Loading...
HomeMy WebLinkAbout2024 Street Improvements Project_Part16 V2 ProjectDox.Data.Model.Aggregate.FoldersTreeModel DRAWN BY:KMG CHECKED BY. APPROVED BY:_ DATES W Q � Y z U c J m REMOVE/REPLACE E OLIVE STREET CURB, INSTALL S� NEW PED RAMP n m SD z N C Gr N C S+ d a GAS GAS mm12 w F"N� O In Nz- I � '.m� X co PARKING r a s gS HERE TO a o IER-SI C (S c a z I SIDEWALK o N INSTALL 2'x4.5' ? > N DETECTABLE WARNING F PLATES (TYP) TOP/ "o p o TREE Lz7 m GNE / / N r NOTES: 1 . INSTALL SIDEWALK PER C.O.B. STANDARD o DETAIL 02529-1 1 . INSTALL 4-INCHES i THICK THROUGH NON-TRAFFICKED AREAS = AND 6-INCHES THICK IN TRAFFIC AREAS PAVEMENT REMOVAL W AND FOR PEDESTRIAN RAMPS AND 9.2' TYP. 2' 3' LINE LANDINGS W 2. INSTALL DETECTABLE WARNING PLATES SIDEWALK 2% F SIZED TO FIT THE PROPOSED — — — — — — - O w PEDESTRIAN RAMP LAYDWOWN AREA, A'' a w MINIMUM 4-FOOT WIDTH AT EACH RAMP. 0 0 3. ANYWHERE BOULEVARD TREE ROOTS REPLACE PAVEMENT WITH 3" GRADE HAVE LIFTED AND DAMAGED THE B PLANT MIX. TACK ALL EDGES. a EXISTING SIDEWALK WITHIN THE WORK E'1 N x LOCATIONS, CONTRACTOR IS W m RESTORE BASE WITH 1.5" W w RESPONSIBLE FOR RE-GRADING THE a NEW SIDEWALK AND/OR CUTTING AND MINUS, CRUSHED GRAVEL, COMPACTED PER MPWSS E� REMOVING EXISTING TREE ROOTS TO 02234 3.3 FACILITATE ADA COMPLIANT SIDEWALK. NEW CURB & GUTTER. THIS WORK SHALL BE PERFORMED UNDER DIRECTION OF THE CITY'S ONSITE ENGINEER. THIS WORK IS INCIDENTAL CQ CQ TO CONSTRUCTION AND SHALL BE TYPICAL CURD REPLACEMENT DETAIL INCLUDED IN THE CONTACTOR'S UNIT COST PRICES FOR CONCRETE SIDEWALK. N.T.S. SHEET No. 16 S 2_ OF 19