Loading...
HomeMy WebLinkAbout012 - Water Design ReportWater Design Report │ DEVCO Alder Ridge & Sage Peak Apartments March 2024 i Alder Ridge & Sage Peak Apartments Water Design Report PREPARED FOR: Graf St. Apartments, LLC. PO Box 4108, Bellevue, WA 98009 (425) 736-0580 MARCH 2024 PREPARED BY: 1201 Third Avenue, Suite 2800, Seattle, WA 98101 (206) 745-9976 3/19/2024 Water Design Report │ DEVCO Alder Ridge & Sage Peak Apartments March 2024 ii TABLE OF CONTENTS 1. INTRODUCTION ............................................................................................................. 1 1.1. PROJECT BACKGROUND ................................................................................................ 1 1.2. PROJECT PURPOSE ......................................................................................................... 1 2. SITE CONDITIONS ......................................................................................................... 2 2.1. GENERAL EXISTING SITE CONDITIONS ........................................................................ 2 2.2. EXISTING WATER INFRASTRUCTURE ........................................................................... 2 2.3. GENERAL PROPOSED SITE DESIGN.............................................................................. 2 3. WATER DEMAND PROJECTIONS ................................................................................ 4 3.1. DOMESTIC WATER DEMANDS ........................................................................................ 4 3.2. FIRE FLOW DEMANDS ..................................................................................................... 4 4. PROPOSED WATER INFRASTRUCTURE IMPROVEMENTS ....................................... 6 4.1. BASIS OF DESIGN ............................................................................................................. 6 4.2. PROPOSED WATER MAIN IMPROVEMENTS ................................................................. 6 4.3. FIRE FLOW ANALYSIS ...................................................................................................... 9 4.3.1 SITE FIRE DEMAND ............................................................................................. 10 4.3.2 BUILDING FIRE DEMAND .................................................................................... 10 5. SUMMARY .................................................................................................................... 11 FIGURES FIGURE 1-1: VICINITY MAP ...................................................................................................... 1 FIGURE 4-1: PROPOSED WATER IMPROVEMENTS .............................................................. 8 FIGURE 4-2: HYDRANT 2870 CURVE, PROVIDED BY CITY OF BOZEMAN ........................... 9 TABLES TABLE 2-1: PROPOSED DEVELOPMENT SUMMARY ............................................................. 3 TABLE 3-1: DOMESTIC WATER DEMAND SUMMARY ............................................................ 4 Water Design Report │ DEVCO Alder Ridge & Sage Peak Apartments March 2024 iii TABLE 3-2: IFC FIRE FLOW CALCULATION SUMMARY ......................................................... 5 TABLE 3-3: PROJECT FIRE FLOW REQUIREMENTS ............................................................. 5 TABLE 4-1: BASIS OF DESIGN - WATER IMPROVEMENTS ................................................... 6 TABLE 4-2: WATER SERVICE LINE DESIGN CALCULATIONS ............................................... 