HomeMy WebLinkAbout26089 Initial Staff ReportInitial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 1 of 28
Application No. 26089 Type Site Plan
Project Name Ferguson Farm, Block 2 Office Building Site Plan
Summary The applicant is proposing to create a 14,277 gross square foot (gsf), two-story office
building on an ~1- acre undeveloped lot (“Site”) within the Ferguson Farm Subdivision,
Project No. P15009, and Master Site Plan, No. Z13155, and Parking Master Site Plan, No. 17446. The office building would be provided with at least 45 shared parking spaces within the Site, pursuant to a joint-use parking agreement shared by all businesses within the subdivision. Due to a 2015 Subdivision 30-foot-wide public trail easement on the south side of this Site, relief from a 20-foot setback for the building
was requested and may be granted by approval of this site plan application.
Zoning B-2M, Community
Commercial Mixed Use
Community Plan
Land Use Designation
Community
Commercial Mixed Use
Parcel Size 1.09-acre
Overlay District(s) None
Street Address 785 Boardwalk Avenue, Bozeman, MT
Legal Description Lot 3, Block 2 of the Ferguson Farm Subdivision, Plat J-563, situated in the SW 12/4 of Section 10, Township 2 S, R5 E, P.M.M., City of Boseman, Gallatin County, Montana.
Owner One West Partners, LLC
Applicant Intrinsik Architecture, Hyalite Engineering and Design 5 Landscaping
Representative Tyler Steinway, Intrinsik Architecture
Concept Review File
26089
Noticing Public Comment Period
Required Posting Date 6/8/26 to 6/30/26 6 6/4/26
Initial Determination Review Authority D
a
Determinations
City of Bozeman, Director of
Community Development
The application is complete and is in
substantial compliance with all applicable
regulations and the zoning map.
All impacts resulting from the proposed development have previously been analyzed
and made available for public review during adoption, amendment, or update of the
land use plan, subdivision and zoning regulation, or zoning map.
Full application/file of record: Community Development Department, 20 E. Olive St., Bozeman, MT 59715
Digital application access is located online in the City’s Laserfiche Repository for Application 26089.
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 2 of 28
CONDITIONS OF APPROVAL
1. The applicant is advised that unmet code provisions, or code provisions that are not specifically listed
as conditions of approval, do not, in any way, create a waiver or other relaxation of the lawful
requirements of the Bozeman Municipal Code (BMC) or state law.
2. Prior to building permit approval, the applicant must provide to the Community Development
Department the storm water storage volume data requested with the storm drainage report review and
must remove the proposed trees from storm water pond areas to allow for more stormwater and
overflow storage. This information must be reflected in the Civil drawings and approved by the Director
of Transportation and Engineering prior to building permit approval.
3. Prior to building permit approval, the applicant must provide a revised Landscape Plan to the
Community Development Department and to the Northwest Energy contact noted below. This revised
Landscape Plan must demonstrate that all utilities are clearly marked on the Landscape Plan to ensure
minimum clearance of 10' for any proposed trees. Refer to the New Service Guide and Electric Service
Requirements & Guidelines on Northwestern Energy’s website for meter clearance requirements.
(https://www.northwesternenergy.com/account-services/for-business/construction-services). Refer to
the New Service Guide and Gas Service Requirements & Guidelines on Northwestern Energy’s website
for meter clearance requirements.
(https://www.northwesternenergy.com/account-services/for-business/construction-services).
CODE PROVISIONS
1. BMC 38.410.060 - Easements - The 10' width eastern sidewalk proposed on the site plan extends
onto Lot 2 property. This route is also providing direct ADA compliant access to the Huffine SUP.
Prior to building permit approval, the applicant must provide an executed 10' Public Access Easement
for this sidewalk; for final review, execution by the City, and filing with the County Clerk and Recorder's
Office.
2. BMC 38.410.110. Water Adequacy: The project's estimated annual municipal demand is 0.61 acre-
feet which must be offset prior to site plan approval. At the City's current CILWR fee rate of
$6,000/AF the CILWR fee for the project is $3,676. Payment must be made prior to final site plan
approval.
3. Fire Marshal Code Provision: Separate fire alarm and fire sprinkler system plans shall be designed,
submitted for review and permitted to meet 2021 IBC Chapter 9 and 2019 NFPA 13/13R, NFPA 72
standards. These are to be completed prior to framing/MEP rough-in inspections. Please contact me
with questions. Shane Brandhorst - Fire Marshal 406-582-2353 or sbrandhorst@bozeman.net
Fire Suppression Plan submittal portal: https://bozeman-mt-us.avolvecloud.com/Portal
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 3 of 28
Figure 1: Vicinity Map
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 4 of 28
Figure 2: Ferguson Farm Subdivision with Subject Lot in red
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 5 of 28
Figures 3 & 4: Proposed Office Building
Huffine Lane View
East and North façade View.
