HomeMy WebLinkAbout028 Water and SewerGallatin Center Subdivision Preliminary Plat Application 28 - Water and Sewer The property has an existing 8-inch ductile iron water main extending along Rawhide Ridge Road, and through the property to Thomas Drive. Several existing water mains are located in adjacent streets, including an 8-inch ductile iron water main in Max Avenue, and 12-inch ductile iron water mains in Baxter Lane, Thomas Drive, and Cattail Street. Wastewater collection pipes also surround the property. There are 8-inch PVC sewer mains in Thomas Drive, Rawhide Ridge Road, Max Avenue, and Cattail Street. Baxter Lane has a 24-inch Asbestos Concrete sewer main. No water and sewer main extensions are proposed with this subdivision. Water and sewer improvements will be proposed in the future, with subsequent subdivisions of the remainder lot (Lot B). The water and sewer exhibit included in this section shows the preliminary location of the future water and sewer utilities within future phases (separate subdivision). Preliminary water and sewer reports are included in this section, which include anticipated water and wastewater demands for the subject property. These reports are preliminary, since the water and sewer mains are not part of this subdivision application, and will be installed with subsequent subdivisions. The City of Bozeman has expressed concern for the capacity of existing water and sewer infrastructure with the added demands from the future development of the subdivision. The water and sewer reports in this section detail the anticipated water and sewer demands associated with the subdivision. The City of Bozeman will need to evaluate the existing infrastructure to determine if any offsite improvements will be required. Please see the responses below to the items in Section 38.220.060 – Additional Subdivision Preliminary Plat Supplements in the Bozeman Municipal Code. a. Water rights. Describe how the proposed subdivision intends to satisfy section 38.410.130. Provide all documentation of water rights appurtenant to the proposed subdivision; e.g. previous estimates or actual payment-in-lieu of water rights, certified well logs, decrees or adjunctions, etc. The property owner does not currently possess any water rights for the proposed subdivision property. Water rights for future service to the lots will be addressed on a site- by-site basis, with subsequent applications. b. The information needed to demonstrate proposed compliance with division 38.270. Special care is needed when concurrent construction is proposed. Concurrent construction is not proposed with this application. The rights-of-way will be dedicated with the subdivision. No water and sewer mains will be installed with this subdivision. 28 – Water and Sewer Subdivision Layout and Utility Exhibit S S S S S W W W WWWSSSSSSSSSSSSSSS SWWWWW WWWWWNGNGNGNGNGNGNGFOSTSTUGPUGPUGPUGPUGPUGPFOFOFOXX X X XUGPXXXXNG NG NG NG NG NG NG NGFOFOFOFOFOFOFOFOOHPOHPOHPOHPOHPOHPOHPOHPOHPSSSSSSSSSSSSSSSSSSSSSSSSWWWWWWWSSWWUGTVUGTVUGTVUGTVW W W W W WSSSSSSSS SSUGPUGPUGPNGNGNGPROPOSED 60' PUBLIC R.O.W. LOT A 16.49± ACRES 718,288± SF (PHASE 1) USPS LOT LOT D 5.08± ACRES 221,232± SF (FUTURE PHASES)LOT E 5.53± ACRES 240,745± SF (FUTURE PHASES) LOT F 5.03± ACRES 218,999± SF (FUTURE PHASES) CATTAIL STREET (EXISTING) KIMBERWICKE STREET (EXISTING) RAWHIDE RIDGE ROAD (EXISTING)MAX AVENUE (EXISTING)NORTH 19TH AVENUE (EXISTING)BAXTER LANE (EXISTING)NORTH 25TH AVENUE (FUTURE PHASES)RAWHIDE RIDGE ROAD (PHASE 1) PROPOSED 60' PUBLIC R.O.W. PROPOSED 60' PUBLIC R.O.W. PROPOSED 60' PUBLIC R.O.W. PROPOSED 25' PUBLIC TRAIL EASEMENT EXISTING CURB/ EDGE OF PAVEMENT EXISTING EDGE OF WETLAND (TO BE REALIGNED) EXISTING EDGE OF WETLAND (TO BE REALIGNED) EDGE OF EXISTING WETLAND (TYPICAL) EXISTING 8" PVC SEWER MAIN EXISTING 8" PVC SEWER MAIN STUB EXISTING 8" PVC SEWER MAIN EXISTING 8" PVC SEWER MAIN EXISTING 8" PVC SEWER MAIN EXISTING 12" DI WATER MAIN EXISTING 8" DI WATER MAIN EXISTING 8" DI WATER MAIN EXISTING 8" DI WATER MAIN EXISTING 8" PVC SEWER MAIN EXISTING 8" PVC SEWER MAIN STUB EXISTING HYDRANT (TYPICAL) EXISTING 8" PVC SEWER MAIN STUB EXISTING 8" DI WATER MAIN EXISTING 8" PVC SEWER MAIN EXISTING 8" DI WATER MAIN STUB EXISTING 12" DI WATER MAINEXISTING 24" ASBESTOS CONCRETE SEWER MAIN EXISTING 12" DI WATER MAIN MAX AVENUE (FUTURE PHASES) SARTAIN STREET (FUTURE PHASES) PROPOSED 8" DI WATER MAIN (FUTURE PHASES) PROPOSED 8" PVC SEWER MAIN (FUTURE PHASES) PROPOSED 8" DI WATER MAIN (FUTURE PHASES) PROPOSED 8" PVC SEWER MAIN (FUTURE PHASES) PROPOSED 8" PVC SEWER MAIN (FUTURE PHASES) PROPOSED HYDRANT (FUTURE PHASES) (TYPICAL) PROPOSED SSMH (FUTURE PHASES) (TYPICAL) LOT B 9.94± ACRES 432,807± SF (FUTURE PHASES)LOT C 15.50± ACRES 674,948 SF (FUTURE PHASES) LOT G 0.84± ACRES 36,579 SF (FUTURE PHASES)THOMAS DRIVE (EXISTING)LOT B (REMAINDER LOT/ FUTURE PHASES) 46.15± ACRES 2,010,168± SF K:\Bozeman\Gallatin Center LP\2024381 Gallatin Center\05CAD\Sheets\Preliminary Plat\24381-WATR-SSWR-EXHB.dwg WATER AND SEWER EXHIBIT 10/8/2025 10:44:15 AM DESIGNED BY:DRAWN BY:CHECKED BY:DATE:JRHJRHEWROCTOBER 2025SHEET---NO.DATEREVISIONPREPARED BY BY WATER AND SEWER EXHIBIT GALLATIN CENTER