7 TABLE 4-3: HYDRANT HEADLOSS CALCULATION ...............................................................10 TABLE 4-4: BUILDING FIRE SPRINKLER SYSTEM ANALYSIS ..............................................10 APPENDICES APPENDIX A – FEMA FLOOD INSURANCE RATE MAP .......................................................... A APPENDIX B – CITY OF BOZEMAN FIRE FLOW DATA .......................................................... B Water Design Report │ DEVCO Alder Ridge & Sage Peak Apartments March 2024 1 1. INTRODUCTION 1.1. PROJECT BACKGROUND The Alder Ridge & Sage Peak Apartments Project (Project) proposes to develop 9.26 acres of two vacant lots (Parcel Nos. RGG7308 & RGG70606) into a multi-family apartment housing complex. The Project site is currently zoned as residential single-household low density district (R-1), but will be rezoned into residential emphasis mixed-use district. The project site is located east of the intersection of Graf St. and S 19th Ave. in Bozeman, MT within Gallatin County. The project area is bounded by undeveloped parcels in all directions. All 9.26 acres of the site will be disturbed. The Project includes one senior living facility, eight multifamily garden style apartment buildings, and a clubhouse available for use by all residents. In total, 341 units will be provided in the development. A vicinity map of the project site is provided in Figure 1-1. 1.2. PROJECT PURPOSE The project includes onsite water infrastructure improvements for the delivery of domestic water and fire flow demand to the development from the existing City of Bozeman (City) drinking water system. The purpose of this Water Design Report is to provide a description of the proposed water infrastructure improvements and to demonstrate that the improvements meet the water distribution design requirements included in the City Design Standards and Specifications Policy (Design Standards) and City Modifications to Montana Public Works Standard Specifications (MPWSS) Sixth Edition. Figure 1-1: Vicinity Map PROJECT SITE Water Design Report │ DEVCO Alder Ridge & Sage Peak Apartments March 2024 2 2. SITE CONDITIONS 2.1. GENERAL EXISTING SITE CONDITIONS The existing site is undeveloped land comprised primarily of grass and shrubs. There are no significant topography changes on the site. The site slopes from north to south at 1.6 percent. All surrounding lots are currently undeveloped, but are included in the South Range Crossing master planned community development (SRX-North) and will be developed in the near term. A geotechnical investigation was performed on the site in October 2016 by Allied Engineering Services. Nine test pits were excavated for investigation. The test pits all generally showed top soil in the upper 1.0 to 1.5 feet, silt/clay to depths of 3.5 to 4.5 feet and sandy gravel with sand and cobbles from 6.5 feet to the bottom of the test pit at depths of 8 to 9 feet. The Natural Resources Conservation Service (NRCS) Web Soil Survey (WSS) identifies the soil near the project site as predominately 510B – Meadowcreek Loam. The project site is not located within a FEMA Special Flood Hazard Area (SFHA). The site is mapped on FEMA Flood Insurance Rate Map (FIRM) Panels 30031C0808E and 30031C0816E, effective date 4/21/2021 for both panels. The site lies within an unshaded FEMA Zone X, outside the 0.2 percent annual chance floodplain. See the FIRM Panel in Appendix A 2.2. EXISTING WATER INFRASTRUCTURE The project is located in the City’s South Pressure Zone (South Zone). The South Zone is a pressure reduced zone supplied by a water storage reservoir located at the water treatment plant on Sourdough Road. The hydraulic grade line (HGL) of the zone is 5,125 ft. Pressures within the zone range from 6 pounds per square inch (psi) to 160 psi with static pressures in the immediate vicinity of the project approximately 50 psi. There is an existing 24-inch diameter transmission main and 10-inch water main in S 19th Ave and Graf St, respectively. Additional water infrastructure will be constructed as part of SRX-North. Ultimately, the project will be surrounded by 8-inch diameter water mains to the north, east, and west and an existing 10-inch diameter water main in Graf St. All existing and future water mains in the vicinity are ductile iron pipe. 2.3. GENERAL PROPOSED SITE DESIGN The proposed site will consist of one senior multifamily residential building (Building 1), one clubhouse (Building 