27 - Agricultural Water User Facilities
Please see the responses below to the items in Section 38.220.060 – Additional Subdivision
Preliminary Plat Supplements in the Bozeman Municipal Code.
a. Type, description, ownership, and users of facilities.
Two watercourses run south to north through the property: East Catron Creek and West
Catron Creek. The property owner believes that West Catron Creek may function as an
irrigation ditch maintained by Farmer’s Canal. A Farmer’s Canal representative, Dan
Triemstra, confirmed that one of the creeks on the property is used for Farmer’s Canal
irrigation services.
b. Written documentation demonstrating active use of the facilities, for example the delivery of
non-potable water supplies for irrigation, conversion to storm water facilities, or other use. If a
facility is not being actively used nor intended to be used in the future, include a written plan for
discontinuance including all documentation required pursuant to Montana Law.
An authorized representative of Farmer’s Canal, Dan Triemstra, was contacted to provide
comments on the proposed subdivision and to identify any known water users who should
be notified. Mr. Triemstra responded, stating that he does not anticipate any adverse
impacts to the ditch infrastructure or operation from the subdivision improvements. He did
not identify any downstream water users to be notified. The Farmer’s Canal
correspondence is included in this section.
A water rights search was conducted using the DNRC Water Rights Query System to
identify any owners associated with the property. Two Statements of Claim were found,
both listing the same owners. The DNRC Water Rights Statements of Claim are included in
this section. In compliance with BMC Section 38.360.280, water rights owners were notified
of the proposed subdivision by mail sent to the addresses listed in the Statements of Claim.
Copies of the water rights owner correspondence are included in this section. No comments
have been received from the contacted owners.
c. Describe any proposed realignment. All realignments must comply with all relevant
requirements of Montana Law.
No realignments are proposed with the subdivision.
d. Information from the owner(s) of the facility concerning the proposed use or discontinuance of
the facility.
The water rights owners did not provide any comments during the 45-day notice period,
which terminated on June 2, 2025. A Farmer’s Canal representative, Dan Triemstra stated
that he does not anticipate any adverse impacts to the ditch infrastructure or operation
from the subdivision improvements.
27 – Agricultural Water User Facilities
DNRC Water Rights Statement of Claim
April 17, 2025
41H 117305-00
Page 1 of 3
General Abstract
STATE OF MONTANA
DEPARTMENT OF NATURAL RESOURCES AND CONSERVATION
1424 9TH AVENUE P.O. BOX 201601 HELENA, MONTANA 59620-1601
GENERAL ABSTRACT
Water Right Number:41H 117305-00 STATEMENT OF CLAIM
Version:3 -- POST DECREE
Version Status:ACTIVE
Owners:2B HOLDINGS LLC
81 JEFFERSON RIVER RD
THREE FORKS, MT 59752-9765
AUTO XTREME INC
18601 LYNDON B JOHNSON FWY STE 525
MESQUITE, TX 75150-5614
BOZEMAN 6 LLC
600 S MAIN ST
BUTTE, MT 59701-2534
BW BOZEMAN LLC
1075 N MAIN ST STE 120
LOGAN, UT 84341-3106
GKT GALLATIN SHOPPING CENTER CC LLC
% TKG MANAGEMENT LLC
211 N STADIUM BLVD STE 201
COLUMBIA, MO 65203
GKT GALLATIN SHOPPING CENTER SX LLC
% TKG MANAGMENT INC
211 N STADIUM BLVD STE 201
COLUMBIA, MO 65203
GKT GALLATIN SHOPPING CENTER VM LLC
% TKG MANAGEMENT LLC
211 N STADIUM BLVD STE 201
COLUMBIA, MO 65203
GLACIER LODGING LLC
857 W WASHINGTON ST STE 301
MARQUETTE, MI 49855-4176
INTREPID CREDIT UNION
PO BOX 159
HELENA, MT 59624
Priority Date:NOVEMBER 2, 1895
Enforceable Priority Date:NOVEMBER 2, 1895
Type of Historical Right:FILED
Purpose (Use):IRRIGATION
Irrigation Type:FLOOD
Maximum Flow Rate:2.88 CFS
April 17, 2025
41H 117305-00
Page 2 of 3
General Abstract
Maximum Volume:THE TOTAL VOLUME OF THIS WATER RIGHT SHALL NOT EXCEED THE AMOUNT
PUT TO HISTORICAL AND BENEFICIAL USE.
