AM
Viewed: 6/3/2026 11:26:15 AM
Electronic Record and Signature Disclosure:
Not Offered via Docusign
Michelle Chapel
michelle.chapel@bozemanmt.gov
Records Coordinator
City Bozeman
Security Level: Email, Account Authentication
(None)
Sent: 6/9/2026 12:54:31 PM
Electronic Record and Signature Disclosure:
Accepted: 2/24/2026 9:38:21 AM
ID: 1fa4538c-9b38-40d2-9e1a-390aa0445f47
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events Status Timestamps
Envelope Sent Hashed/Encrypted 6/3/2026 10:07:41 AM
Certified Delivered Security Checked 6/9/2026 12:53:49 PM
Signing Complete Security Checked 6/9/2026 12:54:29 PM
Completed Security Checked 6/9/2026 12:54:31 PM
Payment Events Status Timestamps
Electronic Record and Signature Disclosure
ELECTRONIC RECORD AND SIGNATURE DISCLOSURE
From time to time, City Manager (we, us or Company) may be required by law to provide to you
certain written notices or disclosures. Described below are the terms and conditions for providing
to you such notices and disclosures electronically through the DocuSign system. Please read the
information below carefully and thoroughly, and if you can access this information electronically
to your satisfaction and agree to this Electronic Record and Signature Disclosure (ERSD), please
confirm your agreement by selecting the check-box next to ‘I agree to use electronic records and
signatures’ before clicking ‘CONTINUE’ within the DocuSign system.
Getting paper copies
At any time, you may request from us a paper copy of any record provided or made available
electronically to you by us. You will have the ability to download and print documents we send
to you through the DocuSign system during and immediately after the signing session and, if you
elect to create a DocuSign account, you may access the documents for a limited period of time
(usually 30 days) after such documents are first sent to you. After such time, if you wish for us to
send you paper copies of any such documents from our office to you, you will be charged a
$0.00 per-page fee. You may request delivery of such paper copies from us by following the
procedure described below.
Withdrawing your consent
If you decide to receive notices and disclosures from us electronically, you may at any time
change your mind and tell us that thereafter you want to receive required notices and disclosures
only in paper format. How you must inform us of your decision to receive future notices and
disclosure in paper format and withdraw your consent to receive notices and disclosures
electronically is described below.
Consequences of changing your mind
If you elect to receive required notices and disclosures only in paper format, it will slow the
speed at which we can complete certain steps in transactions with you and delivering services to
you because we will need first to send the required notices or disclosures to you in paper format,
and then wait until we receive back from you your acknowledgment of your receipt of such
paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to
receive required notices and consents electronically from us or to sign electronically documents
from us.
All notices and disclosures will be sent to you electronically
Electronic Record and Signature Disclosure created on: 4/22/2022 3:30:54 PM
Parties agreed to: Greg Sullivan, Joey Morrison, Mike Maas, Michelle Chapel
Unless you tell us otherwise in accordance with the procedures described herein, we will provide
electronically to you through the DocuSign system all required notices, disclosures,
authorizations, acknowledgements, and other documents that are required to be provided or made
available to you during the course of our relationship with you. To reduce the chance of you
inadvertently not receiving any notice or disclosure, we prefer to provide all of the required
notices and disclosures to you by the same method and to the same address that you have given
us. Thus, you can receive all the disclosures and notices electronically or in paper format through
the paper mail delivery system. If you do not agree with this process, please let us know as
described below. Please also see the paragraph immediately above that describes the
consequences of your electing not to receive delivery of the notices and disclosures
electronically from us.
How to contact City Manager:
You may contact us to let us know of your changes as to how we may contact you electronically,
to request paper copies of certain information from us, and to withdraw your prior consent to
receive notices and disclosures electronically as follows:
To contact us by email send messages to: mmaas@bozeman.net
To advise City Manager of your new email address
To let us know of a change in your email address where we should send notices and disclosures
electronically to you, you must send an email message to us at mmaas@bozeman.net and in the
body of such request you must state: your previous email address, your new email address. We
do not require any other information from you to change your email address.
If you created a DocuSign account, you may update it with your new email address through your
account preferences.
To request paper copies from City Manager
To request delivery from us of paper copies of the notices and disclosures previously provided
by us to you electronically, you must send us an email to mmaas@bozeman.net and in the body
of such request you must state your email address, full name, mailing address, and telephone
number. We will bill you for any fees at that time, if any.
To withdraw your consent with City Manager
To inform us that you no longer wish to receive future notices and disclosures in electronic
format you may:
i. decline to sign a document from within your signing session, and on the subsequent page,
select the check-box indicating you wish to withdraw your consent, or you may;
ii. send us an email to mmaas@bozeman.net and in the body of such request you must state your
email, full name, mailing address, and telephone number. We do not need any other information
from you to withdraw consent.. The consequences of your withdrawing consent for online
documents will be that transactions may take a longer time to process..
Required hardware and software
The minimum system requirements for using the DocuSign system may change over time. The
current system requirements are found here: https://support.docusign.com/guides/signer-guide-
signing-system-requirements.
Acknowledging your access and consent to receive and sign documents electronically
To confirm to us that you can access this information electronically, which will be similar to
other electronic notices and disclosures that we will provide to you, please confirm that you have
read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for
your future reference and access; or (ii) that you are able to email this ERSD to an email address
where you will be able to print on paper or save it for your future reference and access. Further,
if you consent to receiving notices and disclosures exclusively in electronic format as described
herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before
clicking ‘CONTINUE’ within the DocuSign system.
By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm
that:
You can access and read this Electronic Record and Signature Disclosure; and
You can print on paper this Electronic Record and Signature Disclosure, or save or send
this Electronic Record and Disclosure to a location where you can print it, for future
reference and access; and
Until or unless you notify City Manager as described above, you consent to receive
exclusively through electronic means all notices, disclosures, authorizations,
acknowledgements, and other documents that are required to be provided or made
available to you by City Manager during the course of your relationship with City
Manager.