LIMITED PARTNERSHIP BOZEMAN, MT GALLATIN CENTER SUBDIVISION ENGI NEERING PROJECT NO. 2024381 895 TECHNOLOGY BLVD., SUITE 203 BOZEMAN, MT 59718 (406) 586-0262 www.wwcengineering.com 0 SCALE: 1" = 200' 200'100' 28 – Water and Sewer Sewer Design Report SEWER MAIN DESIGN REPORT FOR: GALLATIN CENTER SUBDIVISION BOZEMAN, MT Prepared By: WWC Engineering/Madison 895 Technology Drive, Suite 203 Bozeman, MT 59718 (406) 586-0262 January 2026 895 Technology Boulevard, Suite 203, Bozeman, MT 59718 | 406.586.0262 GALLATIN CENTER MAJOR SUBDIVISION SEWER MAIN DESIGN REPORT A. General This design report outlines the preliminary future sewer main extensions, which are anticipated to be installed with subsequent subdivisions of the proposed remainder lot (Lot B) of this subdivision. The current property is a 68.33-acre parcel (Minor Sub 210, Section 23, Township 01S, Range 05E, Lot 3) located northwest of Baxter Lane and North 19th Avenue in Bozeman, Montana. The timing of construction for these wastewater improvements has not yet been determined. The sewer main extension is proposed to be constructed with future subdivisions, once planned. The sewer main design, and this report will be subject to separate subdivision reviews once the remainder lot (Lot B) is further subdivided. For this reason, this report is considered preliminary, as it may be revised with future applications. This 2- lot subsequent minor subdivision does not include any sewer main extension. The following references were used in the wastewater facilities design and capacity analysis: - COB Design Standards and Specifications Policy, 2024 - COB Modifications to Montana Public Works Standard Specifications (MPWSS), Addendum #3 - City adopted MPWSS and Adopted Addenda - COB Wastewater Facility Plan, 2024 - Circular DEQ- 2 - City of Bozeman Infrastructure Viewer Design procedures and parameters from the COB Design Standards and Specifications Policy were followed in the sewer infrastructure planning for this subdivision. B. Proposed Collection System The future sewer main extension is anticipated to consist of 1,817 linear feet of 8” PVC pipe meeting COB specifications. The maximum manhole spacing will not exceed 400 feet for the 8-inch main with a manhole barrel size of 48-inches. Manholes will be constructed according to COB specifications. C. Capacity Analysis A capacity analysis was performed for the proposed sewer main extensions. The Gallatin Center Subdivision property was recently rezoned to the B-2M (Community Business–Mixed) zoning district. While this zoning allows a range of uses, the majority of the property is anticipated to be used for commercial development based on the zoning and location. Commercial uses are expected to generate significantly lower wastewater demands compared to other uses permitted within B-2M zoning. For this analysis, the anticipated future lots (to be created from remainder Lot B) were evaluated assuming commercial sewer demands. Lot A is planned for residential development. Demand estimates for this lot are based on the unit count from the preliminary site plan for Lot A, which has been submitted under a separate application (Planning #25693). A site plan overview sheet of proposed Lot A is included in Appendix 1 of this report. Per COB DSSP Section 5.2.4, the analysis assumes 64.4 gallons per capita per day (gpcd), an average household size of 2.17 residents per dwelling unit, and an infiltration allowance of 150 gallons per acre per day. Because development details for the remainder lot (Lot B) have not yet been determined, planning values were applied to estimate average daily flows. Anticipated commercial development for future lots were evaluated using B-2 planning values rather than B-2M values, to align with the likelihood for commercial use. The remainder lot property (Lot B), is anticipated to consist of 5 developable lots, based on the preliminary anticipated lot layout for the future subdivisions. The calculations refer to these anticipated 5 developable lots as Lots B-F. Peak flow rates were determined using the following peaking factor equation: Qmax / Qave = (18 + P0.5) / (4 + P0.5) (P = Population/thousands) The population for Lot A was calculated based on the proposed unit count and 2.17 residents per unit. Equivalent populations for the future Lots B–F were back-calculated by dividing the estimated average daily flow by 64.4 gpcd. The resulting peaking factor was then applied to obtain the peak flow rate for each lot. Detailed calculations are provided in Appendix 2. The estimated wastewater flows for each lot are summarized in Table 1 below. Table 1: Wastewater Flow Calculations Summary Once the property is fully subdivided and developed, the subject property is estimated to generate a peak design flow of approximately 0.44 cfs (201 gpm). The proposed sewer main extensions have been designed to operate at no more than 75 percent of full capacity under peak hour conditions at full buildout. Based on minimum required pipe size and slope, an 8-inch PVC sewer main was selected. At a slope of 0.40%, the 8-inch main provides a capacity of 0.64 cfs at three-quarters full depth, which is sufficient to convey