Climatic Area:4 - MODERATELY LOW
Maximum Acres:160.00
Source Name:UNNAMED TRIBUTARY OF EAST GALLATIN RIVER
Source Type:SURFACE WATER
Point of Diversion and Means of Diversion:
ID Govt Lot Qtr Sec Sec Twp Rge County
1 SWSWSE 35 1S 5E GALLATIN
Period of Diversion:APRIL 1 TO OCTOBER 1
Diversion Means:HEADGATE
Period of Use:APRIL 1 to OCTOBER 1
Place of Use:
ID Acres Govt Lot Qtr Sec Sec Twp Rge County
1 60.00 W2SE 35 1S 5E GALLATIN
2 70.00 W2NE 35 1S 5E GALLATIN
3 30.00 W2E2NE 35 1S 5E GALLATIN
Total:160.00
Geocodes/Valid:06-0904-35-1-05-01-0000 - Y 06-0904-35-1-05-03-0000 - Y
06-0904-35-1-05-25-0000 - Y 06-0904-35-1-05-30-0000 - Y
06-0904-35-1-37-01-0000 - Y 06-0904-35-1-37-15-0000 - Y
06-0904-35-1-37-20-0000 - Y 06-0904-35-1-40-01-0000 - Y
06-0904-35-1-40-05-0000 - Y 06-0904-35-1-40-10-0000 - Y
06-0904-35-1-40-15-0000 - Y 06-0904-35-1-45-01-0000 - Y
06-0904-35-1-45-05-0000 - Y 06-0904-35-1-50-01-0000 - Y
06-0904-35-1-50-04-0000 - Y 06-0904-35-1-50-06-0000 - Y
06-0904-35-1-50-08-0000 - Y 06-0904-35-1-50-10-0000 - Y
06-0904-35-4-15-15-0000 - Y
Remarks:
THE WATER RIGHTS FOLLOWING THIS STATEMENT ARE SUPPLEMENTAL WHICH MEANS THE RIGHTS HAVE
OVERLAPPING PLACES OF USE. THE RIGHTS CAN BE COMBINED TO IRRIGATE ONLY OVERLAPPING PARCELS.
EACH RIGHT IS LIMITED TO THE FLOW RATE AND PLACE OF USE OF THAT INDIVIDUAL RIGHT. THE SUM TOTAL
VOLUME OF THESE WATER RIGHTS SHALL NOT EXCEED THE AMOUNT PUT TO HISTORICAL AND BENEFICIAL
USE.
117304-00 117305-00
THE WATER RIGHTS LISTED FOLLOWING THIS STATEMENT ARE MULTIPLE USES OF THE SAME RIGHT.
41H 114950-00, 41H 114953-00, 41H 117305-00
OWNERSHIP UPDATE RECEIVED
OWNERSHIP UPDATE TYPE DOR # 154216 RECEIVED 05/17/2012.
OWNERSHIP UPDATE TYPE DOR # 154201 RECEIVED 11/10/2014.
OWNERSHIP UPDATE TYPE DOR # 161303 RECEIVED 12/01/2016.
OWNERSHIP UPDATE TYPE DOR # 219165 RECEIVED 12/20/2019.
April 17, 2025
41H 117305-00
Page 3 of 3
General Abstract
OWNERSHIP UPDATE TYPE DOR # 214792 RECEIVED 04/03/2020.
OWNERSHIP UPDATE TYPE DOR # 241334 RECEIVED 07/13/2022.
OWNERSHIP UPDATE TYPE DOR # 244313 RECEIVED 10/03/2022.
OWNERSHIP UPDATE TYPE 608 # 260173 RECEIVED 03/29/2024.