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 6 of 28
Figure 5: Site Layout
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 7 of 28
Figure 6: Site Plan
Huffine Lane
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 8 of 28
Figure 7: Landscape & Open Space Plan
Huffine Lane
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 9 of 28
Figure 8: First Floor Plan
Figure 9: Second Floor Plan
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 10 of 28
Subdivision determination and record 38.750.090, BMC
This analysis and its resulting findings are based on the entirety of the application materials, the
Bozeman Municipal Code and associated standards, plans, and all other materials available during
the initial review period. Collectively, this information is the record of the review. In establishing the
record of review, the Director of Community Development and the Development Review Committee
reviewed the application against the standards noted below in each section of this staff report.
The applicable review authority for site plans is the Director of Community Development in her role as
planning administrator.
Each City Division listed here under is a member of the Development Review
Committee (DRC). This Committee reviews development applications for all criteria relevant to their respective division. Each division is assigned a 2 to 4 letter code, shown to the left of the division name. Throughout the staff report, these
codes will indicate which division led the review of the given criterion. Please note
that while one or more divisions may lead review of a given criterion, the entire DRC
plays a role in each determination.
DRC Development Review Committee
PZ Planning and Zoning
ENG Engineering/Transportation/Utilities
PARK Parks and Recreation
CH Community Housing
WTR Water Adequacy
FIRE Fire
BLD Building
WC Water Conservation
FOR Forestry
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 11 of 28
PLAN REVIEW DETERMINATION AND RECORD 38.740.090.B, BMC
This analysis and its resulting findings are based on the entirety of the application materials, the
Bozeman Municipal Code and associated standards, plans, and all other materials available during
the initial review period. Collectively, this information is the record of the review. In establishing the
record of review, the Director of Community Development and the Development Review Committee
reviewed the application against the standards noted below throughout this staff report.
The City of Bozeman adopted the Bozeman Community Plan (the Future Land Use Plan) including the
Future Land Use Map on October 28th, 2025, by Resolution Number 2025-71. The Bozeman Community
Plan was made available for public review and comment prior to adoption and identified and analyzed
impacts of development. Notice was provided that the Bozeman Community Plan is the basis for
implementing land use regulations as required in 76-25-106, Montana Code Annotated (MCA).
Issue plans including but not limited to the Transportation Master Plan, the Parks, Recreation, and Active
Transportation Plan, the Sewer Facility Plan, Water Facility Plan, Stormwater Facility Plan, and Fire
Protection Master Plan were all considered and incorporated by reference in adoption of the Bozeman
Community Plan.
The Unified Development Code, contained in Chapter 38 of the Bozeman Municipal Code (BMC), is the
primary implementing regulation for the Bozeman Community Plan and was adopted on December 16,
2025, through Ordinance 2025-12/2151. The Bozeman Community Plan and supporting issue plans were
utilized in consideration and adoption of the Unified Development Code (UDC). The City Commission
found that the Unified Development Code was in substantial compliance with the Bozeman Community
Plan.
The Unified Development Code provides specific zoning and subdivision regulations as well as the zoning
designation which determined the allowable criteria for review of the site plan for development of the
subject property.
During adoption of the Unified Development Code, issue plans and the Bozeman Community Plan were
utilized to anticipate impacts of potential development. As such, city wide impacts resulting from the
proposed development were previously analyzed and made available for public review and comment
during the adoption of the land use plan including all issue plans, and adoption of zoning regulations,
subdivision regulations, and all subsequent amendments to the identified documents. Zoning
designations throughout the city were implemented to ensure that individual impacts to a given site from
a proposed development will fit into the framework of the previously considered city wide impacts. Site
Plan review ensures that site-specific impacts have been addressed with the materials submitted with
this application and are available for public review. Any development which conforms with the standards
of Montana Code Annotated and Bozeman Municipal Code has addressed all site-specific impacts.
The following report reviews the subject application for compliance with the criteria and regulations
adopted by the State of Montana and the City of Bozeman Municipal Code (BMC)
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 12 of 28
1. Conformance with Article 2, including the cessation of any current violations (38.200.160 BMC))
1. Cessation of any current violations (38.200.160) Meets Code?
Current Violations None PZ Yes
Comments: The ~1-acre Site is undeveloped with no known code violations.