2) with laundry facilities, fitness equipment and offices, and eight (8) multifamily residential buildings (Buildings 3-10). Characteristics of each building are identified in Table 2-1. Associated passenger vehicular parking and utility infrastructure will be constructed in conjunction with the buildings. Water Design Report │ DEVCO Alder Ridge & Sage Peak Apartments March 2024 3 Table 2-1: Proposed Development Summary Building Name No. Housing Units Footprint (sq. ft) Estimated Population1 Building 1 101 23,100 220 Building 2 - 2,300 - Building 3 30 8,700 66 Building 4 30 7,100 66 Building 5 30 8,400 66 Building 6 30 7,100 66 Building 7 30 8,700 66 Building 8 30 8,700 66 Building 9 30 7,100 66 Building 10 30 8,400 66 Total 341 N/A 748 Note: 1. Based on Occupancy Rate of 2.17 people per unit per 2017 Water Facility Plan update. Water Design Report │ DEVCO Alder Ridge & Sage Peak Apartments March 2024 4 3. WATER DEMAND PROJECTIONS Water demand projections for the proposed development were calculated to size water infrastructure improvements. The projections were made in accordance with the Design Standards Section V Subsection A – Water Distribution Lines Design Criteria. 3.1. DOMESTIC WATER DEMANDS Water demands for domestic water use were calculated based on an average day demand (ADD) of 170 gallons per capita per day (gpcd) and an occupancy rate of 2.17 people per dwelling unit in accordance with the Design Standards and the 2017 Water Facility Plan update, respectively. The water demands for Building 2 were calculated by assuming an equivalent dwelling unit (EDU) demand based on an equivalent square footage and safety factor of 1.5 to account for additional demand from the proposed laundry facilities at the clubhouse. The total square footage of the senior living facility and apartment buildings is approximately 326,000 ft2 with 341 apartments (dwelling units); therefore, each dwelling unit is approximately 960 ft2. Based on this approximation and a safety factor of 1.5, Building 2 is equivalent to 4 EDUs. Maximum day demand (MDD) and peak hour demand (PHD) were calculated using peaking factors of 2.3 and 3.0, respectively, per the Design Standards. The calculated domestic water demands for the development are provided in Table 3-1. Table 3-1: Domestic Water Demand Summary Building Name EDUs ADD MDD PHD gpd gpm gpd gpm gpd gpm Building 1 101 37,400 26 86,020 60 112,200 78 Building 2 4 1,500 2 3,450 3 4,500 4 Building 3 30 11,300 8 25,990 19 33,900 24 Building 4 30 11,300 8 25,990 19 33,900 24 Building 5 30 11,300 8 25,990 19 33,900 24 Building 6 30 11,300 8 25,990 19 33,900 24 Building 7 30 11,300 8 25,990 19 33,900 24 Building 8 30 11,300 8 25,990 19 33,900 24 Building 9 30 11,300 8 25,990 19 33,900 24 Building 10 30 11,300 8 25,990 19 33,900 24 Total 345 129,300 92 297,390 215 387,900 274 3.2. FIRE FLOW DEMANDS The fire flow demand for the proposed development was calculated using the International Fire Code (IFC) Appendix B as recommended in Section 5.2.2 of the 2017 Water Facility Plan Update. National Fire Protection Association (NFPA) 13R automatic sprinkler systems will be installed in all nine apartment buildings; therefore, a 75 percent reduction of fire flow demand was applied in accordance with IFC Table B105.2. Additionally, a safety factor of 1.10 was applied to the IFC calculated fire flow demand, per Section 5.5.4 of the 2017 Water Facility Plan Update. Water Design Report │ DEVCO Alder Ridge & Sage Peak Apartments March 2024 5 IFC Table B105.1(2) was used to calculate the fire flow and fire duration prior to automatic sprinkler credit and safety factors being applied. All buildings, including the clubhouse are construction type V-A. To determine the “fire-flow calculation area” for each building it was assumed that building floors had the same area as the building footprint identified in Table 2-1. The calculated IFC fire flow demand for the proposed development is identified in Table 3-2. Table 3-2: IFC