April 17, 2025
41H 117304-00
Page 1 of 3
General Abstract
STATE OF MONTANA
DEPARTMENT OF NATURAL RESOURCES AND CONSERVATION
1424 9TH AVENUE P.O. BOX 201601 HELENA, MONTANA 59620-1601
GENERAL ABSTRACT
Water Right Number:41H 117304-00 STATEMENT OF CLAIM
Version:3 -- POST DECREE
Version Status:ACTIVE
Owners:2B HOLDINGS LLC
81 JEFFERSON RIVER RD
THREE FORKS, MT 59752-9765
AUTO XTREME INC
18601 LYNDON B JOHNSON FWY STE 525
MESQUITE, TX 75150-5614
BOZEMAN 6 LLC
600 S MAIN ST
BUTTE, MT 59701-2534
BW BOZEMAN LLC
1075 N MAIN ST STE 120
LOGAN, UT 84341-3106
GKT GALLATIN SHOPPING CENTER CC LLC
% TKG MANAGEMENT LLC
211 N STADIUM BLVD STE 201
COLUMBIA, MO 65203
GKT GALLATIN SHOPPING CENTER SX LLC
% TKG MANAGMENT INC
211 N STADIUM BLVD STE 201
COLUMBIA, MO 65203
GKT GALLATIN SHOPPING CENTER VM LLC
% TKG MANAGEMENT LLC
211 N STADIUM BLVD STE 201
COLUMBIA, MO 65203
GLACIER LODGING LLC
857 W WASHINGTON ST STE 301
MARQUETTE, MI 49855-4176
INTREPID CREDIT UNION
PO BOX 159
HELENA, MT 59624
Priority Date:MAY 1, 1918
Enforceable Priority Date:MAY 1, 1918
Type of Historical Right:FILED
Purpose (Use):IRRIGATION
Irrigation Type:FLOOD
Maximum Flow Rate:1.63 CFS
April 17, 2025
41H 117304-00
Page 2 of 3
General Abstract
Maximum Volume:THE TOTAL VOLUME OF THIS WATER RIGHT SHALL NOT EXCEED THE AMOUNT
PUT TO HISTORICAL AND BENEFICIAL USE.
Climatic Area:4 - MODERATELY LOW
Maximum Acres:160.00
Source Name:UNNAMED TRIBUTARY OF EAST GALLATIN RIVER
Source Type:SURFACE WATER
Point of Diversion and Means of Diversion:
ID Govt Lot Qtr Sec Sec Twp Rge County
1 SWSWSE 35 1S 5E GALLATIN
Period of Diversion:APRIL 1 TO OCTOBER 1
Diversion Means:HEADGATE
Period of Use:APRIL 1 to OCTOBER 1
Place of Use:
ID Acres Govt Lot Qtr Sec Sec Twp Rge County
1 60.00 W2SE 35 1S 5E GALLATIN
2 70.00 W2NE 35 1S 5E GALLATIN
3 30.00 W2E2NE 35 1S 5E GALLATIN
Total:160.00
Geocodes/Valid:06-0904-35-1-05-01-0000 - Y 06-0904-35-1-05-03-0000 - Y
06-0904-35-1-05-25-0000 - Y 06-0904-35-1-05-30-0000 - Y
06-0904-35-1-37-01-0000 - Y 06-0904-35-1-37-15-0000 - Y
06-0904-35-1-37-20-0000 - Y 06-0904-35-1-40-01-0000 - Y
06-0904-35-1-40-05-0000 - Y 06-0904-35-1-40-10-0000 - Y
06-0904-35-1-40-15-0000 - Y 06-0904-35-1-45-01-0000 - Y
06-0904-35-1-45-05-0000 - Y 06-0904-35-1-50-01-0000 - Y
06-0904-35-1-50-04-0000 - Y 06-0904-35-1-50-06-0000 - Y
06-0904-35-1-50-08-0000 - Y 06-0904-35-1-50-10-0000 - Y
06-0904-35-4-01-10-0000 - Y 06-0904-35-4-01-30-0000 - Y
06-0904-35-4-15-15-0000 - Y
Remarks:
THE WATER RIGHTS FOLLOWING THIS STATEMENT ARE SUPPLEMENTAL WHICH MEANS THE RIGHTS HAVE
OVERLAPPING PLACES OF USE. THE RIGHTS CAN BE COMBINED TO IRRIGATE ONLY OVERLAPPING PARCELS.