2. Conformance with all other applicable laws, ordinances and regulations
2. Conformance with all other applicable laws, ordinances and regulations Meets Code?
Submittal requirements 38.710.070 PZ/ENG Yes
Phasing of development
38.230.020.B
One Yes
Comments: Meets code.
3. Conformance with Zoning District Standards Article 2
3.a. Lot Standards (38.210-.260)
3.a.1. Lot Size PZ Meets Code?
Minimum Width Required: 15-feet Yes
Provided: 164.81-feet
Comments: This Site is part of a pre-existing Ferguson Farm Subdivision recorded on June 19, 2015,
Project No. P15009, and is also guided by a Ferguson Farm Master Site Plan, No. Z13155, approved in
2013, and a parking master plan, No. 17446, and a Master Site Plan (MSP) Modification, No. 22042, which reduced some parking by providing a sheltered bus stop on Fallon Drive. The zoning standards established by the MSP carry forward to subsequent developments within the MSP and Subdivision area.
New development applications meet current (2026) UDC standards where the existing MSP standards
do not apply. For example, the MSP established design parameters for trash enclosures and, therefore,
those standards will apply to this Block 2 application.
3.a.2. Density PZ Meets Code?
Dwelling Units per Acre: du/a Required None Yes
Provided None
Comments: There is no residential density limit for property within the B-2M zone. This is a wholly
commercial development.
3.a.3. Coverage: PZ Meets Code?
Building coverage Allowed 100% Yes
Provided 15%
Amenity Space Required 2% of lot area = 949.6 SF Yes
Provided 988 SF in first floor outdoor patio
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 13 of 28
Comments: Meets code.
3.a.4. Streetscape [38.220.040 & 38.260.050] PZ/ENG Meets Code?
Sidewalk Width Required: 6’ along Huffine Lane.
Provided: Provision of a sidewalk connection for direct pedestrian access to the right-of-way from the
development and connection to the existing 6’ Shared
Use Path along the Huffine Road Frontage. The Shared Use Path referenced is part of a trail corridor that was pre-existing at the time of this development and
established via existing right-of-way and 30-foot-wide
trail easement.
Figure 10: Huffine Frontage easements
Site sidewalk was included: North, along parking lot: 8’;
East=10’; West=5’ along building wall and, further north
7’ along parking lot.
There are a 30-foot-wide public linear park/trail easement and a number of utility easements between the Site’s (Lot 3) property line and the Huffine Lane right-
of-way, for a total unbuildable width of 42-feet. The
building is setback another 12’7” from the trail easement due to the requirements of the earlier subdivision.
Yes
Boulevard Width 30’ public trail easement and shared use path. Yes
Type Gateway frontage
Tree spacing 25-30’ average on center, depending on species Yes
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 14 of 28
Comments: Meets Code.
3.a.5. Setbacks PZ Meets Code?
Setbacks (feet) Minimum Maximum Provided Yes, due to previous
subdivision
easements and UDC 38.260.060.6. Relief may be
granted by the
Director as part of this approval.
Primary Street 1’ 20’ NA
Side Street 1’ 20’
Street Facing Garage NA NA
Side 0 0
Rear 0 0
Alley NA NA
Comments: The project site is unique in that it encompasses a large area that has already been developed
with a shared parking lot serving the subdivision. The parking lot spans several parcels and is located
within a common access easement and a joint-use parking agreement. The required front yard setback
for the B-2M district is a minimum of 1 foot and a maximum of 20 feet. The project site is unable to meet
this requirement due to existing public trail easements, as well as public utility easements, located along
the Huffine Lane frontage of the property.
As such, the applicant is requesting relief from the maximum 20-feet setback from the property line
bordering Huffine Lane. The site is unable to meet the letter of the code related to building placement and
tree spacing, based on the 2015 prior Ferguson Farm Subdivision approval (#P15009). The applicant is
requesting that the frontage requirement begin at the back/northern edge of the trail easement, with which
the proposed building conforms. The applicant is also proposing a sidewalk connection to the trail and a
series of trees along the frontage to enhance the streetscape. This property is allowed zero-lot-line
conditions along both the side and rear yards per the 2013 MSP. However, the applicant is proposing that
the building be located a minimum of 5 feet from the side property line to allow for a common walkway to
be placed along the shared property boundary. Pursuant to UDC 38.260.060.6--Relief, these requests
may be granted by the Director as part of this site plan approval.