the projected peak flow of 0.44 cfs from the subdivision. Supporting calculations are included in Appendix 3. D. Existing Infrastructure Capacity Analysis Lot A: Proposed Lot A of the subdivision has a planned residential development which has been submitted under a separate application (Planning #25693) and is also included in Appendix 1 of this report. While infrastructure plans for this development have not yet been finalized, it is likely that the effluent generated will ultimately flow into the existing 8” PVC sewer main stub off Cattail Street or directly into the sewer main in Max Avenue. The sewer main in Cattail Street will ultimately discharge the effluent to the sewer main in Max Avenue. The preliminary site plan for the development of Lot A is included in Appendix 1 of this report. Preliminary Future Lots to be Created from Lot B (With Subsequent Subdivisions): The remainder of the property does not have any associated development planned at this time. Based on the existing infrastructure and topography of the land, it is anticipated that effluent generated from any future development of Lot C will likely flow into the existing sewer main in Rawhide Ridge Road, which will ultimately flow into the sewer main in Max Avenue. Future development of Lot E or Lot F will likely discharge effluent into the proposed main extension in the future extension of Sartain Street, which ultimately leads to the sewer main in Max Avenue. Future development of Lot B and Lot D will most likely connect to the proposed sewer main planned for the Sartain Street extension. While there is a possibility of utilizing the existing sewer main along North 27th Avenue, its extreme bury depth makes it a less practical option. Therefore, the Sartain Street sewer main is the anticipated discharge location for both lots. In summary, the City of Bozeman should evaluate the capacity of the existing sewer main in Max Avenue to ensure it can accommodate the flow generated by the future development of proposed Lots A through F, as this main is expected to serve as the ultimate discharge location for the lots. The subdivision lot layout and utility locations are shown in Appendix 4 for reference. E. Conclusion The future subdivisions of Gallatin Center Subdivision remainder lot (Lot B) improvements are proposed to include 8” PVC sanitary sewer mains extending from Max Avenue and continuing through part of the future Sartain Street extension. These sewer mains will have the capacity to handle the effluent generated by the future subdivision. This project will require the approval of the City Engineer and the Montana Department of Environmental Quality. Appendices: 1. Lot A Preliminary Site Plan 2. Wastewater Flow Calculations 3. 8” PVC Pipe Capacity Calculations 4. Subdivision and Utility Layout Sewer Main Design Report Appendix 1 – Lot A Preliminary Concept Plan WWWWWWWWWWWWWWXXXXXXXXXXXXSTSTSTOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSWWWWWWWWWWWWWWW W WWWWWWWWWW WW SSSSSSSTWWWWWWWWWWWW SSSS SSSSSSSSSSSS SS SS SS UGTVUGTVUGTVUGTVUGTVUGTVUGTVUGTVUGTVWW W W W W W W S S S SSSS S UGP UGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPNG NGNGNGNGNGNGNGNGNGNGNGNGNGNGS S S S S S S S SSSSSSSSSSSSSSSSSWWWWWWWWWWWWWWWWWWSSSSSSSSS S SSS SWSFSWS FSWS FSWS FSWSFSWSSSSSWWWWWWWWWWWWWWWWW W W W W W W WSSSSSSSSSSSSWSFSFSSS S S SWWSWSWSWSWSSSSSFSWSS STSTSTSTSTSTSTSTSTST ST ST ST SBUILDING 2(TYPE B)CLUBHOUSEBUILDINGFITNESSCENTERBUILDING 4(TYPE B)BUILDING 6(TYPE B)BUILDING 3(TYPE A)BUILDING 7(TYPE A)BUILDING 5(TYPE C)BUILDING 8(TYPE C)BUILDING 1(TYPE C)BUILDING 9(TYPE D)LEASINGOFFICE/MAILROOMFSWS RAWHIDE RIDGE ROAD (EXISTING)MAX AVENUE (EXISTING)KIMBERWICKE STREET (EXISTING) RAWHIDE RIDGE ROAD (TO BE CONSTRUCTED WITH SUBDIVISION) NORTH 27TH AVENUE(C.O.B. CAPITOL IMPROVEMENT)CATTAIL STREET(EXISTING)50' WATERCOURSESETBACK (ZONE 2)30' WATERCOURSESETBACK (ZONE 1)EDGE OF DELINEATEDWETLAND (TYP.)PROPERTY LINE20' UTILITYEASEMENT15' FRONTSETBACK15' FRONTSETBACK 15' FRONT SETBACKPROPERTY LINEEXISTING SIDEWALKEXISTING 8" DI WATER MAINEXISTING 8" PVCSEWER MAINEXISTING 8" DI WATER MAINEXISTING 12" DIWATER MAINEXISTING 12" DIWATER MAINEXISTING 8" PVCSEWER MAIN5' SIDE SETBACKEXISTING 8" PVC SEWER MAINEXISTING OVERHEADPOWEREXISTING 8" DIWATER MAIN STUB(TO BE ABANDONED)EXISTING 8" PVCSEWER MAIN STUB(TO BE ABANDONED)EXISTING STORMCULVERT (TYP.)EXISTING 8" DI WATER MAINEXISTING 8" PVCSEWER MAINEXISTING UNDERGROUND POWEREXISTING UNDERGROUND GASEXISTING 8" PVCSEWER MAINEDGE OF DELINEATEDWETLAND (TYP.)25.0' WIDE PUBLICTRAIL CORRIDOREASEMENTPROPOSED 30.0'UTILITY EASEMENTPROPOSED 30.0'UTILITY EASEMENTPROPOSED 30.0'UTILITY EASEMENTPROPOSED 30.0'UTILITY EASEMENTPROPOSED 30.0'UTILITY EASEMENTEXISTING UNDERGROUND TVEXISTING FENCEEXISTING HYDRANTEXISTING HYDRANTEXISTING HYDRANTEXISTING HYDRANT70.0' WIDE PUBLIC OPEN SPACE/LINEAR TRAIL & STREAMCORRIDOR EASEMENTBUILDING 2(TYPE B)OPEN SPACE AREA(AMMENITIES)PARKLAND(SEE LANDSCAPING SHEETSFOR DETAILS)PARKLAND(SEE LANDSCAPINGSHEETS FOR DETAILS)CLUBHOUSEBUILDINGFITNESSCENTERBUILDING 4(TYPE B)BUILDING 6(TYPE B)BUILDING 3(TYPE A)BUILDING 7(TYPE A)BUILDING 5(TYPE C)BUILDING 8(TYPE C)BUILDING 1(TYPE C)BUILDING 9(TYPE