Fire Flow Calculation Summary Building Name Fire-Flow Calculation Area2 (ft2) IFC Fire Flow Requirement (gpm) IFC Fire Flow Duration (hr) Allowed Fire Flow Reduction Calculated Fire Flow Demand3 Building 1 92,400 5,500 4 0.75 1,650 Building 21 2,300 1,500 2 - 1,650 Building 31 34,800 3,250 3 0.75 1,650 Building 41 28,400 3,000 3 0.75 1,650 Building 51 33,600 3,250 3 0.75 1,650 Building 61 28,400 3,000 3 0.75 1,650 Building 71 34,800 3,250 3 0.75 1,650 Building 81 34,800 3,250 3 0.25 1,650 Building 91 28,400 3,000 3 0.75 1,650 Building 101 33,600 3,250 3 0.75 1,650 Notes: 1. A NFPA 13R automatic sprinkler system will be installed in each apartment building. A 75% reduction of the IFC Fire Flow Requirements is allowed per IFC Table B105.2 as long as it is not less than 1,500 gpm. 2. Fire flow calculation area calculated as the total area of all floors of building (i.e. no. of floors * building footprint). 3. Fire Flow Demand is calculated with a 1.1 safety factor in accordance with the 2017 Water Facility Plan Update. Per the 2017 Water Facility Plan Update Table 5.7, the minimum recommended fire flow requirement for residential medium and high density developments is 3,000 gpm. Therefore, the assumed minimum required fire flow for the site is 3,000 gpm, as identified in Table 3-3. Table 3-3: Project Fire Flow Requirements Parameter Value Minimum Fire Flow Required1 3,000 gpm Fire Flow Duration2 4-hours Note: 1. As recommended in the 2017 Water Facility Plan Update Table 5.7. 2. As identified in the IFC Table B105.1(2) for the worst case building onsite. Water Design Report │ DEVCO Alder Ridge & Sage Peak Apartments March 2024 6 4. PROPOSED WATER INFRASTRUCTURE IMPROVEMENTS 4.1. BASIS OF DESIGN The proposed water system was sized in accordance with the Design Standards based on the water and fire flow demand projections identified in Section 3. The Project does not include construction of any onsite water mains, rather all proposed buildings will connect directly to City water mains in the adjacent street right-of-ways. The controlling design parameter for the project is not the bulk project water demand; rather, it is the individual demand of each building and the sizing of building drinking water and fire sprinkler services. See Table 4-1 for a summary of the water infrastructure improvements basis of design. Table 4-1: Basis of Design - Water Improvements Design Parameter1 Value Drinking Water Service Line Diameter1 4-inch/2-inch Water Main Pipe Material1 Ductile Iron/Type K Copper Maximum Allowed Service Line Velocity1 10 fps Fire Sprinkler Service Line Diameter1 6-inch Material1 Ductile Iron Fire Sprinkler System Demand2 - Minimum Fire Sprinkler System Pressure2 - Site Fire Hydrants Diameter1 6-inch/8-inch Material1 Ductile Iron Demand Per Hydrant3 1,500 gpm Fire Hydrant Spacing1 600-feet Minimum Fire Flow System Pressure1 20 psi Note: 1. Per City of Bozeman Design Standards 2. Building internal fire sprinkler suppression system demand and minimum service pressure to be determined by fire sprinkler design engineer. 3. Per National Fire Protection Agency (NFPA) 1 Table 18.5.4.3. 4.2. PROPOSED WATER MAIN IMPROVEMENTS The proposed water system is depicted schematically in Figure 4-1. As identified previously, there are no onsite water mains constructed as part of the project. Each building has a drinking water service connection and a fire service connection to a water main in an adjacent street. The water mains in the adjacent streets north, east, and west of the project are 8-inch diameter ductile iron mains that will be constructed as part Water Design Report │ DEVCO Alder Ridge & Sage Peak Apartments March 2024 7 of SRX-North. The water main located south of the project in Graf St. is an existing 10-inch ductile iron main. Additionally, there will be one onsite hydrant constructed as part of the project. The fire hydrant will be located adjacent to Building 2. It will connect to the adjacent water main located west of