EACH RIGHT IS LIMITED TO THE FLOW RATE AND PLACE OF USE OF THAT INDIVIDUAL RIGHT. THE SUM TOTAL
VOLUME OF THESE WATER RIGHTS SHALL NOT EXCEED THE AMOUNT PUT TO HISTORICAL AND BENEFICIAL
USE.
117304-00 117305-00
OWNERSHIP UPDATE RECEIVED
OWNERSHIP UPDATE TYPE DOR # 154216 RECEIVED 05/17/2012.
OWNERSHIP UPDATE TYPE DOR # 154201 RECEIVED 11/10/2014.
OWNERSHIP UPDATE TYPE DOR # 161303 RECEIVED 12/01/2016.
OWNERSHIP UPDATE TYPE DOR # 219165 RECEIVED 12/20/2019.
OWNERSHIP UPDATE TYPE DOR # 214792 RECEIVED 04/03/2020.
April 17, 2025
41H 117304-00
Page 3 of 3
General Abstract
OWNERSHIP UPDATE TYPE DOR # 241334 RECEIVED 07/13/2022.
OWNERSHIP UPDATE TYPE DOR # 244313 RECEIVED 10/03/2022.
OWNERSHIP UPDATE TYPE 608 # 260173 RECEIVED 03/29/2024.
27 – Agricultural Water User Facilities
Farmer’s Canal Correspondence
1
Joselyn Hartwig
From:Erik Ringsak
Sent:Friday, December 12, 2025 12:29 PM
To:Dan Triemstra
Cc:Joselyn Hartwig
Subject:RE: Gallatin Center Subdivision - Culvert Replacement
Thank you, Dan.
Have a great weekend.
Erik Ringsak, P.E. | Civil Department Manager
895 Technology Blvd, Ste 203 | Bozeman, MT 59718
O: 406.586.0262 | D: 406.898.3446 | C: 701.471.1099
www.wwcengineering.com
From: Dan Triemstra <danbevt@gmail.com>
Sent: Friday, December 12, 2025 12:11 PM
To: Erik Ringsak <eringsak@wwcengineering.com>
Cc: Joselyn Hartwig <jhartwig@wwcengineering.com>
Subject: Re: Gallatin Center Subdivision - Culvert Replacement
WARNING: This email originated from an external sender. Please use caution when clicking links or opening
attachments.
Eric,
We do not anticipate that this culvert replacement will cause any adverse effect for the Catron ditch.
Thank you,
Dan Triemstra, Secretary
Farmers Canal Company
On Wed, Dec 10, 2025 at 3:28 PM Erik Ringsak <eringsak@wwcengineering.com> wrote:
Dan,
Great to speak with you again. As part of this project, we are now proposing to replace the existing 24” x 36”
RCP culvert with a larger pipe to provide adequate conveyance during major flood events and to comply with
City of Bozeman standards. The culvert is located just west of the existing Rawhide Ridge Road at the
proposed West Catron Creek crossing.
An exhibit is attached highlighting the culvert location proposed for replacement.
2
Per City of Bozeman regulations, we are requesting your approval to proceed with this culvert replacement as
part of the Rawhide Ridge Road extension construction, since West Catron Creek is believed to function as a
Farmer’s Canal irrigation lateral.
Please let me know if you have any questions or would like to discuss further.
Thank you,
Erik Ringsak, P.E. | Civil Department Manager
895 Technology Blvd, Ste 203 | Bozeman, MT 59718
O: 406.586.0262 | D: 406.898.3446 | C: 701.471.1099
www.wwcengineering.com
1
Joselyn Hartwig
From: Dan Triemstra <danbevt@gmail.com>
Sent: Wednesday, August 6, 2025 7:53 PM
To: Joselyn Hartwig <jhartwig@wwcengineering.com>
Subject: Re: Gallatin Center Subdivision - Notification Letter
WARNING: This email originated from an external sender. Please use caution when clicking links or opening
attachments.