3.a.6. Transitions PZ Meets Code?
Subject Lot Zoning B-2M NA
Abutting Lot Zoning B-2M
Type NA
Comments: NA
3.a.7. Frontage- Build to PZ Meets Code?
Primary Street Required NA Yes, due to previous P15009
Ferguson
Provided
Side Street Required
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 15 of 28
Provided Farm
Subdivision
easements,
and if the Huffine Lane setback relief
is granted by
the Director.
Comments: This project’s primary street frontage is along Huffine Lane. This project is unique in that it is
not able to meet the primary setback maximum due to existing utility and trail easements. The B-2M zone
required build-to length is 70% of the Huffine Lane frontage. The entire “front” of the building is located
within the Huffine Lane build-to zone which is 133’ long. As proposed, 96% of the building would lie within
the build-to zone, which conforms to code. The building frontage is being measured from the back of the
public trail easement as noted in the relief request explained in the setback section of page 14.
The building entry is recessed 3’ and is 11’ wide meeting the entry way standards. The building entry is
located in the center of the building and complies with the entry feature every 60’. The front first- and
second-story façade also complies with the transparency requirements.
The design of the building conforms with the articulation and massing requirements. The applicant is
proposing to enhance the entry feature to break the building down two volumes. This entry features a
recess and change in roof line to help with the articulation. The building is broken down into volumes of
less than 60’ on all sides. The applicant is also using the windows and change of materials to help break
down the scale of the building.
Site elements such as plant material, site furnishings, and signage would be consistent with the elements
provided throughout this commercial subdivision.
The proposed building would be located on the south side of an existing on-site parking lot, separated
from the public multi-use path along Huffine by a landscaped buffer that includes an existing retention
pond. The two-story building would have its primary entrance facing Huffine Lane. The two-story building
would consist of office space spanning both floors. The floor plan allows access to the building from many
directions. Because the building would be visible from all sides, the design incorporates architectural
treatments on each façade/elevation. Rooftop mechanical equipment would be fully screened. Exterior
metering would be screened either through landscaping or integrated architectural features.
Weather protection would be provided at all primary entrances through recessed entries, awnings, or
overhangs. Several awnings on the south façade, facing Huffine, would extend more than 60% of the
street frontage and project at least 5 feet, meeting UDC requirements. The proposed glazing along the
south elevation would meet UDC transparency standards.
Additionally, the design would meet the commercial open-space requirements through multiple seating
areas located around the east side of the site. The building would primarily be clad in brick, accented with
painted metal panels and awnings; again, intended by the applicant to be durable, long-lasting, and
visually pleasing materials.
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 16 of 28
3.a.8. Parking Location PZ Meets Code?
Parking between
building and street
Not allowed Yes
Setbacks (feet) Minimum Maximum Provided
Primary Street NA NA Parking is located
behind the
building.
Side Street
Street Facing Garage
Side
Rear
Alley
Comments: This lot is part of a 2015 Ferguson Farm Subdivision, a 2013 Ferguson Farm Master Site
Plan (MSP) (Z13155), and a 2017 Parking MSP (#178446) that provide shared parking for all lots within
the subdivision. The parking for this building is located north of the building, whereas the main
entrance to the building faces Huffine Lane. The parking is consistent with the subdivision covenants
shared parking standards and the MSP parking standards.
3.b. Building Standards (38.210-.260)
3.b.1. Vertical Massing PZ Meets Code?
Building Height Allowed 60’ Yes
Provided 41’
Wall Plate Height Allowed NA NA
Provided NA
Comments: Meets code.
3.b.2. Horizontal Massing PZ Meets Code?
Dwelling units per
building
Allowed NA NA
Provided NA
Building width- primary street Allowed 250’ Yes
Provided 133’
Building width-
side street
Allowed NA NA
Provided NA
Comments: Meets code.
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 17 of 28
3.b.3. Activation PZ Meets Code?
Residential Active
depth
Required NA NA
Provided NA
Non-residential Active depth Required 20’ for 70% of the Huffine Lane façade. Yes
Provided 100% of the ground floor interior space along the Huffine Lane frontage is office or meeting space.
Comments: The minimum building setback in the B-2M zone is 1-foot and the maximum setback is 20-
feet. The Activation or active depth of the Huffine Lane façade is a minimum of 20-feet of the ground floor
interior building space in this district and 70% of the building frontage must have this active space. The
proposed building would have 100% of the Huffine Lane façade as a line of individual offices of about 10-
feet depth each. The north façade, facing the parking lot, would also have 100% individual offices and the
interior spaces would be reception, meeting rooms, individual offices and bathrooms and mechanical
rooms. The project site is unable to meet this requirement due to Ferguson Farm Subdivision public utility
and public park and trail easements located along the front of the property.