D)WEST CATRON CREEKWEST CATRON CREEK5' SIDE SETBACKEXISTING PERMITTEDCULVERT CROSSINGLEASINGOFFICE/MAILROOM5' PUBLIC ACCESSEASEMENTEXISTING STORMWATERDETENTION POND(OUTLET TO EAST CATRON CREEK)OPEN SPACEAREA(DOG PARK)0SCALE: 1" = 50'50'25'LINE STYLE LEGENDXXOOFMFMFOFO[ ][ ]IRIRNGNGOHPOHPOHTOHTWWUGTVUGTVUGTUGTUGPUGPSTSTSSSSRWRWOHTVOHTVFFXXOOFMFMFOFO[ ][ ]FFIRIRNGNGOHPOHPOHTOHTWWUGTVUGTVUGTUGTUGPUGPSTSTSSSSRWRWOHTVOHTVEXISTINGPROPOSEDFENCE [BARBED]FENCE [CHAIN]FORCEMAINFIBER OPTICFENCE [PRIVACY]FIRE LINEIRRIGATION LINENATURAL GASOVERHEAD POWEROVERHEAD TELEPHONEUNDERGROUND TVUNDERGROUND TELEPHONEUNDERGROUND POWERSTORMWATERSEWERRAW WATEROVERHEAD TVMAJOR CONTOURMINOR CONTOURK:\Bozeman\Thompson Thrift\2024525 Gallatin Center Development\05CAD\Sheets\Site\24525-SITE_DIM_PLAN.dwg OVERALL SITE PLAN 11/14/2025 7:39:55 AM DESIGNED BY:DRAWN BY:CHECKED BY:DATE:JRHJRHEWR/CGBNOV. 2025SHEETC400NO.DATEREVISIONPREPARED BY BY SITE PLAN OVERVIEW SITE PLAN BOZEMAN, MT THOMPSON THRIFT MULTIFAMILY COMMUNITY ENGINEERING PROJECT NO. 2024525 895 TECHNOLOGY BLVD., SUITE 203 BOZEMAN, MT 59718 (406) 586-0262 www.wwcengineering.com PROJECT:THOMPSON THRIFT MULTIFAMILY COMMUNITYLEGAL DESC:GALLATIN CENTER SUBDIVISION PHASE 5, LOT A(TO BE FINALIZED WITH GALLATIN CENTER SUBDIVISION PHASE 5)SUBDIVISION CURRENT LEGAL DESC.: MINOR SUB 210, S35, T01 S, R05 E, Lot 3, ACRES 68.331, (RE-MAINDER) LESS GALLATIN CENTER SUB PHASE 1-4ZONING: B-2M (REGIONAL COMMERCIAL AND SERVICES)SITE AREAS:LOT AREA:718,303± SF16.49 AC(100%)PARKLAND DEDICATION:68,389± SF1.57 AC(9.5%)WATERCOURSE SETBACKS:186,436± SF4.28 AC(26.0%)NET RESIDENTIAL AREA:463,478± SF10.64 AC(64.5%)LANDSCAPED AREA:66,211± SF1.52 AC(9.2%)IMPERVIOUS AREA:285,291± SF6.55 AC(39.7%)ROOF AREA:111,976± SF2.57 AC(15.6%)BLOCK FRONTAGE:RAWHIDE RIDGE ROAD: MIXEDCATTAIL STREET: MIXEDMAX AVENUE: MIXEDTHOMAS DRIVE: LANDSCAPEDNORTH 27TH AVENUE: TBDSITE LIGHTING:AS SHOWN ON SHEET LP1SNOW STORAGE:AS SHOWN ON SHEETS C401-C402PARKLAND:REQUIRED: 2.55 AC (SEE PARKLAND TRACKING TABLE IN NARRATIVE)PROVIDED:1.57 AC (PROPOSED PARKLAND DEDICATION. SEE SITE PLAN)0.98 AC ( C.I.L.P/I.I.L.P)TOTAL PROVIDED = 2.55 ACOPEN SPACE:REQUIRED:BUILDINGS 1-9:100 SF/ 1-BED UNIT150 SF/ 2+ BED UNIT120 1 BED UNITS * 100 SF = 12,000 SF192 2+ BED UNITS * 150 SF = 28,800 SFTOTAL = 40,800 SFPROVIDED:BALCONIES/PATIOS20,400 SFINDOOR RECREATIONAL AREAS 5,015 SFSHARED OPEN SPACE (DOG PARK) 8,396 SFSHARED OPEN SPACE (AMMENITIES AREA)16,373 SFTOTAL PROVIDED = 50184 SF (123% OF REQUIRED)*SEE SHEET C404 FOR OPEN SPACE AREAS.VEHICLE PARKING:REQUIRED:BUILDINGS 1-9:1 - VEHICLE PARKING SPACE PER UNIT (BMC38.540.050.6)TOTAL REQUIRED = 312 VEHICLE PARKING SPACESPROVIDED:ON-SITE 9'X18':334 SPACESON-SITE 9'X20':110 SPACESON-SITE GARAGES:77 SPACESON SITE ADA:12 SPACESOFF-SITE 7'X24' (MAX AVE.):21 SPACESTOTAL PROVIDED = 554 PARKING SPACESBICYCLE PARKING:REQUIRED:1 - BICYCLE PARKING SPACE PER UNIT (BMC38.540.050.6)TOTAL REQUIRED = 312 BICYCLE PARKING SPACESPROVIDED:ON-SITE EXTERIOR RACKS68 SPACESIN-UNIT (GROUND FLOOR)104 SPACESGARAGES (2 SPACES EA.)154 SPACES TOTAL PROVIDED = 326 BICYCLE PARKING SPACESSOLID WASTE: AS SHOWN. COVERED TRASH COMPACTOR PROVIDED. TRASH COLLECTION SERVICE WILL BE PROVIDED. SEE NARRATIVE FOR FURTHER INFORMATION.CONCURRENT CONSTRUCTION:CONCURRENT CONSTRUCTION PROPOSED.SEE NARRATIVE FOR FURTHER DETAILS.PHASING: SINGLE PHASE CONSTRUCTION. SEE NARRATIVE FOR SUBPHASE INFORMATION. Sewer Main Design Report Appendix 2 – Subdivision Wastewater Flow Calculations Design Wastewater Usage Analysis Gallatin Center Subdivision Lot A (Planned Residential Development) Lot A: Average Daily Flow Residential Dwelling Units 312 Residents/Unit 2.17 (COB DSSP 5.2.4.B.) Gallons/Capita/Day 64.4 (COB DSSP 5.2.4.B.) Average Daily Demand 43,601 gpd Infiltration Rate Lot Area 16.49 acres Base Infiltration Rate 150 gallons/acre/day Infiltration Rate 2,474 gpd Peaking Factor (COB DSSP 5.2.5) Residential Dwelling Units 312 Residents/Unit 2.17 (COB DSSP 5.2.4.B.) Population 677.04 P = 0.677 (Population/Thousands) =Q(max)= 18 + P 0.50 Q(ave)4 + P 0.50 Peaking Factor = 3.90 Total Demand Average Day Demand 46,075 gpd (Avg. Daily Demand +Infiltration Rate) Peak Hour Demand 179,693 gpd (Avg. Day Demand x Peaking Factor) Peak Hour Demand 7,487 gph Peak Hour Demand 125 gpm Peak Hour Demand 0.28 cfs Peaking Factor x x x x Page 1 Design Wastewater Usage Analysis Gallatin Center Subdivision Lots B-F (Planning Values/ Zoning Based) Lot B: Average Daily Flow Zoning B-2M Area 9.94 acres Domestic Flow + Infiltration Rate 630 gpad COB DSSP Table 5.2.1 Average Daily Flow 6,262 gpd Peaking Factor (COB DSSP 5.2.5) Equivalent Population Total Average Daily Flow 6,262 gpd Per Capita Flow Rate 64.4 gal/capita COB DSSP 5.2.4B Equivalent Population 97 = (6,262 gpd/64.4 gal per capita) =Q(max)= 18 + P 0.50 P = Population/thousands =97/1000 = 0.097 Q(ave)4 + P 0.50 Peaking Factor = 4.25 Peak Hour Demand Average Day Demand 6,262 gpd Peak Hour Demand 26,614 gpd (Avg. Day Demand x Peaking Factor) Peak Hour Demand 1,109 gph Peak Hour Demand 18 gpm Peak Hour Demand 0.04 cfs Peaking Factor Eqivelant Population 4.25 97 4.19 97 4.32 97 4.31 97 4.32 97F4.94 3,112 9 (B-2 Planning values used to reflect