To whom it may concern,
Farmers Canal Company does not anticipate any adverse effects on ditch infrastructure or operation
from this proposed development. Ms. Hartwig has stated that the Catron ditch will not be disturbed
where it passes through the property.
Respectfully,
Dan Triemstra,
Secretary
Farmers Canal Company
On Wed, Jul 30, 2025, 12:43 PM Joselyn Hartwig <jhartwig@wwcengineering.com> wrote:
Hi Dan,
We spoke about this on the phone a couple of months ago. The City has left another comment requesting
written correspondence from Farmer’s Canal.
See below:
I have attached the subdivision layout with the proposed roadways shown for your reference.
If you have a minute, I would really appreciate if you could provide a written response to this.
Thank you,
2
Joselyn Hartwig | Associate Engineer
895 Technology Blvd, Ste 203 | Bozeman, MT 59718
O: 406.586.0262 | D: 406.898.3448
www.wwcengineering.com
From: Joselyn Hartwig
Sent: Monday, May 5, 2025 7:34 AM
To: 'danbevt@gmail.com' <danbevt@gmail.com>
Subject: RE: Gallatin Center Subdivision - Notification Letter
Hi Dan,
Just following up on this. I know we spoke on the phone last week, but if you have a moment to respond to
this email with the information you stated, and any other information discovered since then, it would be greatly
appreciated.
I appreciate your time and input on this!
Thanks,
JOSELYN HARTWIG | Associate Engineer
895 Technology Blvd, Ste 203 | Bozeman, MT 59718
O: 406.586.0262 | D: 406.898.3448
www.wwcengineering.com
From: Joselyn Hartwig
Sent: Tuesday, April 15, 2025 3:34 PM
To: danbevt@gmail.com
Subject: Gallatin Center Subdivision - Notification Letter
Dan,
3
As part of the Bozeman Municipal Code noticing requirements, we are providing this notification letter on
behalf of our client, Gallatin Center Limited Partnership, LLC. The proposed Gallatin Center Subdivision aims
to create 6-lots from the existing property. The subdivision is located just west of North 19th Avenue, south of
Cattail Street, east of Thomas Drive, and north of Baxter Lane. The property owner believes that the ditch
lateral on the property is maintained by Farmer’s Canal. We are not proposing to disturb the lateral with the
subdivision or improvements.
Let me know if you have any questions or concerns.
Thank you,
JOSELYN HARTWIG | Associate Engineer
895 Technology Blvd, Ste 203 | Bozeman, MT 59718
O: 406.586.0262 | D: 406.898.3448
www.wwcengineering.com
27 – Agricultural Water User Facilities
Water Rights Owner Correspondence
895 Technology Blvd, Suite 203 Bozeman, MT 59718 (406) 586-0262
895 Technology Boulevard, Suite 203, Bozeman, MT 59718 | 406.586.0262
April 17th, 2025
RE: Gallatin Center Major Subdivision – Water Rights Owner Notification
Dear Recipient,
On behalf of our client, and as part of the subdivision review process, we are providing this
written notification to inform you of the presence of a watercourse tied to your water right near
or within the proposed Gallatin Center Subdivision boundaries, and to request any comments you
may have regarding the proposed development.
The project site is situated south of Cattail Street, west of North 19th Avenue, north of Baxter
Lane, and east of Thomas Drive. The current legal description of the property is Minor
Subdivision 210, S35, T01 S, R05 E, Lot 3. The geocode listed on the Montana Cadastral
website is 06-0904-35-1-05-01-0000. Two water courses run south to north through the property.
A search on the DNRC Water Rights Query System was used to identify any known water rights
owners.
As part of the proposed subdivision, Rawhide Ridge Road will be extended west from Max
Avenue to Thomas Drive (future North 27th Avenue). This extension will cross the watercourse
on the west portion of the property at an existing, permitted crossing. Additionally, a public trail
is proposed that will also cross the watercourse at an existing, permitted location. No impacts to
the watercourses are proposed as part of this development phase. There will be no
modifications or alterations to the permitted crossings or watercourses with these initial
improvements.