This application is requesting relief from this requirement, as the site is unable to meet the letter of the
code related to building placement and tree spacing based on the 2015 prior Ferguson Farm Subdivision
easement and approvals. The applicant is requesting that the frontage requirement begin at the back of
the trail/park easement, with which the proposed building does conform. The applicant is also proposing
a sidewalk connection to the trail and a series of trees along the frontage to enhance the streetscape. The
applicant believes the intent of the code is still met through the proposed sidewalk and landscaping.
This property allows zero-lot-line conditions along both the side and rear setbacks. The applicant is
proposing the building be located a minimum of 5 feet from the side property line to allow for a common
walkway to be placed along the shared property boundary.
3.b.4. Floor Height PZ Meets Code?
Residential Ground Story Height Required NA NA
Provided NA
Non-residential
Ground Story Height
Required 12’ Yes
Provided 12’
Ground Floor Elevation Required Min.-2/max.5’ Yes
Provided At grade
Comments: Meets code.
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 18 of 28
3.b.5. Windows PZ Meets Code?
Windows Primary
Street
Required
Provided Side
Street
Provided Yes
Residential Ground
Floor minimum
NA NA NA NA
Non-residential
Ground Floor
minimum
60% 61% No side
street
Upper Story
minimum
15% 42%
Blank Wall maximum 15’ NA
Comments: Meets code.
3.b.6. Entrances PZ Meets Code?
Maximum Street
Facing entry spacing
Primary
Street
Provided Side
Street
Provided Yes
Residential NA
Non-residential 60’ spacing 60’ NA
Entry Feature Recessed entry
Entry Feature Type:
Porch/Covered Entry/Recessed Entry
Recessed entry 3’ deep
and 11’ wide.
NA
Comments: This project’s primary street frontage and building entrance faces Huffine Lane and meets
the required 70% build-to requirements. The building entry is recessed 3’ deep and is 11’ wide, meeting
the entry way standards. The building entry is located in the center of the building so that it complies with
the entry feature every 60’. The Huffine Lane front façade also complies with the transparency
requirements.
The design of the building conforms with the articulation and massing requirements. The applicant is
proposing to enhance the entry feature to break the building down two volumes with a 3’ recess and
change in roof line to help with the articulation. The building is broken down into volumes of less than 60’
on all sides. The applicant is also using the windows and changing materials to help break down the scale
of the building. Weather protection is provided at all primary entrances through recessed entries, awnings,
or overhangs. Several awnings on the south façade, facing Huffine, extend over more than 60% of the
street frontage and project at least 5 feet, meeting UDC requirements. The proposed glazing along the
south elevation also meets UDC transparency standards.
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 19 of 28
3.c. Neighborhood Conservation Overlay District (NCOD) Meets Code?
Neighborhood/Commercial Certificate of Approval NA
Neighborhood (NCOA) required? No PZ
Commercial (CCOA) required?
Demolition of historic Structure
Demolition of non-historic
structure
Comments: The Site does not lie within the NCOD.
4. Conformance with Land Use Standards of Article 3
4.a. Allowed Uses (38.300)
4.a.1. Allowed Use Meets Code?
Proposed Use(s) Office Yes
Comments: Office is a principal use in the B-2M District.
4.b. General Use Standards
4.b.1. Agricultural Water User Facilities (38.310.010.) Meets Code?
Ag Water User Facilities Present? No PZ NA
Comments: NA
4.b.2. Condominiums (38.310.020.) Meets Code?
Condominiums Proposed? No PZ NA
Comments: This application is not proposing to utilize the Declaration of Unit Ownership Act at this time or in relation to this project. Further Condominium Review would be required for this site if condominiums
were desired in the future.
4.b.3. Specific Use Standards (38.320) Meets Code?
Specific Use Standards Applicable? No PZ NA
Comments: NA
4.b.4. Wireless Facilities (38.330) Meets Code?
Wireless Facilities Proposed? No PZ NA
Comments: There are no wireless facilities proposed with, or applicable to, this application.
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 20 of 28
4.b.5. Affordable Rental Housing (38.340) Meets Code?
Affordable Housing Proposed? No CH NA
Comments: This is a wholly commercial application. There is no affordable housing offered with, or applicable to, this application.