the Project using an 8-inch diameter fire lateral. The potable water services for Buildings 1, 3, 4, 5, 6, 7, 8, 9, and 10 are 4-inch diameter ductile iron and the potable water service for Building 2 is 2-inch type-K copper tubing. Water service piping, fittings, and appurtenances will be rated for minimum operating pressure of 250 psi. The design calculations for the potable water services, as described, are provided in Table 4-2. Table 4-2: Water Service Line Design Calculations Building Name Water Service Size Max Hour Demand (gpm) Velocity (fps) Clubhouse 2" Type K Copper Tubing 4 0.41 Building 1 4" Ductile Iron 78 1.72 Buildings 3 - 10 4" Ductile Iron 24 0.53 All building services maintain a pipe velocity less than 10 fps, as required by City Design Standards. The size of water meters for each building will need to provide adequate velocity to achieve sufficient meter reading accuracy. Providing a water meter the same size as the water meter services described in Table 4-2 will likely lead to over sizing and inaccurate water meter readings. 6 C.Y. DUMPST E R ( W A S T E ) 6 C.Y. DUMPSTER (R E C Y C L E ) 6 C.Y. DUMPSTER ( W A S T E )6 C.Y. DUMPSTER (REC Y C L E )MECH/ELEC WATER / TRASHROOMWATER WATE R WATERWATER WATERWATER WATER WATER MAINTENANCETELECOM 6 C.Y. DUMPSTER ( W A S T E ) 6 C.Y. DUMPS T E R ( R E C Y C L E )GRAF ST. APARTMENTSNORTHFIGURE 4-1: PROPOSED WATER IMPROVEMENTSBUILDING 1 - SENIOR APARTMENTSBUILDING 2 -CLUBHOUSEBUILDING 3BUILDING 7BUILDING 8BUILDING 4BUILDING 5BUILDING 6 BUILDING 9 BUILDING 10 6" FIRE SERVICE4" WATER SERVICE6" FIRE SERVICE4" WATER SERVICE6" FIRE SERVICE4" WATER SERVICE6" FIRE SERVICE4" WATER SERVICE6" FIRE SERVICE4" WATER SERVICE6" FIRE SERVICE4" WATER SERVICE2" WATER SERVICE8" FIRE LATERALCONNECTIONONSITE FIRE HYDRANT6" FIRE SERVICE4" WATER SERVICE6" FIRESERVICE4" WATERSERVICEOFFSITE HYDRANTOFFSITE HYDRANTOFFSITE HYDRANTOFFSITE HYDRANTOFFSITE HYDRANTGRAF ST.TO INTERSECTIONOF S. 19TH AVEAND GRAF ST.6" FIRE SERVICE4" WATER SERVICEOFFSITE HYDRANT Water Design Report │ DEVCO Alder Ridge & Sage Peak Apartments March 2024 9 4.3. FIRE FLOW ANALYSIS City engineering staff provided hydrant flow testing results for an existing hydrant connected to the existing 10-inch main in Graff St. located adjacent to the project. The hydrant curve for Hydrant 2870 is provided in Figure 4-2. Figure 4-2: Hydrant 2870 Curve, Provided by City of Bozeman The hydrant curve provided by the City estimates the available flow and pressure provided by the existing distribution system at the location of the hydrant during a fire flow event. The proposed water distribution network that will be constructed as part of SRX-North will add looping which will ultimately provide a more favorable hydraulic response during a fire flow event. Therefore, the hydrant curve provided by the City represents worst case conditions. The hydrant curve provided for a hydrant connected to the water distribution network constructed as part of the SRX-North development will likely provide more favorable hydraulic response than what is shown in Figure 4-2. 0 10 20 30 40 50 60 0 1000 2000 3000 4000 5000 6000 7000 8000 9000System Pressure (psi)Flow (gpm) See Appendix B for full City hydrant flow testing. Water Design Report │ DEVCO Alder Ridge & Sage Peak Apartments March 2024 10 4.3.1 SITE FIRE DEMAND System pressure during a fire flow event was evaluated assuming that the residual pressure in the mains surrounding the project is equal to the residual pressure in Hydrant 2870 with 3,000 gpm demand on the system, 44 psi as read from Figure 4-2. The residual pressure at the hydrants onsite or offsite was estimated assuming a maximum per hydrant demand of 1,500 gpm and calculation of friction loss through the fire lateral. A combination of two hydrants, onsite and/or offsite fire hydrants, will be used to contribute 1,500 gpm each for a combined total of 3,000 gpm. Minor losses resulting from valves, fittings, and appurtenances were considered