A layout of the proposed subdivision and associated improvements is attached for your
reference. Please note that the only roadway extension included in this phase is the extension of
Rawhide Ridge Road. All other roadway extensions are planned for future development phases
and will be subject to separate review and comment solicitation.
Please respond at your earliest convenience with any comments or questions to the email
provided below, or feel free to contact me directly at 406-586-0262. Please note that you will
have 45 days to respond to this notification per BMC Section 38.360.280.B.
Thank you for your time and consideration.
Sincerely,
________________________
Joselyn Hartwig, EI
jhartwig@wwcengineering.com
WWWWWWWWWWOH
P
OH
P
OH
P
NGNGNGNGNGNGNGFOUGPUGPUGPUGPUGPUGPFOFOFOXX X X
XUGPXXXXNG NG NG NG NG NG NG NGFOFOFOFOFOFOFOFOOHPOHPOHPOHPOHPOHPOHPOHPOHPSSSSSSSSSSSSSSSSSSSSSSSSWWWWWWWSSWWUGTVUGTVUGTVUGTVW
W W W W WSSSSSSSS SS
PROPOSED
60' PUBLIC R.O.W.
LOT A
16.53± ACRES
720,146± SF
LOT B
9.89± ACRES
430,981± SF
(FUTURE PHASES)
LOT C
16.43± ACRES
715,692 SF
(FUTURE PHASES)
USPS LOT
LOT D
5.08± ACRES
221,232± SF
(FUTURE PHASES)LOT E
5.53± ACRES
240,745± SF
(FUTURE PHASES)
LOT F
4.94± ACRES
214,954± SF
(FUTURE PHASES)
CATTAIL STREET (EXISTING)
KIMBERWICKE STREET (EXISTING)
RAWHIDE RIDGE ROAD (EXISTING)MAX AVENUE (EXISTING)NORTH 27TH AVENUE (COB 2025 CAPITOL IMPROVEMENT)NORTH 19TH AVENUE (EXISTING)BAXTER LANE (EXISTING)
SARTAIN STREET (FUTURE PHASES)MAX AVENUE (FUTURE PHASES)NORTH 25TH AVENUE (FUTURE PHASES)RAWHIDE RIDGE ROAD (PHASE 1)
PROPOSED
60' PUBLIC R.O.W.
PROPOSED 60'
PUBLIC R.O.W.
PROPOSED
60' PUBLIC R.O.W.
PROPOSED 10' PUBLIC
TRAIL EASEMENT
EDGE OF DELINEATED WETLAND (TYP.)
5' WIDE TRAIL (PHASE 1)
CATTAIL STREET (EXISTING)
KIMBERWICKE STREET (EXISTING)
RAWHIDE RIDGE ROAD (EXISTING)MAX AVENUE (EXISTING)NORTH 27TH AVENUE (COB 2025 CAPITOL IMPROVEMENT)NORTH 19TH AVENUE (EXISTING)BAXTER LANE (EXISTING)
SARTAIN STREET (FUTURE PHASES)MAX AVENUE (FUTURE PHASES)NORTH 25TH AVENUE (FUTURE PHASES)RAWHIDE RIDGE ROAD (PHASE 1)THOMAS DRIVE (EXISTING)EXISTING PERMITTED CROSSING
EXISTING PERMITTED CROSSING
LEGEND:
PHASE 1 =
FUTURE PHASES =
PHASE LINE =
K:\Bozeman\Gallatin Center LP\2024381 Gallatin Center\05CAD\Sheets\Preliminary Plat\24381-ROAD-PHASING-EXHB.dwg PHASING PLAN 4/16/2025 3:48:45 PM
DESIGNED BY:DRAWN BY:CHECKED BY:DATE:JRHJRHEWRAPRIL 2025SHEET---NO.DATEREVISIONPREPARED BY BY
PHASING PLAN
GALLATIN CENTER LIMITED PARTNERSHIP
BOZEMAN, MT
GALLATIN CENTER SUBDIVISION ENGI NEERING
PROJECT NO. 2024381
895 TECHNOLOGY BLVD., SUITE 203
BOZEMAN, MT 59718
(406) 586-0262
www.wwcengineering.com
0
SCALE: 1" = 100'
100'50'