Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Blackwood Groves Sub, Ph 3 Infrastructure Improvements (adds pages for Phase 3B)
sheetBLACKWOODGROVESBLCproject code address© 2020 INTRINSIK111 N Tracy AvenueBozeman, Montana 59715Fax: 406.582.8911Ph: 406.582.89882.17.2021A R C H I T E C T U R EI N C O R P O R A T E DNAA0.0100'200'300'0'NOTE:ILLUSTRATIVE PURPOSES ONLY -SUBJECT TO CHANGEPHASE 1PHASE 9PHASE 2PHASE 6PHASE 7PHASE 8PHASE 3PHASE 4PHASE 5 INCLUDED WITH THISAS-BUILT PACKAGE(SEPTEMBER 2025)SPRING RIDGE DRIVE STREET IMPROVEMENTS ARENOT INCLUDED WITH THIS AS-BUILT SUBMITTAL.WATER, SEWER, AND STORM SEWER ARE ISNTALLED.STREET IMPROVEMENTS ARE FINANCIALLYGUARANTEED W/ IMPROVEMENTS AGREEMENT.PHASE 3A INFRASTRUCTUREPREVIOUSLY CLOSED OUT(AS-BUILT DECEMBER 2023) PHASE 3APHASE 3B INCLUDED IN PHASE 3AINFRASTRUCTURE CLOSE-OUT PACKAGE(DECEMBER 2023) SPRING RIDGE DRIVE ROAD IMPROVEMENTS(PAVING, CURB & GUTTER, STRIPING&SIGNAGE, ETC.) NOT INCLUDED IN THIS SCOPEOF WORK. WATER, SEWER, AND STORMINFRASTUCTURE HAS BEEN INSTALLEDHOWEVER RIMS HAVE NOT BEEN SET.VICTORIA STREET INCLUDED INPHASE 3A INFRASTRUCTURECLOSE-OUT PACKAGE(DECEMBER 2023)STUB FL.=5006.57INSTALLED WITHPH 3A AS-BUILTSINSTALLED WITH PH 3A AS-BUILTSSTUB FL. = 5012.05STUB FL. = 5013.00STUB FL.=5005.61RIMS HAVE NOT BEEN SET.RIMS HAVE NOT BEEN SET. S. 11TH AND VICTORIA STREETINCLUDED IN PHASE 3AINFRASTRUCTURE CLOSE-OUTPACKAGE (DECEMBER 2023)INSTALLED WITH PH 3A AS-BUILTSINSTALLED WITH PH 3A AS-BUILTSSTUB FL. = 5010.955009.405009.205010.275019.905009.405009.205010.275019.905008.905008.705008.905008.70 S. 11TH AND VICTORIA STREET INCLUDED INPHASE 3A INFRASTRUCTURE CLOSE-OUTPACKAGE (DECEMBER 2023) 5010.275019.905010.275019.900.42%FL. = 5011.60FL. = 5011.72FL. = 5011.88FL. = 5012.24FL. = 5012.42FL. = 5012.60RIM NOT SET ATTHIS TIME ARBOR WAY INCLUDED IN PAHSE 3A INFRASTRUCTURE CLOSE-OUT PACKAGE (DECEMBER 2023)ARBOR WAY INCLUDED IN PHASE3A INFRASTRUCTURE CLOSE-OUTPACKAGE (DECEMBER 2023) Type text hereINCLUDED IN PHASE 3AINFRASTRUCTURE CLOSE-OUT PACKAGE(DECEMBER 2023) T.O.P.-5004.53T.O.P.-5005.35T.O.P.-5006.80T.O.P.-5008.32T.O.P.-5009.13T.O.P.-5009.57T.O.P.-5010.16T.O.P.-5013.95T.O.P.-5014.03T.O.P.-5010.74T.O.P.-5010.82T.O.P.-5010.855008.715012.725012.72BENCHMARKHYDRANT ARROWBOLT ELEV:5018.59NAVD 88BENCHMARKHYDRANT ARROWBOLT ELEV:5023.49NAVD 88SPRING RIDGE DRIVE INCLUDEDIN PHASE 3A INFRASTRUCTURECLOSE-OUT PACKAGE(DECEMBER 2023) T.O.P-5009.10T.O.P-5009.21T.O.P.-5009.55T.O.P.-5011.03T.O.P-5011.65T.O.P.