Loading...
HomeMy WebLinkAbout002 Response to Pre-Application CommentsGallatin Center Subdivision Preliminary Plat Application 2 – Response to Pre-App Comments Included in this section are the design team’s responses to the Subdivision Pre-Application comments dated March 3rd, 2025. 895 Technology Boulevard, Suite 203, Bozeman, MT 59718 | 406.586.0262 May 30th, 2025 City of Bozeman Planning Department 20 E Olive St. Bozeman, MT 59715 RE: Gallatin Center Subsequent Minor Subdivision Preliminary Plat – Response to Pre- Application Comments. Thank you for your comments dated March 3rd, 2025 for the Gallatin Center Subdivision Pre- Application submittal. Please find WWC Engineering/Madison responses in blue below. 1. As proposed in Phase 1, Rawhide Ridge Rd will at minimum be required to have a compliant temporary fire apparatus turnaround. Road length to dead end is over 150 feet. Response: Comment Ref #6 states that North 27th Avenue must be constructed prior to final plat approval. Rawhide Ridge Road will extend to North 27th Avenue making it a through street rather than a dead end. If North 27th Avenue is not completed prior to the Rawhide Ridge Road extension, the roadway will be barricaded at the start of the extension near Max Avenue until North 27th is completed. Correspondence with the Fire Marshal has taken place deeming this a viable option. Please see section 13-Phased Improvements, for this correspondence and further details. 2. Existing stormwater detention facilities are not part of the current development boundary, and no open space or easement was discussed in the narrative or sketch map. Please identify the stormwater management techniques further. Response: The stormwater techniques are identified in this submittal. Please refer to section 29 – Stormwater Management. 3. Show the proposed stormwater utilities and retention/detention locations. Sec. 38.220.030 3.a Utilities. The existing and proposed utilities located on and adjacent to the proposed subdivision including: Location, size and depth of sanitary and storm sewers, water mains and gas lines. Show easement, open space or common area where stormwater will be managed. 38.270.090. Development or maintenance of common areas. Response: The proposed stormwater utilities and retention/infiltration basin locations are identified in section 29 – Stormwater Management included in this submittal. P a g e | 2 4. Engineering does not support any of the requested waivers from the information required by BMC 38.220.060. Response: Acknowledged. All required materials are included in this submittal. Correspondence has occurred with the City of Bozeman to further clarify the submittal expectations for certain items. Section 15 – Waivers, summarizes the information provided in this correspondence. 5. The subject property is located within the 19th Avenue and Baxter Lane Intersection payback district boundary. The subject property did not participate in the original cost of construction of improvements and will be assessed a payback charge prior to subdivision approval. Response: Acknowledged. The property owner has been made aware of this. 6. BMC 38.400.010- Prior to final plat approval, North 27th Avenue must be constructed from Baxter Lane to Cattail Street along the project's west boundary. The construction is currently scheduled in the City's capital improvement plan for 2025. Response: The planned roadway improvements are designed in accordance with North 27th Avenue plans. 7. The City is currently working to acquire the necessary easement to extend the shared use path along 19th Avenue from Rawhide Ridge Road to Baxter Lane. Response: Acknowledged. The draft easement has been provided to the property owner and is currently being reviewed and coordinated with the City of Bozeman for finalization. 8. BMC 38.410.070- The applicant is advised that the water and sewer mains that would serve this development may need to be upsized to accept the flows from this development. The City's facility plans did not anticipate the flows that are associated with B2-M zoning; therefore, they may be undersized for the proposed development. The applicant is also advised to consider any developments that may be within the proposed subdivision when calculating the water and sewer demand estimates. High density residential developments generally have higher demands than the zoning demands given in the design standards. Response: Water and sewer demand estimates for the subdivision are included in section 28 – Water and Sewer. These estimates account for anticipated development plans within the subdivision. The City of Bozeman has stated that they will evaluate the existing system to identify any required improvements to the existing infrastructure. 9. The initial stormwater management plan given by the applicant seems inadequate for the improvements that are proposed. The applicant must present a plan with the preliminary plat application that meets all of the City's stormwater design standards. Response: Submitted with the pre-application was a conceptual plan intended to characterize the general stormwater plan for the subdivision. The revised stormwater P a g e | 3 management plan is detailed in this submittal. Please see section 29 – Stormwater Management. 