negligible and not evaluated in this analysis. The calculated headloss in caused by the proposed onsite and offsite hydrants is identified in Table 4-3. Table 4-3: Hydrant Headloss Calculation Hydrant Type Lateral Length (ft) Lateral Nominal Diameter (in) Headloss1 @ 1,500 gpm (psi) Onsite 115 8-inch 1.5 Offsite 50 6-inch 2.5 Note: 1. Headloss calculation assumes a Hazen-Williams Coefficient of 130 and internal diameter of 6.40-inches and 8.51-inches for 6-inch and 8-inch nominal diameter pipes, respectively. Therefore, assuming the minimum system pressure occurs at one of the two hydrants used to achieve the fire flow demand, the minimum system pressure is approximately 41.5 psi, as demonstrated below: 𝐿𝑖𝑙.𝑃𝑟𝑑𝑟𝑟𝑟𝑟𝑑=𝑅𝑦𝑟𝑟𝑑𝑙 𝑅𝑑𝑟𝑖𝑑𝑟𝑎𝑙 @ 3,000 𝑔𝑙𝑙−𝐶𝑙𝑙𝑟𝑟𝑙𝑙𝑙𝑖𝑙𝑔 𝐹𝑖𝑟𝑑 𝐿𝑎𝑟𝑑𝑟𝑎𝑙 𝐻𝑑𝑎𝑑𝑙𝑙𝑟𝑟 @1,500 𝑔𝑙𝑙 𝐿𝑖𝑙.𝑅𝑦𝑟𝑟𝑑𝑙 𝑃𝑟𝑑𝑟𝑟𝑟𝑟𝑑=44𝑙𝑟𝑖−2.5 𝑙𝑟𝑖 ~ 41.5 𝑙𝑟𝑖 4.3.2 BUILDING FIRE DEMAND This report does not include analysis of fire demand from internal fire suppression sprinkler systems. The fire demand and minimum pressure should be identified by the fire sprinkler system design engineer in future design reports. Table 4-4 provides the maximum allowed building fire sprinkler system demands assuming a minimum required pressure at the finished floor elevation of the fire sprinkler riser in the mechanical room of each building. The calculation is based on assumption that the minimum system pressure is 30 psi, allowing 10 psi of additional headloss in the fire service lateral and greater water distribution network. Table 4-4: Building Fire Sprinkler System Analysis Pressure @ Fire Sprinkler Riser(psi) Total Site Fire Demand (gpm) Site Fire Hydrant Demand (gpm) Available Building Fire Sprinkler System Demand (gpm) Headloss in 6" Fire Service Lateral (psi) 40.0 3,550 3,000 550 1 37.5 3,910 3,000 910 2 45.0 4,250 3,000 1,250 4 32.5 4,570 3,000 1,570 6 30.0 4,880 3,000 1,880 8 Note: 1. Based on fire hydrant curve from Hydrant 2870 provided by City of Bozeman. 2. Headloss calculations assume Hazen-Williams Coefficient of 130 and pipe length of 100'. Water Design Report │ DEVCO Alder Ridge & Sage Peak Apartments March 2024 11 5. SUMMARY The proposed development is anticipated to demand a total of 92, 215, and 274 gpm for ADD, MDD, and PHD, respectively. The calculated site fire flow is 3,000 gpm for a fire duration of 3-hours. The building fire sprinkler system demand and minimum required pressure is unknown and shall be determined by by the building fire sprinkler system design engineer. Hydraulic calculations shall be performed with the known fire sprinkler demand to confirm conformance with the City Design Standards. Proposed water infrastructure improvements include construction of building potable water services and fire service laterals for all buildings and one onsite fire hydrant with an 8-inch diameter fire lateral. All water infrastructure is designed in accordance with the City Design Standards. Under known domestic and site fire flow demands, the proposed infrastructure meets the design requirements identified in the Design Standards and MPWSS Sixth Edition. Water Design Report │ DEVCO Graf Street Apartments March 2024 A APPENDIX A – FEMA FLOOD INSURANCE RATE MAP National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250 Feet Ü SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOODHAZARD AREAS Without Base Flood Elevation (BFE)Zone A, V, A99With BFE or DepthZone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areasof 1% annual chance flood with averagedepth less than one foot or with drainageareas of less than one square mileZone X Future Conditions 1% Annual Chance Flood HazardZone X Area with Reduced Flood Risk due to Levee. See Notes.Zone X Area with Flood Risk due to LeveeZone D NO SCREENArea of Minimal Flood Hazard Zone X Area of Undetermined Flood HazardZone D Channel, Culvert, or Storm Sewer Levee, Dike, or Floodwall Cross Sections with 1% Annual Chance 17.5 Water Surface Elevation Coastal Transect Coastal Transect Baseline Profile