Commercial use deed restriction) 0.02 E 5.53 3,484 10 0.02 D 5.08 3,200 10 0.02 C 15.59 9,822 29 0.06 B 9.94 6,262 18 0.04 Peaking Factor The same method was used to calculate wastewater demands for Lots C-F. The table below summarizes the results: Lot Lot Area (Acres) Avg. Daily Demand (gpd) Total Max Hour Usage (gpm) (cfs) x Page 2 Design Wastewater Usage Analysis Gallatin Center Subdivision Lots A-F Commercial (B-2 Planning Values) Commercial (B-2 Planning Values) Commercial (B-2 Planning Values) Commercial (B-2 Planning Values) Commercial (B-2 Planning Values) Lot Total Max Hour Usage (gpm) (cfs) A 125 0.28 A summary of Wastewater Demands calculated for each lot is shown in the table below. Infiltration rates and peaking factors were applied to each lot individually. For Lots B–F, B-2 planning values were used to reflect the commercial land use restriction recorded on these lots. If a developer pursues a non- commercial use, the existing infrastructure must first be reevaluated, and any required upgrades completed, before the restriction can be lifted. Anticipated Land Use High Density Residential B 18 0.04 C 29 0.06 D 10 0.02 E 10 0.02 F 9 0.02 Total: 201 0.44 Page 3 Sewer Main Design Report Appendix 3 – 8” PVC Pipe Capacity Sewer Main Design Report Appendix 4 – Subdivision and Utility Layout S S S S S W W W WWWSSSSSSSSSSSSSSS SWWWWW WWWWWNGNGNGNGNGNGNGFOSTSTUGPUGPUGPUGPUGPUGPFOFOFOXX X X XUGPXXXXNG NG NG NG NG NG NG NGFOFOFOFOFOFOFOFOOHPOHPOHPOHPOHPOHPOHPOHPOHPSSSSSSSSSSSSSSSSSSSSSSSSWWWWWWWSSWWUGTVUGTVUGTVUGTVW W W W W WSSSSSSSS SSUGPUGPUGPNGNGNGPROPOSED 60' PUBLIC R.O.W. LOT A 16.49± ACRES 718,288± SF (PHASE 1) USPS LOT LOT D 5.08± ACRES 221,232± SF (FUTURE PHASES)LOT E 5.53± ACRES 240,745± SF (FUTURE PHASES) LOT F 5.03± ACRES 218,999± SF (FUTURE PHASES) CATTAIL STREET (EXISTING) KIMBERWICKE STREET (EXISTING) RAWHIDE RIDGE ROAD (EXISTING)MAX AVENUE (EXISTING)NORTH 19TH AVENUE (EXISTING)BAXTER LANE (EXISTING)NORTH 25TH AVENUE (FUTURE PHASES)RAWHIDE RIDGE ROAD (PHASE 1) PROPOSED 60' PUBLIC R.O.W. PROPOSED 60' PUBLIC R.O.W. PROPOSED 60' PUBLIC R.O.W. PROPOSED 25' PUBLIC TRAIL EASEMENT EXISTING CURB/ EDGE OF PAVEMENT EXISTING EDGE OF WETLAND (TO BE REALIGNED) EXISTING EDGE OF WETLAND (TO BE REALIGNED) EDGE OF EXISTING WETLAND (TYPICAL) EXISTING 8" PVC SEWER MAIN EXISTING 8" PVC SEWER MAIN STUB EXISTING 8" PVC SEWER MAIN EXISTING 8" PVC SEWER MAIN EXISTING 8" PVC SEWER MAIN EXISTING 12" DI WATER MAIN EXISTING 8" DI WATER MAIN EXISTING 8" DI WATER MAIN EXISTING 8" DI WATER MAIN EXISTING 8" PVC SEWER MAIN EXISTING 8" PVC SEWER MAIN STUB EXISTING HYDRANT (TYPICAL) EXISTING 8" PVC SEWER MAIN STUB EXISTING 8" DI WATER MAIN EXISTING 8" PVC SEWER MAIN EXISTING 8" DI WATER MAIN STUB EXISTING 12" DI WATER MAINEXISTING 24" ASBESTOS CONCRETE SEWER MAIN EXISTING 12" DI WATER MAIN MAX AVENUE (FUTURE PHASES) SARTAIN STREET (FUTURE PHASES) PROPOSED 8" DI WATER MAIN (FUTURE PHASES) PROPOSED 8" PVC SEWER MAIN (FUTURE PHASES) PROPOSED 8" DI WATER MAIN (FUTURE PHASES) PROPOSED 8" PVC SEWER MAIN (FUTURE PHASES) PROPOSED 8" PVC SEWER MAIN (FUTURE PHASES) PROPOSED HYDRANT (FUTURE PHASES) (TYPICAL) PROPOSED SSMH (FUTURE PHASES) (TYPICAL) LOT B 9.94± ACRES 432,807± SF (FUTURE PHASES)LOT C 15.50± ACRES 674,948 SF (FUTURE PHASES) LOT G 0.84± ACRES 36,579 SF (FUTURE PHASES)THOMAS DRIVE (EXISTING)LOT B (REMAINDER LOT/ FUTURE PHASES) 46.15± ACRES 2,010,168± SF K:\Bozeman\Gallatin Center LP\2024381 Gallatin Center\05CAD\Sheets\Preliminary Plat\24381-WATR-SSWR-EXHB.dwg WATER AND SEWER EXHIBIT 10/8/2025 10:44:15 AM DESIGNED BY:DRAWN BY:CHECKED BY:DATE:JRHJRHEWROCTOBER 2025SHEET---NO.DATEREVISIONPREPARED BY BY WATER AND SEWER EXHIBIT GALLATIN CENTER LIMITED PARTNERSHIP BOZEMAN, MT GALLATIN CENTER SUBDIVISION ENGI NEERING PROJECT NO. 2024381 895 TECHNOLOGY BLVD., SUITE 203 BOZEMAN, MT 59718 (406) 586-0262 www.wwcengineering.com 0 SCALE: 1" = 200' 200'100' 28 – Water and Sewer Water Design Report WATER MAIN DESIGN REPORT FOR: GALLATIN CENTER SUBDIVISION BOZEMAN, MT Prepared By: WWC Engineering/Madison 895 Technology Drive, Suite 203 Bozeman, MT 59718 (406) 586-0262 January 2026 895 Technology Boulevard, Suite 203, Bozeman, MT 59718 | 406.586.0262 GALLATIN CENTER MAJOR SUBDIVISION WATER MAIN DESIGN REPORT A. General This design report outlines the preliminary future water main extensions, which are anticipated to be installed with subsequent subdivisions of the proposed remainder lot (Lot B) of this subdivision. The current property is a 68.33-acre parcel (Minor Sub 210, Section 23, Township 01S, Range 05E, Lot 3) located northwest of Baxter Lane and North 19th Avenue in Bozeman, Montana. The timing of construction for these water main improvements has not yet been determined. The water main extensions are proposed to be constructed with future subdivisions, once planned. The water main design, and this report will be subject to separate subdivision reviews once the remainder lot (Lot B) is further subdivided. For this reason, this report is considered preliminary, as it may be revised with future applications. This 2- lot subsequent minor subdivision does not include any water main extension. The following references were used in