-5011.89T.O.P-5006.94T.O.P.-5010.63T.O.P.-5011.981T.O.P.-5013.45BENCHMARKHYDRANT ARROWBOLT ELEV:5021.48NAVD 88S. 11TH AVENUE INCLUDED INPHASE 3A INFRASTRUCTURECLOSE-OUT PACKAGE(DECEMBER 2023) VICTORIA STREET INCLUDED IN PHASE 3AINFRASTRUCTURE CLOSE-OUT PACKAGE (DECEMBER 2023) 03/13/23NO VERTICAL BENDS NECCESARY.EXISTING 16" WATER MAIN ELEVATION WAS SLIGHTLYLOWER THAN DESIGNED CROSS AND GATE VALVE ELEVATIONST.O.P.-5010.48T.O.P.-5006.94T.O.P.-5007.22T.O.P.-5010.85T.O.P-5010.63T.O.P-5010.70T.O.P-5010.66T.O.P-5010.6016" GATE VALVESTA 21+38.0(25.13'L)(IN CONCRETECURB BULB CAP)VERTICAL 16"11.25-DEGREEBENDSTA 21+29.97(25.13'L)VERTICAL 16"11.25-DEGREEBENDSTA 21+22.97(25.13'L)VERTICAL 16"11.25-DEGREEBENDSTA 21+03.36(25.19'L)VERTICAL 16" 11.25-DEGREE BENDSTA 20+96.36(25.19'L)16" GATE VALVESTA 20+94.3 (25.2'L)STA 20+94.3(25.2'L)16" WATER GATEVALVEFL ELEV:5008.13STA 20+96.36(25.2'L)VERTICAL 16"11.25-DEGREEBENDFL ELEV:5008.13STA 21+03.36(25.2'L)VERTICAL 16"11.25-DEGREEBENDFL ELEV:5006.76STA 21+22.97(25.1'L)VERTICAL 16"11.25-DEGREEBENDFL ELEV:5006.76STA 21+29.97(25.1'L)VERTICAL 16"11.25-DEGREEBENDFL ELEV:5008.13STA 21+38.0(25.1'L)16" WATER GATEVALVEFL ELEV:5008.13CURB STOPS INSTALLED 1' INSIDE PROPERTY LINETO AVOID FUTURE GRADING CONFLICTS WITHBUILDINGS. 7' STUB OF COPPER INSTALLED AFTERCURB STOP AND CAP SO FUTURE CONTRACTORSDO NOT NEED TO DIG UNDER THE PRIVATEUTILITIES TO CONNECT TO THE WATER SERVICE. T.O.P-5010.78T.O.P.-10.95T.O.P.-5010.95T.O.P.-5012.33BENCHMARKHYDRANT ARROWBOLT ELEV:5020.79NAVD 88ARBOR WAY WATER MAINEXTENSION INSTALLED WITH PHASE3A INFRASTRUCTURE CLOSE-OUT(DECEMBER 2023) INCLUDED IN PHASE 3AINFRASTRUCTURE CLOSE-OUT PACKAGE(DECEMBER 2023) SPRING RIDGE DRIVE FINISH GRADE NOT SET. STORM SEWERMANHOLES AND INLETS HAVE NOT BEEN SET AND ARE NOTINCLUDED WITH THIS AS-BUILT PLAN SET.VICTORIA STREET AND 1ST PORTION OFSPRING RIDGE DRIVE INCLUDED IN PHASE3A INFRASTRUCTURE CLOSE-OUT PACKAGE(DECEMBER 2023) 5017.211.32%5016.915020.131ST PORTION OF S. 11TH AVENUEINCLUDED IN PHASE 3AINFRASTRUCTURE CLOSE-OUTPACKAGE (DECEMBER 2023) 5018.555018.555019.491.09%REVISED LOCATIONFOR INLET 3-15STA 19+25.53 (23.75'L) (ST MHCOMBO INLET 3-15 (48")TBC: 5021.17FL IN (W): 5017.84 (15")FL OUT (S): 5017.84 (15")5017.605016.985020.13TBC: 5021.17FL IN (W): 5017.84 (15")FL OUT (S): 5017.84 (15")0.44%55'5020.105020.10 5007.285007.285008.595008.595007.285007.285008.595008.59VICTORIA AND SPRING RIDGEDRIVE INCLUDED IN PHASE 3AINFRASTRUCTURE CLOSE-OUT 5018.395018.555018.555018.555018.550.46%155'STA 