5. Conformance with Community Design Standards of Article 4
5.a. Transportation Facilities and Access (Division 38.400)
Streets and Rights-of-way Meets Code?
Streets (38.400.010) ENG
N/A
Street and road dedication (38.400.020 ) N/A
Intersections (38.400.030) Yes –
complies with subdivision TIS.
Street Names (38.400.040) N/A
Street and road Construction Standards (38.400.050) N/A
Street Improvement Standards (38.400.060) N/A
Comments: No streets or roads outside of those provided with initial subdivision development were proposed with this project. Trip generations submitted for the site were compliant those projected and approved with the subdivision traffic impact study.
Street Lighting (38.400.070) ENG N/A
Comments: NA
Sidewalks (38.400.080 ) ENG Yes
Comments: The Site Plan provides a sidewalk connection for direct pedestrian access to the public
right-of-way from the development and connection to the existing 6’ Shared Use Path along the Huffine
Lane frontage. The Shared Use Path referenced is part of a Ferguson Farm Subdivision trail corridor that was pre-existing at the time of this development and established via existing right-of-way and 30- foot- wide trail easement.
Drive access (38.400.090) ENG N/A
Comments: NA
Street vision triangle (38.400.100) ENG
N/A
Transportation pathways (38.400.110 ) N/A
Public transportation (38.400.120) Yes
Comments: The Streamline bus service “Purple” line services this area of the city.
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 21 of 28
5.b. Community Design and Elements (38.410) Meets Code?
General Standards- Preserves natural terrain, drainage, topsoil, trees, and other vegetation to the maximum extent possible (38.410.010.B)
PZ Yes
Comments: This is a vacant/undeveloped lot within the 2015-approved Ferguson Farm Subdivision (#P15009), a wholly-commercial subdivision. There is no natural vegetation on the Site. There is a portion of a regional stormwater pond serving this and other lots within this subdivision.
Community Focal Point (38.410.020) PZ NA
Comments: This project is less than 10 acres and thus not subject to standards for community focal
points.
Lot and block standards (38.410.030-040) ENG/PZ
Rights-of-way for pedestrians (38.410.040.D.) Yes
Comments: Direct pedestrian connections to the existing shared use path and Huffine Lane right-of-way have been provided with this development.
Provisions for utilities including efficient public services and
utilities 38.410.050-060 ENG Yes
Other utilities (electric, natural gas, communications) Yes
Comments: Meets code.
Municipal infrastructure requirements (38.410.070) ENG Yes
Comments: Meets code.
Grading & drainage (38.410.080) ENG/PZ Yes – Per Condition of
Approval No.2
Location, design and capacity of stormwater facilities
Yes – Per Condition of
Approval No.2
Comments: Prior to building permit approval, the applicant must
provide to the Community Development Department the storm
water storage volume data requested with the storm drainage
report review and must remove the proposed trees from storm
water pond areas to allow for more stormwater and overflow
storage. This information must be reflected in the Civil drawings
and approved by the Director of Transportation and Engineering
prior to building permit approval per Condition of Approval No. 2.
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 22 of 28
Stormwater maintenance plan
Prior to building permit approval, the applicant must provide to the
Community Development Department additional information
regarding the requested storm drainage pond volumes and removal
of the trees in the proposed stormwater management pond in order
to keep the pond volume as designed in the Ferguson Farms Master
Site Plan (#Z13155) and allow for more storage (snow and drainage)
for overflow events. This information must be approved by the
Director of Transportation and Engineering prior to building permit
approval per Condition of Approval No.2.
Yes, per Condition of Approval No.
2.
Landscaping: native species, curvilinear, 75% live vegetation 38.410.080.H Yes
Comments: Meets code.
Fire Protection Requirements (38.410.090) FIRE Yes, per Code
Provision 3.
Comments: Separate fire alarm and fire sprinkler system plans shall be designed, submitted for review
and permitted to meet 2021 IBC Chapter 9 and 2019 NFPA 13/13R, NFPA 72 standards. These are to
be complete prior to framing/MEP rough-in inspections. Please contact me with questions. Shane
Brandhorst - Fire Marshal 406-582-2353 or sbrandhorst@bozeman.net
Fire Suppression Plan submittal portal: https://bozeman-mt-us.avolvecloud.com/Portal
Mail Delivery (38.410.100) PZ Yes
Comments: The applicant will provide adequate off-street mail delivery facilities to serve the tenants
of the building.
Water Adequacy (38.410.110) WTR Yes, per Code
Provision No.
2.
