Loading...
HomeMy WebLinkAbout003 - SP101 - DUMPSTER ENCLOSUREST STST HYD S 5' - 6"10' - 0"EQEQEQEQ10' - 4"10' - 4"EQ EQ4"X4"X3/16" TUBE STEEL COLUMN WITH END CAPPED (TYP.) CONCRETE SLAB, THICKENEDEDGE @ PERIMETER 3' - 5"3' - 10"6' - 2"3' - 10"3' - 5"2' - 4" CONCRETE FILLED 6" O.D. STEEL PIPE BOLLARD, 36" ABOVE SLAB (TYP.) 180° MIN. GATE SWING (TYP.) 5 SP101 NEW LANDSCAPED AREA, DUMPSTER ENCLOSURE SCREEN SCREENING, SEE LANDSCAPE 7' - 0" SP1012 SP1013 SP1016 SP101410' - 4"10' - 4"10' - 0"CLR10' - 0"CLR180° MIN. GATE SWING (TYP.) 4X4X3/16 STEEL TUBE COLUMN END CAP - PAINT FINISH (TYP.) REAR FRONT THICKEN SLAB AT GATE POST FOR ANCHORS 5' - 6"5' - 0"5' - 0"4' - 10"EQEQ1' - 6"1' - 2"1' - 0"6"PERSON ENTRANCE TYP1/2"MAX 5 SP101 *LANDSCAPE SCREENING NOT SHOWN IN ELEVATIONS, SEE L SHEETS6"5' - 0"TYP1/2"MAX METAL PANEL - PAINT FINISH (TYP) METAL STRUCTURE - PAINT FINISH (TYP) REARFRONT *LANDSCAPE SCREENING NOT SHOWN IN ELEVATIONS, SEE L SHEETS6"5' - 0"TYP1/2"MAX METAL PANEL - PAINT FINISH (TYP) METAL STRUCTURE - PAINT FINISH (TYP) 5 SP101 EQ2"EQEQ2"EQ 4' - 10"*LANDSCAPE SCREENING NOT SHOWN IN ELEVATIONS, SEE L SHEETS1' - 2"METAL STRUCTURE - PAINT FINISH (TYP) REARFRONTPERSON ENTRANCE *LANDSCAPE SCREENING NOT SHOWN IN ELEVATIONS, SEE L SHEETS TYP1/2"MAX 5' - 0"METAL PANEL - PAINT FINISH (TYP) METAL STRUCTURE - PAINT FINISH (TYP)5' - 0"6" 3/8" = 1'-0"SP101 1 ENLARGED DUMPSTER ENCLOSURE PLAN 3/8" = 1'-0"SP101 5 DUMPSTER ENCOLSURE SECTION SHEET NUMBER PROJECT CODE PROJECT ADDRESS ARCHITECT RETAINS COPYRIGHT TO THESE DRAWINGS. DRAWINGS ARE ONLY FOR USE FOR PROJECT NAMED ON DRAWING SHEET AND MAY NOT BE REPRODUCED OR USED FOR OTHER PURPOSES WITHOUT WRITTEN PERMISSION FROM ARCHITECT. 106 EAST BABCOCK STREET SUITE 1ABOZEMAN, MT 59715 SHEET NAME PROJECT NAME DRAWING REVISIONS DRAWING ISSUE DATE DRAWING ISSUED FOR PHONE: (406) 582-8988 Autodesk Docs://FWC - Ferguson Farm Office Building/FWC - FERGUSON FARM OFFICE BUILDING_CENTRAL.rvt4/8/2026 4:56:10 PMSP101 FWC FERGUSON FARM OFFICE BUILDING DUMPSTER ENCLOSURE 785 BOARDWALK AVEBOZEMAN, MT 59718 SITE PLAN 2026-04-10 FOR SITE PLAN REVIEW ONLY 3/8" = 1'-0"SP101 2DUMPSTER ENCOLSURE REAR ELEVATION (WEST) 3/8" = 1'-0"SP101 3DUMPSTER ENCOLSURE NORTH ELEVATION 3/8" = 1'-0"SP101 6DUMPSTER ENCOLSURE FRONT ELEVATION (EAST) 3/8" = 1'-0"SP101 4DUMPSTER ENCOLSURE SOUTH ELEVATION N