Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
056 - A1.52 - THIRD, FOURTH FLOOR & ROOF PLANS -BUILDINGS 5 & 10
DWDW DW DWDW DW UPDN UPDN4" / 1'-0"R2 R2 R1 R3 TYP. TYP.4" / 1'-0"4" / 1'-0"TYP. R4 TYP. ZONE 5-1 ZONE 5-2 ZONE 5-3 ZONE 5-4 ZONE 5-5 DSDSDS DS DS DSDSDS 3940414342 44 45 46 47 V W X Y 1' - 4"1' - 4"6" / 1'-0"6" / 1'-0"6" / 1'-0"6" / 1'-0" 6" / 1'-0" 6" / 1'-0" 6" / 1'-0"6" / 1'-0"6" / 1'-0"6" / 1'-0"4" / 1'-0"4" / 1'-0"4" / 1'-0"4" / 1'-0"4" / 1'-0"4" / 1'-0"R5 TYP. DSDSDS DSDSDS2' - 6"2' - 6"1' - 4"2' - 6"3' - 4"1' - 3"1' - 4"1' - 4"1' - 4"2' - 6"2' - 6"4" / 1'-0"TYP6"4" TYP 1' - 4" R6 R6 A4.5A 1 A4.5A2 UNIT 3BR-4U5305 UNIT 2BR-3 U5303 UNIT 3BR-1U5301 UNIT 4BR-1U5306UNIT 3BR-5U5304 UNIT 4BR-1VAR. 1U5302 5' - 6"13' - 4 1/4"8' - 0"12' - 6 1/4"27' - 6 5/8"12' - 6 5/8"8' - 6 1/8"6' - 1"11' - 11 5/8"11' - 10"5' - 9"7' - 6"13' - 2"6' - 3 1/2" A4.5B2 STAIR C E301 CORRIDORE302 STAIR D E303 STORAGEE304 2 A5.2 27' - 9 1/2"23' - 8 1/4"7' - 1"9' - 7"16' - 0 3/4"11' - 8"7' - 1"23' - 4 1/4"5' - 8 1/4"22' - 5 1/4"1' - 0"18' - 10 1/4"69' - 1 5/8"35' - 7 5/8"26' - 11 1/2"8' - 8 7/8"13' - 1 1/8" 6' - 7 1/8".6' - 6"6' - 0"11' - 7"6' - 0"23' - 7"27' - 10"1' - 0 3/4"52' - 5 3/4"28' - 5"12' - 0"7' - 1"6' - 6 1/4"4' - 5 1/4"8' - 5"13' - 8"7' - 7"5' - 10"11' - 6 1/2"5' - 10"6' - 2"11' - 9"13' - 8"23' - 5"6' - 1". 46' - 8 1/4"14' - 0 5/8"2 5/8"39' - 4 1/8"11' - 1 7/8"38' - 11 1/2"8' - 11"13' - 1 1/8" 47' - 6"10' - 11 1/2"29' - 8"23' - 2 1/2"61' - 1" 39' - 0"58' - 10 7/8" 60' - 2"50' - 6"60' - 10"22' - 8"6' - 2 3/4"21' - 8"5' - 3 3/4"W02 W02 W02 W02 W03 W03 W02 W02 W03 46' - 0" A9.22 SIM A9.22 SIM E304 E303 E301 2 A5.1 1 A6.1 2 A6.1 4 A6.1 3 A6.2 4 A6.2 D1 C1 D1 D1 D1 C1 C1 C1 D1 D1 3940414342 44 45 46 47 V W X Y W0352' - 5 3/4"172' - 5" W02W02W02W02W02 W02 W02 W02W02W02W02W02 88 8 8881' - 0"3' - 0"37 37 A4.5B 1 12 12 ROOF VENTILATION CALCULATION NOTES: 1.2. 3.4. 5. ROOF VENTILATION CALCULATIONS PROVIDED BASED ON PLAN AREA.TRIPLE 4" BASKET WEAVE FULL SOFFIT PROVIDES 14.34 SQ. IN. NET FREE AREA PER SQ. FT.RIDGE VENT PROVIDES 18 SQ. IN. NET FREE ARE PER LIN. FT.DURA-FLOW 'TOP' CAP VENT #6075xx (MATCH ROOF COLOR) ROOF LOUVER PROVIDES 75 SQ. IN. NET FREE AREA PER UNIT.ALTERNATE CAP: LOMANCO MODEL 135 (MATCH ROOF COLOR) ROOF LOVER PROVIDES 144 SQ. IN. NET FREE AREA PER UNIT.BUILDING 10BUILDING 8BUILDING 9BUILDING 7 BUILDING 6BUILDING 5BUILDING 4BUILDING 3 BUILDING 2(CLUBHOUSE - CH) BUILDING 1 -SENIORSEE LOT 2- SAGE PEAK APT DRAWING PACKAGE 1.A. B. 2.3. 4. 5.6.7.8. 9.10.11.12.13.14.15. 16. 17. 18.19. 20. 21. 22.23.24.25.26.27.28.29.30.31. 32.33.34.35.36. 