Comments: Code Provision No. 2, per BMC 38.410.110--Water Adequacy, requires payment of the Cash-
in-Lieu of Water Rights (CILWR) fee prior to final site plan approval. The project's estimated annual
municipal demand is 0.61 acre-feet which must be offset prior to site plan approval. At the City's current
CILWR fee rate of $6,000/AF (acre-foot), the CILWR fee for the project is $3,676.
5.c. Park and Recreation Requirements (38.420) Meets Code?
Parkland requirements (38.420.020) PARK
NA
Cash donation in lieu of Parkland (CILP) (38.420.030)
Improvements in-lieu
Comments: This is a wholly commercial development within a commercial subdivision. No parkland
is required.
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 23 of 28
Park/Recreational area design and location (38.420.040-050) PARK
NA
Park Frontage (38.420.060)
Liner Parks (38.420.070)
Park development (38.420.080)
Waiver of Required Dedication
Recreation pathways (38.420.110 )
Comments: Parkland is not required for this wholly commercial building.
6. Conformance with Project Design Standards of Article 5 (38.510)
6.a. Site Planning and Design Elements (Division 38.510) Meets Code?
Relationship to Adjacent Properties (38.510.030) PZ Yes
Non-Motorized Circulation and Design (38.510.040) Yes
Comments: This lot is included within the Ferguson Farm commercial subdivision and Ferguson Farm
MSP whose vehicular and non-motorized circulation is approved as part of the Ferguson Farms
subdivision. The Site would be accessed from the main roadway Boardwalk Avenue. Boardwalk
Avenue extends from Fallon Street to Huffine Lane. Non-motorized traffic is also provided via the
public trail bordering the Site and Huffine Lane.
Vehicular Circulation and Parking (38.510.050) PZ Yes
Internal Roadway Design (38.510.050.D) Yes
Comments: Vehicular access is provided through the subdivision roadway system.
Location and design of service areas and mechanical equipment
(38.510.060) PZ Yes
Comments: The rooftop mechanical equipment would be screened from view from the sidewalk and
street. Exterior metering would be screened with landscaping or integrated architectural elements.
6.b. Building Design (38.520) Meets Code?
Building Character (38.520.030) PZ
Yes
Building Massing and articulation (38.520.040)
Building details and materials (38.520.050-.060)
Comments: Please see the discussion above in Section 3.b.6 on page 18.
Special Residential Frontages (38.520.070) PZ NA
Comments: There are no residential uses proposed.
Structured Parking Facilities (38.520.080) PZ NA
Comments: The parking is provided by a paved, open lot approved as part of a parking master plan, No. 17446.
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 24 of 28
6.c. Parking (38.540) Meets Code?
Stall, aisle and Driveway Design (38.530.020) PZ
Yes
Maintenance of Parking Areas (38.520.030) Yes
Number of vehicle spaces required (38.520.040) Yes
Residential
(38.530.040.B.2.a)
Required NA
Reductions
Non-residential
(38.530.040.B.2.b)
Required See below.
Reductions First 1,500 gsf of office space
Total Required 14,277 gsf minus 1,500
gsf=12,777 gsf.
Requirement is 2 spaces per 1,000 gsf. 12,777
gsf/1,000= 12 spaces
times 2 = 25 spaces required.
Max Allowed 4/1,000 gsf= 57 spaces
Total provided Total 46 spaces
On street None
Off street 46 spaces
Joint Use of Parking facilities (38.530.050) PZ Yes
Off-site parking (38.530.056) NA
Comments: The Ferguson Farm Subdivision covenants require shared parking of all the parking within
the subdivision. This lot is granted 49 parking spaces of the parking lot abutting the lot by the
subdivision shared parking agreement. However, this site plan moves the trash enclosure to the center
of the parking lot which reduces the number of parking spaces by three, leaving 46 spaces on-site for
this lot.
The 14,277 gross square foot (gsf) office building is granted a 1,500 gsf reduction. The remaining
12,777 gsf of office space requires 2 parking spaces per 1,000 gsf, or 25 spaces. This requirement is
met within the abutting parking lot to the north. Furthermore, the shared parking agreement of the
subdivision grants this office building the use of 46 spaces.
Number of Bicycle parking spaces required (38.520.070) PZ/ENG Meets Code?
Residential NA
Short-term NA Required Provided
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 25 of 28
Long Term Required Provided
Total Residential Required
Total Residential provided
Non-residential Yes
Short-term 75%
Office use
requires 1 bike
rack per 1,000 gsf of floor area. 14,277 gsf office
use/1,000=14.2
or 14 bike racks of which 11 must be short-term racks.