19+27.01TBC: 5021.17FL IN (W): 5017.84 (15")FL OUT (S): 5017.84 (15")TBC: 5021.17FL IN (W): 5017.84 (15")FL OUT (S): 5017.84 (15")REVISED LOCATIONFOR INLET 3-155016.985016.980.49%5020.135014.89 (15")1.00%(15") 5014.781.09%1.09% DENTENION POND 5 ANDDETENTION POND 6 INCLUDED INPHASE 3A INFRASTRUCTURECLOSE-OUT PACKAGE(DECEMBER 2023) 5011.945012.91 INCLUDED IN PHASE 3AINFRASTRUCTURE CLOSE-OUT PACKAGE(DECEMBER 2023) 5018.555018.555018.555018.551.09%VICTORIA STREET AND 1STPORTION OF SPRING RIDGEDRIVE INCLUDED IN PHASE3A INFRASTRUCTURECLOSE-OUT PACKAGE(DECEMBER 2023)SPRING RIDGE DRIVE FINISHGRADE NOT SET. STORMSEWER MANHOLES ANDINLETS HAVE NOT BEEN SETAND ARE NOT INCLUDED WITHTHIS AS-BUILT PLAN SET. SOUTH 11TH NORTH OF VICTORIAST. INCLUDED IN PHASE 3AINFRASTRUCTURE CLOSE-OUTPACKAGE (DECEMBER 2023) VICTORIA STREET INCLUDED INPHASE 3A INFRASTRUCTURECLOSE-OUT PACKAGE(DECEMBER 2023) 5018.555018.555018.555018.55REVISED LOCATIONFOR INLET 3-15ST MH COMBO INLET 3-15 (48")TBC: 5021.17FL IN (W): 5017.84 (15")FL OUT (S): 5017.84 (15")5020.135016.98(15")5018.555018.555021.175017.845017.845020.13155' 0.46%5016.98 0.49%(15") ¬¬¬¬¬¬¬ARBOR WAY INCLUDED IN PHASE3A INFRASTRUCTURE CLOSE-OUT PACKAGE (DECEMBER 2023) 5018.555018.55ST MH COMBO INLET 3-15 (48")TBC: 5021.17FL IN (W): 5017.84 (15")FL OUT (S): 5017.84 (15")5016.98VICTORIA STREET AND THENORTHERN PART OF S. 11THAVE ARE INCLUDED IN PHASE 3AINFRASTRUCTURE CLOSE-OUTPACKAGE (DECEMBER 2023) NORTHERN PORTION OF SPRING RIDGE DRIVE COMPLETE WITHPHASE 3A INFRASTRUCTURE CLOSE-OUT(DECEMBER 2023)SPRING RIDGE DRIVE STREET IMRPROVEMENTS ARE NOTINCLUDED WITH THIS AS-BUILT SUBMITTAL.NORTHERN PORTION OF S. 11TH AVENUE COMPLETE WITHPHASE 3A INFRASTRUCTURE CLOSE-OUT (DECEMBER 2023) NORTHERN PORTION OF SPRING RIDGE DRIVE COMPLETE WITHPHASE 3A INFRASTRUCTURE CLOSE-OUT(DECEMBER 2023)SPRING RIDGE DRIVE STREET IMRPROVEMENTS ARE NOTINCLUDED WITH THIS AS-BUILT SUBMITTAL.NORTHERN PORTION OF S. 11TH AVENUE COMPLETE WITHPHASE 3A INFRASTRUCTURE CLOSE-OUT (DECEMBER 2023) VICTORIA STEET COMPLETE WITH PHASE 3AINFRASTRUCTURE CLOSE-OUT (DECEMBER VICTORIA STEET AND NORTHERN PORTION OFSPRING RIDGE DRIVE COMPLETE WITH PHASE 3AINFRASTRUCTURE CLOSE-OUT(DECEMBER 2023)SPRING RIDGE DRIVE STREET IMRPROVEMENTS ARENOT INCLUDED WITH THIS AS-BUILT SUBMITTAL.VICTORIA STEET AND NORTHERN PORTION OFSPRING RIDGE DRIVE COMPLETE WITH PHASE 3AINFRASTRUCTURE CLOSE-OUT(DECEMBER 2023) VICTORIA STEET AND NORTHERN PORTION OFSPRING RIDGE DRIVE COMPLETE WITH PHASE 