Baseline Hydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of Study Jurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below.The basemap shown complies with FEMA's basemapaccuracy standards The flood hazard information is derived directly from theauthoritative NFHL web services provided by FEMA. This mapwas exported on 2/29/2024 at 12:44 PM and does notreflect changes or amendments subsequent to this date andtime. The NFHL and effective information may change orbecome superseded by new data over time. This map image is void if the one or more of the following map elements do not appear: basemap imagery, flood zone labels, legend, scale bar, map creation date, community identifiers, FIRM panel number, and FIRM effective date. Map images for unmapped and unmodernized areas cannot be used for regulatory purposes. Legend OTHER AREAS OF FLOOD HAZARD OTHER AREAS GENERAL STRUCTURES OTHER FEATURES MAP PANELS 8 B 20.2 The pin displayed on the map is an approximatepoint selected by the user and does not representan authoritative property location. 1:6,000 111°3'53"W 45°39'12"N 111°3'15"W 45°38'47"N Basemap Imagery Source: USGS National Map 2023 Water Design Report │ DEVCO Graf Street Apartments March 2024 B APPENDIX B – CITY OF BOZEMAN FIRE FLOW DATA CITY OF BOZEMAN Fire Flow Request Form PHONE (406) 582-3200 FAX (406) 582-3201 Date December 13, 2023 Location West Graf Street and South 19th Avenue Pressure Zone South (HGL 5125) GIS Hydrant ID# 2070, 2870 Adjacent Main Size 24-inch DI, 10-inch DI Model Scenario Maximum Day Demand, Steady State, Fire Flow Reference 2017 Water Facility Plan Update1 Hydrant Curves An Excel Spreadsheet with hydrant curves has been provided for the requested location Requested Location via the Bozeman Infrastructure Viewer2 If you have questions or need further information feel free to email. Data Disclaimer: Water distribution information is calculated using hydraulic modeling software and is subject to variation. Actual field conditions may vary. This information is provided to the requestor for evaluation purposes only, without warranty of any kind, including, but not limited to any expressed or implied warranty arising by contract, stature, or law. In no event regardless of cause, shall the City be liable for any direct, indirect, special, punitive or consequential damages of any kind whether such damages arise under contract, tort, strict liability or inequity. HOME OF MONTANA STATE UNIVERSITY GATEWAY TO YELLOWSTONE PARK 1 https://www.bozeman.net/home/showpublisheddocument/4977/636420174896170000 2 https://gisweb.bozeman.net/Html5Viewer/?viewer=infrastructure GIS Hydrant # Available Flow (gpm) Residual Pressure (psi)2870 0 54.4 200 54.04 400 53.65 600 53.25 800 52.8 1,000.00 52.29 1,200.00 51.7 1,400.00 51.05 1,600.00 50.34 1,800.00 49.57 2,000.00 48.74 2,200.00 47.85 2,400.00 46.9 2,600.00 45.89 2,800.00 44.83 3,000.00 43.72 3,200.00 42.55 3,400.00 41.33 3,600.00 40.05 3,800.00 38.72 4,000.00 37.35 4,200.00 35.91 4,400.00 34.42 4,600.00 32.88 4,800.00 31.28 5,000.00 29.63 5,200.00 27.93 5,400.00 26.18 5,600.00 24.37 5,800.00 22.51 6,000.00 20.61 6,200.00 18.65 6,400.00 16.64 6,600.00 14.58 6,800.00 12.46 7,000.00 10.3 7,200.00 8.09 7,400.00 5.82 7,600.00 3.51 7,800.00 1.15 Hydrant Curve 0 10 20 30 40 50 60 0 1000 2000 3000 4000 5000 6000 7000 8000 9000Residual Pressure (psi)Available Flow (gpm) Hydrant Curve 2870 Data Disclaimer: Water distribution information is calculated using hydraulic modeling software and is subject to variation. Actual field conditions may vary. This information is provided to the requestor for evaluation purposes only, without warranty of any kind, including, but not limited to any expressed or implied warranty arising by contract, stature, or law. In no event regardless of cause, shall the City be liable for any direct, indirect, special, punitive or consequential damages of any kind whether such damages arise under contract, tort, strict liability or inequity.