6 double racks
are provided
next to the building for a total of 12 secure bike
racks.
Long Term 25%
3 covered bike
racks.
4 covered racks
provided adjacent to the dumpster
enclosure.
Total Non-residential provided 16
Comments: The parking master plan (#17446) only addressed vehicle parking. Therefore, the proposed development must meet current bicycle parking standards, which it does meet.
Off-street loading berth requirements (38.530.080) PZ NA
Comments: NA
6.d. Landscaping (38.550) Meets Code?
Mandatory landscaping requirements (38.550.050-060) PZ Yes
Parking lot landscaping Yes PZ/WC
Additional screening Yes
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 26 of 28
Street frontage Yes
Street median island NA
Acceptable landscape materials Yes
Protection of landscape areas Yes Yes, per Condition
of Approval No. 3
related to
Northwest Energy easements.
Irrigation: plan, water source, system type Yes Yes
Residential adjacency NA NA
Comments: The project provides landscape planning which is intended to provide visual interest to the
streetscape and provides a comfortable urban pedestrian experience. The landscape plan proposes to
enhance and tie together all the public spaces. Additionally, there is a landscape approach separating the
public and private spaces that front along a street.
All landscaping would comply with the mandatory landscaping provisions of the Bozeman UDC including
the use of drought tolerant plants, use of appropriately sized landscape plant material, street frontage
landscaping, coordination with utilities, and use of permanent irrigation. All service areas and utility
equipment are screened.
Per Condition of Approval No. 3, prior to building permit approval, the applicant must provide a revised
Landscape Plan to the Community Development Department and to the Northwest Energy contact noted
below. This revised Landscape Plan must demonstrate that all utilities are clearly marked on the
Landscape Plan to ensure minimum clearance of 10' for any proposed trees. Refer to the New Service
Guide and Electric Service Requirements & Guidelines on Northwestern Energy’s website for meter
clearance requirements.
(https://www.northwesternenergy.com/account-services/for-business/construction-services). Refer to
the New Service Guide and Gas Service Requirements & Guidelines on Northwestern Energy’s website for
meter clearance requirements.
(https://www.northwesternenergy.com/account-services/for-business/construction-services).
Fences, walls, and hedges (38.550.070) PZ NA
Comments: No fences, walls or hedges are proposed.
Landscaping of public lands (38.550.080) FOR NA
Comments: NA
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 27 of 28
6.e. Signs (38.550) Meets Code?
Is signage proposed with the application? No PZ NA
Comments: There are no signs associated with this site plan. Any directional or business signage for the building or site would be reviewed under separate building and sign permit applications.
6.f. Lighting (38.560) Meets Code?
Site lighting (supports, cutoff, footcandles, temperature)
38.570.040 PZ Yes
Building-mounted lighting (supports, cutoff, footcandles,
temperature) 38.570.040.B
Comments: Meets code.
7. Conformance with Article 6 – Natural Resource Protection Meets Code?
Floodplain regulations 38.600 ENG NA
Wetland regulations 38.610 NA
Comments: Requirements of BMC 38.600 for floodplain regulations and 38.610 for wetland regulations are not applicable to this request.
Watercourse Setbacks 38.620 ENG/PZ NA
Comments: Requirements of BMC 38.620 are not applicable to this request.
8. Conformance with Article 7- Permits Legislative Actions and Procedures Meets Code?
Public Comment (38.730) PZ TBD
Comments: This is the initial project decision. Public notice will occur during a fifteen-business day period beginning June 8, 2026 to June 30, 2026. This section of the Director determination staff report will be updated after the public notice period concludes.
Special Use Permit (38.740.100) PZ NA
Comments: NA
Subdivisions (38.750) PZ NA
Subdivision exemptions (38.750.140) NA
Required easements NA
Comments: No lot lines are proposed to be relocated, nor are any required. No new easements are required for the proposed development.
Initial Determination Project Report
Ferguson Farm Block 2 Office Building Site Plan
Application No. 26089
June 3, 2026
Page 28 of 28
Deviations Departures and Variances (38.760) PZ Meets Code?
Yes
Comments: There are no deviations, departures, or variances requested with this application. As noted in Sections 3.A.5 and 3.A.7 on page 14, the applicant has requested relief from the B-2M setback
requirement for this lot because the Ferguson Farm Subdivision established public trail and utility
easements on the land between the southern property line and the public trail easement and Huffine Lane
right-of-way. Approval of this site plan application by the Director would include approval of relief of this build-to standard.