HomeMy WebLinkAbout019 IrrigationGallatin Center Subdivision
Preliminary Plat
Application
19 - Irrigation
There is no proposed irrigation with the subdivision; therefore, no irrigation supply is identified
with this application. Once development of the lots is proposed with subsequent applications, an
irrigation source will be identified. Most of the subdivision falls within a solvent site-controlled
groundwater area, where irrigation wells may not be permitted. Due to this constraint, it is
anticipated that domestic city water will be used for irrigation within the subdivision. The DNRC
has been contacted to verify the feasibility of irrigation wells on the subdivision property for
future development. If deemed appropriate, further discussions will be held with the MDEQ to
determine final feasibility. Please see the DNRC Correspondence included in this section which
contains an attachment of the solvent site boundary overlain with the property boundary.
Representatives of Tasman Geosciences and the MDEQ have been contacted to identify any
additional considerations due to the solvent site. This correspondence is also included in this
section.
19 – Irrigation
DNRC Correspondence
1
Joselyn Hartwig
From:Joselyn Hartwig
Sent:Monday, April 14, 2025 3:32 PM
To:kstrasheim@mt.gov
Subject:Gallatin Center Subdivision - Irrigation Supply Source
Attachments:Bozeman Solvent Map.pdf; Lot Layout Exhibit.pdf
Hi Kerri,
WWC Engineering is preparing a preliminary plat submittal for the Gallatin Center Subdivision located just
north of Baxter Lane, west of North 19th Avenue, south of Cattail Street and east of Thomas Drive. The current
geocode for the property is: 06-0904-35-1-05-01-0000.
We are reaching out to determine the feasibility of landscape irrigation wells for future landscaping within the
subdivision. There are no landscaping plans at this time, but we are wanting to confirm if irrigation wells can be
permitted on the property for future developments of the lots. The site falls within the Bozeman Solvent Site
Controlled Groundwater Area shown in the attached map. The property is outlined in blue on the attached map
for reference. The proposed lot layout is also attached. Please let us know if irrigation wells would be a feasible
option for the subdivision, or if another water supply source should be pursued.
Thank you,
JOSELYN HARTWIG | Associate Engineer
895 Technology Blvd, Ste 203 | Bozeman, MT 59718
O: 406.586.0262 | D: 406.898.3448
www.wwcengineering.com
19 – Irrigation
Tasman Geosciences Correspondence
1
Joselyn Hartwig
From:Joselyn Hartwig
Sent:Friday, April 11, 2025 8:08 AM
To:jsullivan@tasman-geo.com
Subject:Gallatin Center Subdivision - Bozeman Solvent Site
Hi Jim,
WWC Engineering is preparing a preliminary plat application for a subsequent minor subdivision located in
Bozeman, MT. Erik Ringsak from our office gave me your contact information to discuss a pre-application
comment we received from the City of Bozeman Engineering Department. The comment is below:
The subdivision is located just west of North 19th Avenue and just north of Baxter Lane. The geocode for the
property is: 06-0904-35-1-05-01-0000. The location of the property is shown below.
2
Please let me know if there are any construction requirements or other information regarding the solvent site
we should be aware of.
Thank you,
JOSELYN HARTWIG | Associate Engineer
895 Technology Blvd, Ste 203 | Bozeman, MT 59718
O: 406.586.0262 | D: 406.898.3448
www.wwcengineering.com
19 – Irrigation
DEQ Correspondence
1
Joselyn Hartwig
From:Joselyn Hartwig
Sent:Friday, April 11, 2025 7:52 AM
To:Fry, Kate
Subject:RE: Gallatin Center Subdivision - Bozeman Solvent Site
Kate,
Thanks for the information. I will pass this onto the contractor in case a Construction Dewatering Permit is
required.
Thank you,
JOSELYN HARTWIG | Associate Engineer
895 Technology Blvd, Ste 203 | Bozeman, MT 59718
O: 406.586.0262 | D: 406.898.3448
www.wwcengineering.com
From: Fry, Kate <kfry@mt.gov>
Sent: Tuesday, March 11, 2025 8:29 AM
To: Joselyn Hartwig <jhartwig@wwcengineering.com>
Subject: RE: Gallatin Center Subdivision - Bozeman Solvent Site
WARNING: This email originated from an external sender. Please use caution when clicking links or opening
attachments.
Hi Joselyn,
Thank you for reaching out about the Bozeman Solvent Site. The project area shown in your email is
within the Bozeman Solvent Site. In August 2011, the Montana Department of Environmental Quality
issued the Record of Decision (ROD) for the Bozeman Solvent Site. Tetrachloroethene (PCE) is the
main contaminant of concern for the Bozeman Solvent Site. The ROD identified that the Bozeman
Solvent Site site-specific clean up level (SSCL) for PCE in groundwater is 5 µg/L.
There are no Bozeman Solvent Site groundwater monitoring wells on the west side of North 19th Ave
North. Historically, a private well north of the project property (R-07) and a private well south of the
project property (R-49) were sampled as part of the Bozeman Solvent Site. R-07 was sampled 6
times between 2000 and 2003. PCE was detected at 1 µg/L in June 2001 and 0.8 µg/L in December
2001. These concentrations are less than the SSCL. PCE was not detected (<0.5 µg/L) during the
other sampling events. R-49 was sampled annually from 2000 and 2014, and PCE was not detected
(<0.5 µg/L) during any of the sampling events. Groundwater flow across the Bozeman Solvent Site is
from the south to the north. Based on historical groundwater data, PCE is not expected to be
detected in groundwater at your project area.
The ROD does not identify construction requirements related to the Bozeman Solvent Site in the area
of your project. However, if construction activities require a dewatering permit, the Construction
Dewatering General Permit (CDGP) application requires the applicant to contact me regarding current
2
groundwater plume conditions. This email may satisfy that requirement. Please note, the CDGP may
have different requirements for PCE concentrations than the Bozeman Solvent Site SSCL prior to
discharge under a CDGP. For additional information on the CDGP application process please
contact Christine Weaver in DEQ Water Quality (406-444-3927 or CWeaver@mt.gov).
This email only addresses concerns related to the Bozeman Solvent Site.
Please let me know if you have questions.
Regards,
Kate
Kate Fry | Senior Project Officer
Superfund, AML, and Construction Bureau
Waste Management and Remediation Division
Montana Department of Environmental Quality
Office: 406-444-6426
From: Joselyn Hartwig <jhartwig@wwcengineering.com>
Sent: Tuesday, March 11, 2025 8:07 AM
To: Fry, Kate <kfry@mt.gov>
Subject: [EXTERNAL] Gallatin Center Subdivision - Bozeman Solvent Site
Hi Kate,
This is Joselyn with WWC Engineering. Erik Ringsak from our office gave me your contact information to
discuss a pre-application comment we received from the City of Bozeman Engineering Department. The
comment is below:
WWC Engineering is preparing a preliminary plat application for a 5-lot subsequent minor subdivision located
in Bozeman, MT. The subject property is located just west of North 19th Avenue and just north of Baxter Lane.
The geocode for the property is: 06-0904-35-1-05-01-0000
3
Please let me know of any construction requirements or other information regarding the solvent site we should
be aware of.
Thank you,
JOSELYN HARTWIG | Associate Engineer
895 Technology Blvd, Ste 203 | Bozeman, MT 59718
O: 406.586.0262 | D: 406.898.3448
www.wwcengineering.com [wwcengineering.com]