10. BMC 38.410.040- The blocks that the applicant is proposing appear to exceed the block dimension standards in this section. The applicant must revise the design to meet the block dimension standards. Response: A deviation request is included in this submittal regarding block length requirements. Please see section 39 – Deviation Request included in this submittal. 11. The applicant has proposed two new watercourse crossings and abandoning an existing crossing in this location. The applicant must reduce the number of crossings and use the existing crossing for Sartain Street. North 25th Avenue must stay on the west side of the creek from Sartain Street to Baxter Lane. Response: The proposed roadway layout has been revised to utilize the existing crossings. Additionally, the proposed new watercourse crossing is within future phases. 12. The applicant is advised that the proposed project falls within the Bozeman Solvent Site boundary. The applicant must contact the City’s solvent site consultant, Jim Sullivan, the Principal Engineer at Tasman Geosciences, Inc. and the DEQ project manager, Kate Frye for additional information on construction requirements within the solvent site. Response: Correspondence has taken place with these individuals regarding the solvent site additional construction requirements. Based on this correspondence, the Record of Decision (ROD) for the Bozeman Solvent Site did not identify any construction requirements related to the Bozeman Solvent Site in the area of the project, unless a dewatering permit is required. If a dewatering permit is required, additional information will need to be acquired for the groundwater plume conditions. The correspondence is included in section 22 – Groundwater included in this submittal. 13. BMC 38.410.130. – Water Adequacy: The development will need to satisfy the water adequacy code requirement prior to future subdivision approval. Compliance for multi-family, commercial, and industrial lots will be deferred until future site development and require a note to this effect listed on the plat. For all other lots or improvements (parklands, common open space, street medians, arterial and collector boulevards) which require irrigation the applicant must identify how the irrigation will be supplied. If irrigation will be supplied from the City’s domestic system compliance with the code will be required at final plat. If sufficient water rights can’t be provided to offsets the development's annual demand then a cash-in-lieu of water rights (CILWR) payment will be required. The City assesses the CILWR fee at a rate of $6,000 per acre-foot. Please contact Griffin Nielsen with the Engineering/Utilities Department directly at gnielsen@bozeman.net or (406) 582-2279 which any questions regarding the water adequacy code. The City encourages the use of groundwater wells to supply irrigation demands, which in turn will reduce the CILWR fee. A pre-determination from the DNRC demonstrating that a well P a g e | 4 groundwater well may be permitted under Montana’s exempt appropriation will need to be obtained. The applicant is encouraged to reach out to the DNRC early in the process to determine if this option is feasible. Response: No parkland, open space, street medians, or landscaped boulevards are proposed with the subdivision. Landscaping and irrigation requirements will be addressed with the development of the lots, in subsequent site plan applications. Correspondence with Brian Krueger confirmed that no landscaping and irrigation will be required with subdivision improvements. For future development, the DNRC has been contacted regarding the feasibility of irrigation wells within the subdivision. Because the subdivision lies partially within the solvent site, it is likely that municipal water will be utilized for future irrigation needs. 14. The applicant must perform a flood study or flood hazard evaluation in accordance with BMC 38.600.150 and submit the report with the preliminary plat application. Response: A flood risk analysis report is included in this application, outlining the low-risk of flooding within the subdivision. Please refer to section 21 - Floodplains included in this submittal. 15. The applicant must meet the agricultural water user noticing requirements of BMC 38.360.280. Response: Please see section 27 – Agricultural Water Users, which includes the correspondence satisfying the noticing requirements of BMC 38.360.280. 16. The applicant must provide agricultural water user facility easements according to BMC 38.410.060.D. Response: The necessary easements for agricultural water user facilities are currently being pursued. West Catron Creek was previously realigned on the northern portion of the subdivision; however, an updated easement reflecting the new location has not yet been recorded. Please refer to Section 40 – Easements for the draft documents related to the vacation of the existing easement, which no longer aligns with the stream, and the proposed easement that accurately reflects the creek's current location. 