HomeMy WebLinkAbout019 - L002 - LANDSCAPE COVERAGE PLANWATWATWATWATWATWATSTSTSTFOFO
FOFOFOFOFOFOFOFOFOFOFOFOFOFOFO FO FOFOFO
FO
FO FO FO
FOFOFOFOFO
FO FO
FO
FO
FO
FO
FO
FO
FO
FO FO
GAS GAS GAS GAS GAS GAS
GAS
GAS
GAS
GAS
GAS
WAT WAT
GASGASUGPUGPUGPFOFOTW:4842FG:4840FG:4839
TW:4842
FG:4840
TW:4841
TAT
SKY SKY
SKY
SKY
TAT
SKY
TAT
SKY
SKY
WATER CONSERVATION REQUIREMENTS
DESIGN PATHWAY: SEE L000
LOCATION CRITERIA PLAN UNIT REQUIRED PROVIDED
HYDROZONE
WATER
USE
LANDSCAPE
VEGETATIVE
COVERAGE
REQUIRED
SITE TREES
PLANTS MUST BE GROUPED
TOGETHER BY SIMILAR WATER
USE HYDROZONES.
TOTAL
LANDSCAPE AREA
8,480 SF
WATER
USE NOT
TO EXCEED
8 GAL/SF
6.7 GAL/SF
SEE WATER BUDGET
CALCULATOR TABLE ON
SHEET L600
60% OF LANDSCAPE MUST
CONTAIN A COMBINATION OF
SHRUBS, PERENNIALS,
EVERGREENS, TURF OR
OTHER APPROVED GROUND
COVERS. MINIMUM OF 10%
COVERAGE MUST BE
COMPOSED OF CONTAINER
GROWN EVERGREENS,
SHRUBS OR PERENNIALS.
TOTAL
LANDSCAPE AREA
8,480 SF
APPLICABLE AREA
6,440 SF
1 TREE PER 1600 SF OF
APPLICABLE LANDSCAPE AREA
4 SITE
TREES
TOTALVEGETATIVE COVER
(SEE LANDSCAPE
COVERAGE SCHEDULE
FOR TOTALS)
12 PROPOSED SITE TREES
NOTE:
1.GREEN HATCH DENOTES TOTAL NON-EXEMPT LANDSCAPE AREA
2.SHRUB AND PERENNIAL COVERAGE IS THE SUM OF ALL INDIVIDUAL PLANTS AT ASSUMED MATURITY.
INDIVIDUAL PLANT AREAS HAVE BEEN MULTIPLIED BY THE QUANTITY REFLECTED ON THE PLAN TO GET THE
TOTAL COVERAGE. SEE PLANT SCHEDULE ON PAGE L001 FOR PLANT QUANTITIES AND ASSUMED SIZES.
60% OF
LANDSCAPE
AREA TO BE
COVERED
W/ LIVE
PLANT
MATERIAL
NOTE:
1.SHRUB AND PERENNIAL COVERAGE IS THE SUM OF ALL
PLANT AREAS AT ASSUMED MATURITY SEE PLANT
SCHEDULE ON PAGE L001 FOR PLANT QUANTITIES AND
ASSUMED SIZES.
LANDSCAPE COVERAGE SCHEDULE
SHRUB/
PERENNIAL
PLANT COVER1,880
SF
22%
TOTAL GROUND LEVEL
LANDSCAPE AREA
TOTAL LIVE PLANT
COVERAGE 7,937 SF
93%
8,480
SF
LIVE PLANT MATERIAL
COVERAGE AREA
% COVER
SF
SEED AREA
COVERAGE6,000
SF
70%
NOTE:
1.EXISTING LANDSCAPE AREAS NOTED SHALL REMAIN
UNDISTURBED AND WILL BE SERVICED BY PREEXISTING
IRRIGATION SYSTEM WHERE APPLICABLE.
2.STORM POND AREA SHALL BE RE-SEEDED AS
NECESSARY TO RESTORE DISTURBANCE. NO NEW
IRRIGATION WILL BE INSTALLED IN THIS AREA.
EXEMPT LANDSCAPE AREA SCHEDULE
EXISTING LANDSCAPE
AREAS TO REMAIN
TOTAL GROUND LEVEL
LANDSCAPE AREA
EXEMPT LANDSCAPE
AREAS
STORM POND AREA
SHEET NUMBER
PROJECT CODE
PROJECT ADDRESS
ARCHITECT RETAINS COPYRIGHT TO THESE DRAWINGS.DRAWINGS ARE ONLY FOR USE FOR PROJECT NAMED ON
DRAWING SHEET AND MAY NOT BE REPRODUCED OR USED
FOR OTHER PURPOSES WITHOUT WRITTEN PERMISSION
FROM ARCHITECT.
FWC
FERGUSON
FARM OFFICE
BUILDING
785 BOARDWALK AVE
BOZEMAN, MT 59718
SITE PLAN
File Path106 EAST BABCOCK STREET
SUITE 1A
BOZEMAN, MT 59715
SHEET NAME
PROJECT NAME
DRAWING REVISIONS
DRAWING ISSUE DATE
DRAWING ISSUED FOR
2026-04-10
PHONE: (406) 582-8988
7/12/2021 10:59:45 AMFOR SITE PLAN
REVIEW ONLY
L002
LANDSCAPE
COVERAGE
PLAN
1680 32
N
1
L002 1/16" = 1'-0"
Landscape Coverage Plan
019