the preparation of this report: - COB Design Standards and Specifications Policy, 2024 - COB Modifications to Montana Public Works Standard Specifications (MPWSS), Addendum #3. - City of Bozeman Water Facility Plan, 2024 - Circular DEQ-1 - City of Bozeman Infrastructure Viewer - Uniform Plumbing Code Design procedures and parameters from the COB Design Standards and Specifications Policy were followed in the water infrastructure planning for this subdivision. B. Proposed Water System The future water main extension is anticipated to consist of approximately 1,355 linear feet of 8" Class 51 ductile iron pipe. The water main will be looped, connected to the water main stub in Max Avenue, and also connected to the existing water main in North 27th Avenue. The layout of the proposed water main will meet the City of Bozeman design criteria and will be located within the proposed public right-of-way and separated from the proposed sanitary sewer main by a minimum distance of 10 feet. Fire hydrants will be installed at intersections and spaced no more than 500 feet apart, fulfilling the distance requirement for fire hydrant spacing, as well as assisting in flushing of the main. Gate valves will be installed at the connection points to the existing mains and as otherwise required by the City of Bozeman design standards. C. Demand Analysis The Gallatin Center Subdivision property was recently rezoned to the B-2M (Community Business– Mixed) zoning district. While this zoning permits a wide range of uses, the majority of the property is anticipated to be used for commercial development based on the zoning and location. Commercial uses are expected to generate significantly lower water demands compared to other development types permitted within B-2M zoning. For this analysis, the anticipated future lots (to be created from remainder Lot B) were evaluated assuming commercial water demands. Lot A is planned for residential development. Demand estimates for this lot are based on the unit count from the site plan for Lot A, which has been submitted under a separate application (Planning #25693). A site plan overview sheet of proposed Lot A is included in Appendix 1 of this report. Per COB DSSP Section 4.2.4, the analysis assumes 135 gallons per capita per day (gpcd) and an average household size of 2.17 residents per dwelling unit. The remainder lot property (Lot B), is anticipated to consist of 5 developable lots, based on the preliminary anticipated lot layout for the future subdivisions. The calculations refer to these anticipated 5 developable lots as Lots B-F. Because development details for the remainder lot have not yet been finalized, planning values were applied to estimate average daily demands. Anticipated commercial development for the anticipated future lots (Lots B–F) were evaluated using B-2 planning values rather than B-2M values, to align with the likelihood for commercial use. To determine peak demands, a peak hour factor of 3 was applied to the average daily demand, per COB DSSP Table 4.2.3. A fire flow demand of 3,000 gallons per minute was then added to the peak hour flow, based on COB DSSP Table 4.2.4 for Community/Neighborhood Business land uses. Maximum hour demands were calculated for each proposed lot using these parameters. A summary of estimated peak demands is provided in Table 1, with detailed calculations included in Appendix 2. Table 1: Water Demand Calculations Summary Once the property is fully subdivided and developed, the property is estimated to have a peak hour water demand of 7.23 cfs or 3,243 gpm, which includes fire flow. E. Conclusion The Gallatin Center Subdivision property is anticipated to be served by the existing surrounding infrastructure, as well as future water mains installed with future subdivisions of the remainder lot (Lot B). This project will require the approval of the City Engineer and the Montana Department of Environmental Quality. The City of Bozeman has stated that there is a concern for the capacity of the existing infrastructure in place. The City will need to evaluate these water usage demands for the existing system and determine if any off-site water main improvements will be required. Appendices: 1. Lot A Preliminary Site Plan 2. Subdivision Water Demand Calculations 3. Subdivision and Utility Layout Water Main Design Report Appendix 1 – Lot A Preliminary Concept Plan WWWWWWWWWWWWWWXXXXXXXXXXXXSTSTSTOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSWWWWWWWWWWWWWWW W WWWWWWWWWW WW SSSSSSSTWWWWWWWWWWWW SSSS SSSSSSSSSSSS SS SS SS UGTVUGTVUGTVUGTVUGTVUGTVUGTVUGTVUGTVWW W W W W W W S S S SSSS S UGP UGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPUGPNG NGNGNGNGNGNGNGNGNGNGNGNGNGNGS S S S S S S S SSSSSSSSSSSSSSSSSWWWWWWWWWWWWWWWWWWSSSSSSSSS S SSS SWSFSWS FSWS FSWS FSWSFSWSSSSSWWWWWWWWWWWWWWWWW W W W W W W WSSSSSSSSSSSSWSFSFSSS S S SWWSWSWSWSWSSSSSFSWSS STSTSTSTSTSTSTSTSTST ST ST ST SBUILDING 2(TYPE B)CLUBHOUSEBUILDINGFITNESSCENTERBUILDING 4(TYPE B)BUILDING 6(TYPE B)BUILDING 3(TYPE A)BUILDING 7(TYPE A)BUILDING 5(TYPE C)BUILDING 8(TYPE C)BUILDING 1(TYPE C)BUILDING 9(TYPE D)LEASINGOFFICE/MAILROOMFSWS RAWHIDE RIDGE ROAD (EXISTING)MAX AVENUE (EXISTING)KIMBERWICKE STREET (EXISTING) RAWHIDE RIDGE ROAD (TO BE CONSTRUCTED WITH SUBDIVISION) NORTH 27TH AVENUE(C.O.B. CAPITOL IMPROVEMENT)CATTAIL STREET(EXISTING)50' WATERCOURSESETBACK (ZONE 2)30' WATERCOURSESETBACK (ZONE 1)EDGE OF DELINEATEDWETLAND (TYP.)PROPERTY LINE20' UTILITYEASEMENT15' FRONTSETBACK15' FRONTSETBACK 15' FRONT SETBACKPROPERTY LINEEXISTING SIDEWALKEXISTING 8" DI WATER MAINEXISTING 8" PVCSEWER MAINEXISTING 8" DI WATER MAINEXISTING 12" DIWATER MAINEXISTING 12" DIWATER MAINEXISTING 8" PVCSEWER MAIN5' SIDE SETBACKEXISTING 8" PVC SEWER MAINEXISTING OVERHEADPOWEREXISTING 8" DIWATER MAIN STUB(TO BE ABANDONED)EXISTING 8" PVCSEWER MAIN STUB(TO BE ABANDONED)EXISTING STORMCULVERT (TYP.)EXISTING 8" DI WATER MAINEXISTING 8" PVCSEWER MAINEXISTING UNDERGROUND POWEREXISTING UNDERGROUND GASEXISTING 8" PVCSEWER MAINEDGE OF DELINEATEDWETLAND (TYP.)25.0' WIDE PUBLICTRAIL CORRIDOREASEMENTPROPOSED 30.0'UTILITY EASEMENTPROPOSED 30.0'UTILITY EASEMENTPROPOSED 30.0'UTILITY EASEMENTPROPOSED 30.0'UTILITY EASEMENTPROPOSED 30.0'UTILITY EASEMENTEXISTING UNDERGROUND TVEXISTING FENCEEXISTING HYDRANTEXISTING HYDRANTEXISTING HYDRANTEXISTING HYDRANT70.0' WIDE PUBLIC OPEN SPACE/LINEAR TRAIL & STREAMCORRIDOR EASEMENTBUILDING 2(TYPE B)OPEN SPACE AREA(AMMENITIES)PARKLAND(SEE LANDSCAPING SHEETSFOR DETAILS)PARKLAND(SEE LANDSCAPINGSHEETS FOR DETAILS)CLUBHOUSEBUILDINGFITNESSCENTERBUILDING 4(TYPE B)BUILDING 6(TYPE B)BUILDING 3(TYPE A)BUILDING 7(TYPE A)BUILDING 5(TYPE C)BUILDING 8(TYPE C)BUILDING 1(TYPE C)BUILDING 9(TYPE D)WEST CATRON CREEKWEST CATRON CREEK5' SIDE SETBACKEXISTING PERMITTEDCULVERT CROSSINGLEASINGOFFICE/MAILROOM5' PUBLIC ACCESSEASEMENTEXISTING STORMWATERDETENTION POND(OUTLET TO EAST CATRON CREEK)OPEN SPACEAREA(DOG PARK)0SCALE: 1" = 50'50'25'LINE STYLE LEGENDXXOOFMFMFOFO[ ][ ]IRIRNGNGOHPOHPOHTOHTWWUGTVUGTVUGTUGTUGPUGPSTSTSSSSRWRWOHTVOHTVFFXXOOFMFMFOFO[ ][ ]FFIRIRNGNGOHPOHPOHTOHTWWUGTVUGTVUGTUGTUGPUGPSTSTSSSSRWRWOHTVOHTVEXISTINGPROPOSEDFENCE [BARBED]FENCE [CHAIN]FORCEMAINFIBER OPTICFENCE [PRIVACY]FIRE LINEIRRIGATION LINENATURAL GASOVERHEAD POWEROVERHEAD TELEPHONEUNDERGROUND TVUNDERGROUND TELEPHONEUNDERGROUND POWERSTORMWATERSEWERRAW WATEROVERHEAD TVMAJOR CONTOURMINOR CONTOURK:\Bozeman\Thompson Thrift\2024525 Gallatin Center Development\05CAD\Sheets\Site\24525-SITE_DIM_PLAN.dwg OVERALL SITE PLAN 11/14/2025 7:39:55 AM DESIGNED BY:DRAWN BY:CHECKED BY:DATE:JRHJRHEWR/CGBNOV. 2025SHEETC400NO.DATEREVISIONPREPARED BY BY SITE PLAN OVERVIEW SITE PLAN BOZEMAN, MT THOMPSON THRIFT MULTIFAMILY COMMUNITY ENGINEERING PROJECT NO. 2024525 895 TECHNOLOGY BLVD., SUITE 203 BOZEMAN, MT 59718 (406) 586-0262 www.wwcengineering.com PROJECT:THOMPSON THRIFT MULTIFAMILY COMMUNITYLEGAL DESC:GALLATIN CENTER SUBDIVISION PHASE 5, LOT A(TO BE FINALIZED WITH GALLATIN CENTER SUBDIVISION PHASE 5)SUBDIVISION CURRENT LEGAL DESC.: MINOR SUB 210, S35, T01 S, R05 E, Lot 3, ACRES 68.331, (RE-MAINDER) LESS GALLATIN CENTER SUB PHASE 1-4ZONING: B-2M (REGIONAL COMMERCIAL AND SERVICES)SITE AREAS:LOT AREA:718,303± SF16.49 AC(100%)PARKLAND DEDICATION:68,389± SF1.57 AC(9.5%)WATERCOURSE SETBACKS:186,436± SF4.28 AC(26.0%)NET RESIDENTIAL AREA:463,478± SF10.64 AC(64.5%)LANDSCAPED AREA:66,211± SF1.52 AC(9.2%)IMPERVIOUS AREA:285,291± SF6.55 AC(39.7%)ROOF AREA:111,976± SF2.57 AC(15.6%)BLOCK FRONTAGE:RAWHIDE RIDGE ROAD: MIXEDCATTAIL STREET: MIXEDMAX AVENUE: MIXEDTHOMAS DRIVE: LANDSCAPEDNORTH 27TH AVENUE: TBDSITE LIGHTING:AS SHOWN ON SHEET LP1SNOW STORAGE:AS SHOWN ON SHEETS C401-C402PARKLAND:REQUIRED: 2.55 AC (SEE PARKLAND TRACKING TABLE IN NARRATIVE)PROVIDED:1.57 AC (PROPOSED PARKLAND DEDICATION. SEE SITE PLAN)0.98 AC ( C.I.L.P/I.I.L.P)TOTAL PROVIDED = 2.55 ACOPEN SPACE:REQUIRED:BUILDINGS 1-9:100 SF/ 1-BED UNIT150 SF/ 2+ BED UNIT120 1 BED UNITS * 100 SF = 12,000 SF192 2+ BED UNITS * 150 SF = 28,800 SFTOTAL = 40,800 SFPROVIDED:BALCONIES/PATIOS20,400 SFINDOOR RECREATIONAL AREAS 5,015 SFSHARED OPEN SPACE (DOG PARK) 8,396 SFSHARED OPEN SPACE (AMMENITIES AREA)16,373 SFTOTAL PROVIDED = 50184 SF (123% OF REQUIRED)*SEE SHEET C404 FOR OPEN SPACE AREAS.VEHICLE PARKING:REQUIRED:BUILDINGS 1-9:1 - VEHICLE PARKING SPACE PER UNIT (BMC38.540.050.6)TOTAL REQUIRED = 312 VEHICLE PARKING SPACESPROVIDED:ON-SITE 9'X18':334 SPACESON-SITE 9'X20':110 SPACESON-SITE GARAGES:77 SPACESON SITE ADA:12 SPACESOFF-SITE 7'X24' (MAX AVE.):21 SPACESTOTAL PROVIDED = 554 PARKING SPACESBICYCLE PARKING:REQUIRED:1 - BICYCLE PARKING SPACE PER UNIT (BMC38.540.050.6)TOTAL REQUIRED = 312 BICYCLE PARKING SPACESPROVIDED:ON-SITE EXTERIOR RACKS68 SPACESIN-UNIT (GROUND FLOOR)104 SPACESGARAGES (2 SPACES EA.)154 SPACES TOTAL PROVIDED = 326 BICYCLE PARKING SPACESSOLID WASTE: AS SHOWN. COVERED TRASH COMPACTOR PROVIDED. TRASH COLLECTION SERVICE WILL BE PROVIDED. SEE NARRATIVE FOR FURTHER INFORMATION.CONCURRENT CONSTRUCTION:CONCURRENT CONSTRUCTION PROPOSED.SEE NARRATIVE FOR FURTHER DETAILS.PHASING: SINGLE PHASE CONSTRUCTION. SEE NARRATIVE FOR SUBPHASE INFORMATION. Water Main Design Report Appendix 2 – Subdivision Water Demand Calculations Design Water Usage Analysis Gallatin Center Subdivision Lot A (Planned Residential Development) Lot A: Average Day Demand Residential Dwelling Units 312 Residents/Unit 2.17 (COB DSSP 4.2.4.B.) Gallons/Capita/Day 