17. The proposed development is adjacent to 19th Avenue which is an MDT facility. The applicant has proposed constructing an access on 19th Avenue and must work with MDT through the Systems Impact Analysis Process for the access and other impacts this development will have on 19th Avenue. This analysis should include a signal warrant analysis at the Rawhide Ridge Road and 19th Avenue intersection. Response: The MDT has been contacted, and the Systems Impact Analysis Process has been initiated for the proposed improvements. The MDT has requested additional time to review the Traffic Impact Study prior to moving forward with the SIAP. All MDT P a g e | 5 requirements will be met prior to final plat. 18. BMC 38.270.030- Completion of Improvements. - The applicant must indicate how they propose to meet the requirements of this code section. If the applicant would like concurrent construction, the applicant must request it with the preliminary plat application. The request must be made using the application form available on the Community Development website. The applicant must also indicate whether all required improvements will be completed prior to final plat or if some of the improvements will be guaranteed. Response: Concurrent construction is requested with this application. The form from the Community Development website is included in this submittal in section 13 – Phased Improvements. This section also outlines the details of construction timing and completion of improvements. 19. BMC 38.400.050- The applicant is advised that all streets providing access to the subdivision must meet the City's right-of-way width and design standards. Any streets providing access to the subdivision that do not comply with these standards must be upgraded to meet the standards. Cattail Street does not currently meet the City's design standards. Response: The City of Bozeman has been asked to clarify the extent of improvements that will be required for Cattail Street. Recent developments adjacent to Cattail Street did not require any street improvements to Cattail Street. We recommend that these Cattail Street improvements be included with City of Bozeman improvements to North 27th Avenue construction. 20. BMC 38.410.060- The applicant must provide any necessary right-of-way easements for the North 27th Avenue construction project. Response: The necessary public right-of-way for North 27th Avenue will be dedicated with this subdivision, as shown on the plat drawing included with this submittal. Correspondence with James Nickelson (Morrison Maierle) is in progress to finalize the necessary construction and drainage easements for North 27th Avenue. 21. This lot was a remainder lot of Plat J-423, J-423A, and J-423B which collectively created 10 lots and were subdivided between 2006 and 2018. Bozeman Municipal Code enforces State standards for determining the type of subdivision and the required review process, submittal materials, and review timeline. MCA 76-3-609(2) clarifies that to qualify for minor subdivision, a tract of record could not be divided into more than 5 lots before triggering the requirement for Subsequent Minor or Major Subdivision review. Per Plat J-423, Plat J-423A, and Plat J-423B, the tract of record in question has yielded 10 lots. Please prepare materials for a Major (or Subsequent Minor Subdivision, as it follows the same process as a Major) in any future requests. It is important to note that once the statutory limit of 5 lots has been met, even requesting to create one lot by subdivision is considered a Major or Subsequent Minor Subdivision. Response: Acknowledged. This application follows the requirements for a major P a g e | 6 subdivision. 22. Planning does not support any of the requested waivers from the information required by BMC 38.220.060. A narrative response and supporting documentation is required with preliminary plat submittal for all elements of BMC 38.220.060. Response: Acknowledged. All required materials are included in this submittal. Correspondence with the City of Bozeman has taken place to further clarify the submittal expectations for certain items. Section 15 – Waivers, summarizes the information provided in this correspondence. 23. The subject property is proposed to be zoned B-2M and R-5, as such there is potential for residential development. The plans submitted suggest the potential for commercial, industrial, and residential use. Please be aware that residential use will require a neighborhood center compliant with Section 38.410.020. Response: R-5 zoning is not proposed. The Zone Map Amendment application is requesting B-2M zoning for the entire subdivision. Any proposed residential use will be accompanied by a neighborhood center plan compliant with Section 38.410.020 with subsequent site plan applications. 24. Applicant is advised that pursuant to BMC 38.550.070, the City must obtain legal ownership of any irrigation water rights used for City-owned and -maintained irrigation systems. These public systems must be entirely discrete and separate from any irrigation system that is privately owned and maintained. Depending on the water supply source, Applicant may be required to work with various agencies to develop a legal water supply source. Response: Acknowledged. Correspondence with Brian Krueger has confirmed that irrigation and landscaping will not be required with the subdivision. Future irrigation supply will be addressed with subsequent site plan applications. The DNRC has been contacted to verify the feasibility of a groundwater well for future irrigation needs on the property, however domestic water will likely need to be utilized due to solvent site constraints. 25. If an exempt well is identified as the water supply source for the City-owned system, then Applicant is advised that they will be required to complete a MT DNRC Notice of Completion of Groundwater Development Form No. 602 for the well. The City will sign the 602 form only after it has determined that it is correct and complete. After the irrigation system is completed and irrigation water is put to beneficial use, Applicant must file the 602 form with the DNRC, pay any required application fee, and provide proof of filing back to the City. Response: Acknowledged. No landscaping or irrigation is proposed with the subdivision. 