3AINFRASTRUCTURE CLOSE-OUT(DECEMBER 2023) $$;;;;;;;;;;;;;;;;;;;;; '(/,1($7257<3,&$/86($1'3/$&(0(17'(7$,/6$5(5(35(6(17$7,9(21/<$&78$/'(6,*186('63(&,),('0$<9$5<6((3/$16&85%)$&(25('*(2)3$,175$,6('253$,17('0(',$1)/(;,%/(685)$&(02817(''(/,1($72565(7525()/(&7,9(6+((7,1*&20326,7(683325752'237,21$/&21&5(7(25$63+$/7 >P@0,172 >P@0$; >P@67')520126(2)5$,6('253$,17('0(',$181/(6663(&,),('27+(5:,6(127(60281725'5,9()/(;,%/('(/,1($7256727+(0$18)$&785(5 663(&,),&$7,2167+((;$&7/2&$7,21$1'3/$&(0(172)7+()/(;,%/('(/,1($7256$5(6+2:1,17+(6,*1,1*3/$1686(+$5':$5(0((7,1*7+(5(48,5(0(1762)6(&7,21>@>@5(7525()/(&7,9(6+((7,1*'(7$,/6$5(5(35(6(17$7,9(21/<$&78$/'(6,*186('63(&,),('0$<9$5<6((3/$16)/(;,%/('5,9$%/('(/,1($7256$1&+25$663(&,),(' >@0,1 >@0,1 127(6,167$//35()250('(;3$16,21-2,17),//(53(56(&7,21$7$//(;3$16,21-2,176)257+()8//7+,&.1(662)7+(&21&5(7(0(',$1&$3,167$//$%21'%5($.(5)257+()8//7+,&.1(662)7+(&21&5(7(0(',$1&$3%(7:((17+(&$3$1'7+(&85%86($253281'>25NJ@522),1*)(/70$7(5,$/2527+(5352'8&7$6$33529('%<7+(352-(&70$1$*(5)257+(%21'%5($.(5'212786((;3$16,21-2,170$7(5,$/$6$%21'%5($.(5$//-2,1760867%(675$,*+7$1'3(53(1',&8/$5727+(&(17(5/,1($1'7+(685)$&(2)7+(0(',$1&$3:+(5(35$&7,&$/$/,*1$//-2,176:,7+/,.(-2,176,1$'-2,1,1*:25.86(-2,17672287/,1($//3$1(/6,17+(0(',$1&$386(648$5(3$1(/6:+(135$&7,&$/211$552:0(',$1&$365(&7$1*8/$56+$3('3$1(/6$5($&&(37$%/(3529,'(&2175$&7,21-2,17612/(667+$1>@:,'($1'12025(7+$1>@:,'($1'12/(667+$1>@,1'(37+&2175$&7,21-2,1760$<%(&87%<$*5229()250,1*722//2&$7((;3$16,21-2,176$7$//-2,176%(7:((17+(0(',$1&$3$1'6758&785(6,13/$&($1'(9(5<)7)7>PP@$7,17(59$/6(48$/727+(1($5(6708/7,3/(2)7+(&2175$&7,21-2,17,17(59$/86($/21*,78',1$/(;3$16,21-2,17,17+(&(17(5/,1(2)$//0(',$1&$36:,'(57+$1)7>@86(/21*,78',1$/&2175$&7,21-2,176,10(',$1&$36:,'(57+$1)7>@:,7+63$&,1*12772(;&((')7>@63$&(75$169(56(&2175$&7,21-2,176(48$/727+(/21*,78',1$/63$&,1*210(',$1&$36:,'(57+$1)7>@)250(',$1&$361$552:(57+$1)7>@63$&(75$169(56(&2175$&7,21-2,176)7>@25/(66&216758&7&21&5(7(0(',$1&85%$1'&$3:,7+&/$66*(1(5$/&21&5(7(25$33529('(48$//21*,78',1$/(;3$16,21-2,177<3,&$/6758&785(,13/$&(0(',$1&21&5(7(&85%/21*,78',1$/&2175$&7,21-2,17675$169(56((;3$16,21-2,1775$169(56(&2175$&7,21-2,176&21&5(7(0(',$1&$3127(6>@(;3$16,21-2,176$5(6+2:1$6'$5.62/,'/,1(6)259,68$/385326(6%21'%5($.(5,66+2:1$6'$5.'$6+('/,1()259,68$/385326(6%21'%5($.(57<3%(7:((1&$3$1'&85%&21&5(7(0(',$1&$3>@0,1&586+('$**5(*$7(&2856(9$5,(6685)$&,1*6(&7,21$$%21'%5($.(55(3/$&(0'767$1'$5'3,1'2:10(',$1&85%:,7+63,//&85%3(5&2%67'':*12'523&85%/2&$7,2163(53/$11.2? (WME REVIEW).09 (WME REVIEW)