135 (COB DSSP 4.2.4.B.) Average Daily Demand 91,400 gpd Peak Hour Water Usage Peaking Factor = 3.0 COB DSSP Table 4.2.3 Average Daily Usage 91,400 gpd Maximum Hour Usage 274,200 gpd (Avg. Daily Demand x Peaking Factor) Maximum Hour Usage 11,425 gph Maximum Hour Usage 190 gpm Maximum Hour Usage 0.42 cfs Fire Flow Demand Design Fire Flow = 3,000 gpm COB DSSP Table 4.2.4 (Medium and High Density Residential) Total Demand Total Max. Hour Usage 3,190 gpm (Max. Hour Usage + Fire Flow) Total Max. Hour Usage 7.11 cfs (Max. Hour Usage + Fire Flow) x x Page 1 Design Water Usage Analysis Gallatin Center Subdivision Lots B-F (Planning Values/Zoning Based) Lot B: Average Day Demand Zoning B-2M Area 9.94 acres Average Day Demand 614 gpad COB DSSP Table 4.2.2 Average Daily Demand 6,103 gpd Peak Hour Water Usage Peaking Factor = 3.0 COB DSSP Table 4.2.3 Average Daily Usage 6,103 gpd Maximum Hour Usage 18,309 gpd (Avg. Daily Demand x Peaking Factor) Maximum Hour Usage 762.9 gph Maximum Hour Usage 13 gpm Maximum Hour Usage 0.03 cfs Fire Flow Demand Design Fire Flow = 3,000 gpm COB DSSP Table 4.2.4 Total Demand Total Max. Hour Usage 3,013 gpm (Max. Hour Usage + Fire Flow) Total Max. Hour Usage 6.71 cfs (Max. Hour Usage + Fire Flow) B D 6 3013 Peak Hour Demand (gpm) Avg. Daily Demand (gpd) Lot Area (Acres)Lot Total Max Hour Usage (Includes Fire Flow) (gpm) (cfs) 6.719.94 6.73 6.70 6.70 6.70 20 5.08 5.53 4.94 6 7 The same method was used to calculate water demands for Lots C-F. 9,572 3,119 3,395 15.59C E F 3,033 (B-2 Planning values used to reflect Commercial use deed restiction) 3020 3006 3007 3006 6,103 13 (Community and Neighborhood Business/ High Density Residential) x Page 2 Design Water Usage Analysis Gallatin Center Subdivision Lots A-F Commercial (B-2 Planning Values) Anticipated Land Use High Density Residential Commercial (B-2 Planning Values) Commercial (B-2 Planning Values) Commercial (B-2 Planning Values) Commercial (B-2 Planning Values) Lot Total Max Hour Usage (gpm) (cfs) C 20 0.04 B 13 0.03 A summary of water demands for each lot is provided in the table below. Fire flow has been applied only to the Total Demand values shown. For Lots B–F, B-2 planning values were used to reflect the commercial land use restriction recorded on these lots. If a developer pursues a non-commercial use, the existing infrastructure must first be reevaluated, and any required upgrades completed, before the restriction can be lifted. E 7 0.02 D 6 0.01 A 190 0.42 243 (3,243) 0.53 (7.23) Total: (With Fire Flow) F 6 0.01 Page 3 Water Main Design Report Appendix 3 – Subdivision and Utility Layout S S S S S W W W WWWSSSSSSSSSSSSSSS SWWWWW WWWWWNGNGNGNGNGNGNGFOSTSTUGPUGPUGPUGPUGPUGPFOFOFOXX X X XUGPXXXXNG NG NG NG NG NG NG NGFOFOFOFOFOFOFOFOOHPOHPOHPOHPOHPOHPOHPOHPOHPSSSSSSSSSSSSSSSSSSSSSSSSWWWWWWWSSWWUGTVUGTVUGTVUGTVW W W W W WSSSSSSSS SSUGPUGPUGPNGNGNGPROPOSED 60' PUBLIC R.O.W. LOT A 16.49± ACRES 718,288± SF (PHASE 1) USPS LOT LOT D 5.08± ACRES 221,232± SF (FUTURE PHASES)LOT E 5.53± ACRES 240,745± SF (FUTURE PHASES) LOT F 5.03± ACRES 218,999± SF (FUTURE PHASES) CATTAIL STREET (EXISTING) KIMBERWICKE STREET (EXISTING) RAWHIDE RIDGE ROAD (EXISTING)MAX AVENUE (EXISTING)NORTH 19TH AVENUE (EXISTING)BAXTER LANE (EXISTING)NORTH 25TH AVENUE (FUTURE PHASES)RAWHIDE RIDGE ROAD (PHASE 1) PROPOSED 60' PUBLIC R.O.W. PROPOSED 60' PUBLIC R.O.W. PROPOSED 60' PUBLIC R.O.W. PROPOSED 25' PUBLIC TRAIL EASEMENT EXISTING CURB/ EDGE OF PAVEMENT EXISTING EDGE OF WETLAND (TO BE REALIGNED) EXISTING EDGE OF WETLAND (TO BE REALIGNED) EDGE OF EXISTING WETLAND (TYPICAL) EXISTING 8" PVC SEWER MAIN EXISTING 8" PVC SEWER MAIN STUB EXISTING 8" PVC SEWER MAIN EXISTING 8" PVC SEWER MAIN EXISTING 8" PVC SEWER MAIN EXISTING 12" DI WATER MAIN EXISTING 8" DI WATER MAIN EXISTING 8" DI WATER MAIN EXISTING 8" DI WATER MAIN EXISTING 8" PVC SEWER MAIN EXISTING 8" PVC SEWER MAIN STUB EXISTING HYDRANT (TYPICAL) EXISTING 8" PVC SEWER MAIN STUB EXISTING 8" DI WATER MAIN EXISTING 8" PVC SEWER MAIN EXISTING 8" DI WATER MAIN STUB EXISTING 12" DI WATER MAINEXISTING 24" ASBESTOS CONCRETE SEWER MAIN EXISTING 12" DI WATER MAIN MAX AVENUE (FUTURE PHASES) SARTAIN STREET (FUTURE PHASES) PROPOSED 8" DI WATER MAIN (FUTURE PHASES) PROPOSED 8" PVC SEWER MAIN (FUTURE PHASES) PROPOSED 8" DI WATER MAIN (FUTURE PHASES) PROPOSED 8" PVC SEWER MAIN (FUTURE PHASES) PROPOSED 8" PVC SEWER MAIN (FUTURE PHASES) PROPOSED HYDRANT (FUTURE PHASES) (TYPICAL) PROPOSED SSMH (FUTURE PHASES) (TYPICAL) LOT B 9.94± ACRES 432,807± SF (FUTURE PHASES)LOT C 15.50± ACRES 674,948 SF (FUTURE PHASES) LOT G 0.84± ACRES 36,579 SF (FUTURE PHASES)THOMAS DRIVE (EXISTING)LOT B (REMAINDER LOT/ FUTURE PHASES) 46.15± ACRES 2,010,168± SF K:\Bozeman\Gallatin Center LP\2024381 Gallatin Center\05CAD\Sheets\Preliminary Plat\24381-WATR-SSWR-EXHB.dwg WATER AND SEWER EXHIBIT 10/8/2025 10:44:15 AM DESIGNED BY:DRAWN BY:CHECKED BY:DATE:JRHJRHEWROCTOBER 2025SHEET---NO.DATEREVISIONPREPARED BY BY WATER AND SEWER EXHIBIT GALLATIN CENTER LIMITED PARTNERSHIP BOZEMAN, MT GALLATIN CENTER SUBDIVISION ENGI NEERING PROJECT NO. 2024381 895 TECHNOLOGY BLVD., SUITE 203 BOZEMAN, MT 59718 (406) 586-0262 www.wwcengineering.com 0 SCALE: 1" = 200' 200'100'