26. Applicant is advised that the MT DNRC is no longer issuing pre-determination letters for exempt wells, so the City’s requirement that an exempt well pre-determination letter be provided has been nullified. If an exempt irrigation well is proposed, applicant is advised that they proceed P a g e | 7 at their own risk that a legal water right can be obtained from MT DNRC. Applicant should conduct their own due diligence and familiarize themself with the MT DNRC’s current combined appropriation guidance. Applicant will not know whether MT DNRC will issue a groundwater certificate for the exempt well until a 602 form is filed, which according to current law may only occur after the well is drilled, the irrigation system is constructed, and water is put to beneficial use. If a water right for the exempt well is not issued by MT DNRC, then Applicant is advised that they will be required to modify the irrigation plan and secure an alternative legal water source. Applicant is advised to convert any existing irrigation water rights associated with the property to irrigation of parks, public rights-of-way, and open space if a water right for the exempt well cannot be obtained from the MT DNRC. In this case, Applicant is encouraged to meet with the City Water Conservation and Parks Divisions to discuss low water use landscaping design alternatives. Response: No irrigation is proposed with the subdivision improvements. For future development, the DNRC has been contacted to verify whether exempt wells are a feasible option for irrigation on the property. Because the subdivision falls within the Bozeman Solvent Site boundary, it is likely that municipal water will be utilized for irrigation water supply. 27. Applicant is advised that a change in the water supply source constitutes a material modification pursuant to BMC 38.100.070.B that requires additional review and may result in added conditions of approval after final action to grant preliminary approval of the modification. Response: Acknowledged. 28. On June 15th, 2024, Ordinance 2155 and Resolution 5586 were adopted by the Bozeman City Commission as well as the associated City of Bozeman Landscape and Irrigation Performance and Design Standards Manual. Projects not deemed "adequate” by June 15, 2024 are now subject to these new code requirements. To familiarize yourself with these requirements please visit https://www.bozeman.net/departments/utilities/water-conservation/new- development-standards-3620. Response: Acknowledged. Correspondence with Brian Krueger confirmed that landscaping and irrigation will not be required with the subdivision improvements. Subsequent site plan applications will include landscaping plans, which will encompass the area within street boulevards. 29. It is difficult to tell where the proposed lots exist in relation to the existing riparian/wetland/stream areas. All newly created lots need to have adequate developable lot area that takes into account site constraints. See code sections below. BMC 38.320.020.A.1 states all newly created lots must have a minimum area adequate to provide for required setbacks and parking as set forth. BMC 38.410.030.A states each lot must contain a satisfactory building site adequate for the uses permitted in its zoning district. In any formal submittal, please provide an exhibit which denotes where environmental constraints exist in relation to the proposed lots. Response: The proposed lots are anticipated to provide adequate developable areas once P a g e | 8 the watercourses are mitigated and aligned per any future development plans. Wetland mitigation will not take place with this application. Developers will have the opportunity to mitigate the wetlands and potentially realign the watercourse within the appropriate regulatory constraints once development is planned. 30. Where a development is crossed by or is adjacent to a watercourse, the developer must mitigate the impacts of the development on the watercourse. Refer to BMC 38.410.100 for additional information. The applicant has provided a robust delineation, however, in addition to delineating watercourse setbacks, if any wetland mitigation is proposed, provide a robust summary of proposed measures in conformance with and detailing all required information within Division 38.610. Given the size and scale of the area and the complications which could arise otherwise, planning expects that if wetland mitigation is to occur on the property, it will occur during subdivision review and not on a site by site basis. Response: The initial phase of the subdivision improvements does not involve any wetland mitigation. At this stage, the most appropriate wetland mitigation approach cannot be determined, as it is dependent on future development plans and site-specific needs. We are requesting that wetland mitigation be included with future phases of development, when the mitigation can be designed congruent with future site development plans. Phase 1 of construction will not interfere with any wetlands, as existing permitted crossing is utilized for the extension of Rawhide Ridge Road. End of Response to Pre-Application Comments