37.38.39.40.41.42. A. B. 43. A. B. PRIVATE CONCRETE PATIO AT UNITS (TYPICAL) - SEE SITE PLANTYPICAL SIZES AT BLDGS 3, 4, 5, 6, 7, 8, 9 ILLUSTRATED IN FLOOR PLANSUNIT SIZE AT BUILDING #10 ON WEST SIDE OF BUILDING NOTED WITH DASH LINES. THE SIZE OF THESE PATIOS ARE 3'-9" DEEP AND 10'-8" WIDE. THERE ARE 3 TOTAL PATIOSCOLUMN - SEE STRUCTURALCONCRETE PAD AT EXITS - SEE CIVIL FOR SIDEWALK LEADING TO PADSFURRED WALL FOR EXTERIOR DECORATIVE DETAIL - SEE ELEVATIONSROOF BELOW, SEE ROOF PLANCOVERED PORCHLINE OF SOFFIT, BEAM AND/ OR ROOF ABOVEBALCONY - LIGHT WEIGHT CONCRETE OVER PRESSURE TREATED FRAMING (BALCONY SIZE CORRESPONDS WITH THE THE PATIO SIZE NOTED ON FIRST FLOOR)UNIT TO BE 3BR-2 TYPE A AT BUILDINGS 3, 7 & 8UNIT TO BE 2BR-2 TYPE A AT BUILDING 3, 7 & 8UNIT TO BE 4BR-2 TYPE A AT BUILDINGS 5 & 10ATTIC ACCESS PANEL AT FOURTH FLOOR - SEE DETAIL 1/A6.4ACCESSIBLE PUSH BUTTON OPERATOR - SEE ELECTRICALACCESS CONTROL MODULE - SEE ELECTRICALUNIT TO BE 2BR-3 A/V AT BUILDING 3, UNIT TO BE 2BR-3 AT BUILDING 7UNIT TO BE 1BR-1 A/V AT BUILDING 4, UNIT TO BE 1BR-1 AT BUILDING 9FDC LOCATION. LOCATION VARIES BETWEEN BUILDINGS 3, 7, AND 8. SEE CIVIL AND PLUMBINGFDC LOCATION, SEE CIVIL AND PLUMBINGUNIT TO BE 1BR-2 TYPE A AT BUILDINGS 4, 6 & 9 AND 1BR-2 TYPE A VAR 1 AT BUILDING 3 AND 1BR-2 TYPE B AT BUILDING 7UNIT TO BE 4BR-1 A/V AT BUILDING 5, UNIT TO BE 4BR-1 AT BUILDING 10BATHTUBS AND CORRIDOR WALLS SHIFTED AT THIS LOCATION FOR DOOR COORDINATION - ALL FLOORSMAILBOXESCOUNTERTOP WITH BACKSPLASH - SEE INTERIORSBRACKETAMAZON LOCKERSWALL BASE - SEE INTERIORSWASHER WITH PEDESTAL - SEE PLUMBINGDRYER WITH PEDESTAL - SEE MECHANICALACCESS PANEL - SEE MECHANICALSTONE HEARTH - SEE INTERIORSELECTRIC FIREPLACE RECESSED IN WALL- BASIS OF DESIGN: AMANTII SYMMETRY SERIES, MODEL # SYM-60STONE SURROUND (3 SIDES) - SEE INTERIORSSHELVINGLOCATION OF FLUSH HANDLEPIPE PROTECTION ON EXPOSED PIPES - SEE PLUMBINGLIGHT FIXTURE - SEE ELECTRICAL - LIGHT FIXTURE OVER VANITIES SHALL BE CENTERED ABOVE COUNTER AND LOCATED 3" - 4" FROM THE TOP OF MIRROR TO BOTTOM OF FIXTURE - COORDINATE WITH ELECTRICALRADON ACCESS PANEL ON FOURTH FLOOR - SEE PLUMBINGTILE WAINSCOT - SEE INTERIORSCHAIR RAIL - SEE INTERIORSGAS METERS - SEE MECHANICALELECTRICAL METERS - SEE ELECTRICALPROVIDE EXTERIOR SIGNAGE ON ELECTRICAL METERING EQUIPMENT PER ONE LINE DIAGRAM THAT STATES THE FOLLOWING: AT BUILDING #5 "GAS METERS ARE NORTH APPROXIMATELY 150'-0" FROM ELECTRIC METERSAT BUILDING #10 GAS METERS ARE SOUTH APPROXIMATELY 150'-0" FROM ELECTRIC METERSPROVIDE EXTERIOR SIGNAGE ABOVE GAS METERS THAT STATES THE FOLLOWING:AT BUILDING #5 ELECTRIC METERS ARE SOUTH APPROXIMATELY 150'-0" FROM GAS METERSAT BUILDING #10 ELECTRIC METERS ARE NORTH APPROXIMATELY 150'-0" FROM GAS METERS FLOOR PLAN KEYNOTES# R1.ASPHALT ROOFINGR2.GUTTERR3.RIDGE VENTR4.DRAFTSTOPPING DOOR - SEE DETAIL 3/A6.4R5. PERMANENT