HomeMy WebLinkAbout003 - SP101 - DUMPSTER ENCLOSUREST
STST HYD
S
5' - 6"10' - 0"EQEQEQEQ10' - 4"10' - 4"EQ EQ4"X4"X3/16" TUBE STEEL COLUMN WITH END CAPPED (TYP.)
CONCRETE SLAB, THICKENEDEDGE @ PERIMETER
3' - 5"3' - 10"6' - 2"3' - 10"3' - 5"2' - 4"
CONCRETE FILLED 6" O.D. STEEL PIPE BOLLARD, 36" ABOVE SLAB (TYP.)
180° MIN. GATE SWING (TYP.)
5
SP101
NEW LANDSCAPED AREA, DUMPSTER ENCLOSURE SCREEN
SCREENING, SEE LANDSCAPE
7' - 0"
SP1012
SP1013
SP1016
SP101410' - 4"10' - 4"10' - 0"CLR10' - 0"CLR180° MIN. GATE SWING (TYP.)
4X4X3/16 STEEL TUBE COLUMN END CAP - PAINT FINISH (TYP.)
REAR FRONT
THICKEN SLAB AT GATE POST FOR ANCHORS
5' - 6"5' - 0"5' - 0"4' - 10"EQEQ1' - 6"1' - 2"1' - 0"6"PERSON ENTRANCE
TYP1/2"MAX
5
SP101
*LANDSCAPE SCREENING NOT SHOWN IN ELEVATIONS, SEE L SHEETS6"5' - 0"TYP1/2"MAX
METAL PANEL - PAINT FINISH (TYP)
METAL STRUCTURE - PAINT FINISH (TYP)
REARFRONT
*LANDSCAPE SCREENING NOT SHOWN IN ELEVATIONS, SEE L SHEETS6"5' - 0"TYP1/2"MAX
METAL PANEL - PAINT FINISH (TYP)
METAL STRUCTURE - PAINT FINISH (TYP)
5
SP101
EQ2"EQEQ2"EQ
4' - 10"*LANDSCAPE SCREENING NOT SHOWN IN ELEVATIONS, SEE L SHEETS1' - 2"METAL STRUCTURE - PAINT FINISH (TYP)
REARFRONTPERSON ENTRANCE
*LANDSCAPE SCREENING NOT SHOWN IN ELEVATIONS, SEE L SHEETS
TYP1/2"MAX
5' - 0"METAL PANEL - PAINT FINISH (TYP)
METAL STRUCTURE - PAINT FINISH (TYP)5' - 0"6" 3/8" = 1'-0"SP101
1 ENLARGED DUMPSTER ENCLOSURE PLAN
3/8" = 1'-0"SP101
5 DUMPSTER ENCOLSURE SECTION
SHEET NUMBER
PROJECT CODE
PROJECT ADDRESS
ARCHITECT RETAINS COPYRIGHT TO THESE DRAWINGS. DRAWINGS ARE ONLY FOR USE FOR PROJECT NAMED ON DRAWING SHEET AND MAY NOT BE REPRODUCED OR USED FOR OTHER PURPOSES WITHOUT WRITTEN PERMISSION FROM ARCHITECT.
106 EAST BABCOCK STREET SUITE 1ABOZEMAN, MT 59715
SHEET NAME
PROJECT NAME
DRAWING REVISIONS
DRAWING ISSUE DATE
DRAWING ISSUED FOR
PHONE: (406) 582-8988
Autodesk Docs://FWC - Ferguson Farm Office Building/FWC - FERGUSON FARM OFFICE BUILDING_CENTRAL.rvt4/8/2026 4:56:10 PMSP101
FWC
FERGUSON
FARM OFFICE
BUILDING
DUMPSTER
ENCLOSURE
785 BOARDWALK AVEBOZEMAN, MT 59718
SITE PLAN
2026-04-10
FOR SITE PLAN
REVIEW ONLY
3/8" = 1'-0"SP101
2DUMPSTER ENCOLSURE REAR ELEVATION (WEST)
3/8" = 1'-0"SP101
3DUMPSTER ENCOLSURE NORTH ELEVATION
3/8" = 1'-0"SP101
6DUMPSTER ENCOLSURE FRONT ELEVATION (EAST)
3/8" = 1'-0"SP101
4DUMPSTER ENCOLSURE SOUTH ELEVATION N