ROOF ANCHOR EQUAL TO "ARS" - INSTALL ALONG ROOF RIDGE MAX 25 FEET ON CENTER AND STARTING 8 FEET FROM ROOF EDGE, INSTALL PER MANUFACTURER REQUIREMENTSR6.ATTIC ACCESS ROOF PLAN KEYNOTES#ROOF PLAN LEGEND SLOPE IN STRUCTURE LINE OF WALL/ COLUMN, BEAM BELOW LINE OF DRAFTSTOPPING TO ALIGN ABOVE THE DEMISING WALL BELOW - SEE STRUCTURAL AND DETAIL 2/A6.3 DOWNSPOUT LOCATION - COORDINATE WITH CIVIL & EXTERIOR ELEVATIONSDS ROOF VENTILATION CALCULATIONS BLDG 5 & 10: ZONES 5-1: 1,644 SFVENTILATION REQUIRED: 1,644 SF / 300 = 5.48 SF OR 789.12 SI REQUIRED VENTILATION AT RIDGE: 394.56 SIPROVIDED VENTILATION AT RIDGE: 22' - 0" RIDGE VENT (18 SI / LF) = 396 SI 396 SI REQUIRED VENTILATION AT EAVE: 394.56 SIPROVIDED VENTILATION AT EAVE:27.7 SF OF SOFFIT VENTING (14.34 SI / SF) = 397.2 SI ZONES 5-2: 1,902 SFVENTILATION REQUIRED: 1,902 SF / 300 = 6.34 SF OR 912.96 SI REQUIRED VENTILATION AT RIDGE: 456.48 SIPROVIDED VENTILATION AT RIDGE:25' - 5" RIDGE VENT (18 SI / LF) = 457.5 SI 457.5 SI REQUIRED VENTILATION AT EAVE: 456.48 SIPROVIDED VENTILATION AT EAVE: 31.9 SF OF SOFFIT VENTING (14.34 SI / SF) = 457.5 SI ZONES 5-3: 2,611 SFVENTILATION REQUIRED: 2,611 SF / 300 = 8.7 SF OR 1,252.8 SI REQUIRED VENTILATION AT RIDGE: 626.4 SIPROVIDED VENTILATION AT RIDGE: 34' - 10" RIDGE VENT (18 SI / LF) = 626.6 SI 626.6 SI REQUIRED VENTILATION AT EAVE: 626.4 SIPROVIDED VENTILATION AT EAVE: 43.7 SF OF SOFFIT VENTING (14.34 SI / SF) = 626.7 SI ZONES 5-4: 1,871 SFVENTILATION REQUIRED: 1,871 SF / 300 = 6.24 SF OR 898.56 SI REQUIRED VENTILATION AT RIDGE: 449.28 SIPROVIDED VENTILATION AT RIDGE:25' - 0" RIDGE VENT (18 SI / LF) = 450 SI 450 SI REQUIRED VENTILATION AT EAVE: 449.28 SIPROVIDED VENTILATION AT EAVE:31.4 SF OF SOFFIT VENTING (14.34 SI / SF) = 450.3 SI ZONES 5-5: 1,511 SFVENTILATION REQUIRED: 1,511 SF / 300 = 5.04 SF OR 725.76 SI REQUIRED VENTILATION AT RIDGE: 362.88 SIPROVIDED VENTILATION AT RIDGE:20' - 2" RIDGE VENT (18 SI / LF) = 363 SI 363 SI REQUIRED VENTILATION AT EAVE: 362.88 SIPROVIDED VENTILATION AT EAVE:25.4 SF OF SOFFIT VENTING (14.34 SI / SF) = 364.2 SI ISSUANCE PROJECT NUMBER NOT FOR NOT FOR CONSTRUCTI O N C O N S T R U C TI O N Copyright © 2024 HDJ Inc. All Rights Reserved Autodesk Docs://DevCo Graf Street - Canter Bozeman MT 2023.0085/2023.0085 - Arch.rvt2023.0085ALDER RIDGE APARTMENTSGRAF ST. APARTMENTS, LLCA1.52 THIRD, FOURTH FLOOR & ROOF PLANS - BUILDINGS 5 & 10GRAF STREET, BOZEMAN. MT 59715NEW CONSTRUCTION FOR 1/8" = 1'-0"A1.52 ROOF PLAN - BUILDINGS 5 & 102 1/8" = 1'-0"A1.52 THIRD & FOURTH FLOOR PLAN - BUILDINGS 5 & 101 SHOWN: BUILDING 5SAME: BUILDING 10 SHOWN: BUILDING 5SAME: BUILDING 10 NOT TO SCALE KEYPLANNORTH VARIES NORTH VARIES NO.DATE DESCRIPTION 1 2025.11.12 FINAL INTERNALREVIEW