Loading...
HomeMy WebLinkAbout012 - S1.2 Framing PlansA11A11A11A11C12C12A11 B21 B21 A11 A11J3 J1J12221J244D4B11 6U46U64- EXAMPLE SHOWN IS A (2) 2x8 HEADER w/ (1) TRIM STUD AND(2) KING STUDS AT EACH END.A12HEADER REQUIRED PER HEADER SCHEDULENUMBER OF TRIM STUDS REQUIREDNUMBER OF KING STUDS REQUIREDTRIM STUDSKING STUDSHEADER SCHEDULETYPESIZEA(2) 2x8B(2) 2x10 OR (3) 2x8C3 1/8" x 12" GLFLOOR JOIST SCHEDULEMEMBERSIZE & SPACINGHANGERJ111 7/8" TJI 210 @ 16 O.C.ITSJ2 P.T. 2x10 @ 16" O.C.HUJ311 7/8" LVL @ 16" O.C.ITSBEAM SCHEDULEBEAMSIZEHANGER1(2) 1 34" X 11 78" LVL_25 1/8" x 12" GL_35 1/8" x 15" GL_4W12x26_FRAMING PLAN NOTES:COMMON FRAMING SYMBOLS:= ARCHITECTURAL WALL= BEAM MARK, SEE SCHEDULE= SHEAR WALL @ THIS LEVEL TO BELOW= SHEAR WALL MARK, SEE SCHEDULE= WOOD DIAPHRAGM SYMBOL/MARK, SEE SCHEDULE= HEADER, SEE SCHEDULE= INTERIOR BEARING WALL= OVERFRAMING, SEE DETAIL 9/S2.1= ROOF FRAMING MEMBER MARK, SEE SCHEDULE= FLOOR FRAMING MEMBER MARK, SEE SCHEDULE= TOP OF STEEL ELEVATION= BEARING LOCATION= HANGING CONNECTION= CANTILEVERING END= COLUMN TO BELOW= COLUMN FROM ABOVE= FLOOR STEP= SNOW DRIFT SURCHARGE TOBE COMBINED w/ BALANCEDSNOW LOAD PER G.S.N. ON S0.1= DIRECTION OF DOWNWARD SLOPE= KEYNOTE, SEE PLAN KEYNOTES6XX:12D1B21R1J121T.O.S.XX'-XX"ROOF JOIST SCHEDULEMEMBERSIZE & SPACINGHANGERRM-24PRE-FAB MONO TRUSSES @ 24" O.C.PER MFRRP-24PRE-FAB PARALLEL CHORD TRUSSES @ 24" O.C._A11A11A11A11 A11A11A11 A11 A21 A21 A21 A21 A11 A11 A11 3RP-24RM-24D1D1446U6U6U61SWITZER ADU 509 E LAMME BOZEMAN, MONTANASHEET NUMBERDATE:REVISION:NOTE: DRAWINGS ON HALF SIZE SHEETS (18"x12") WILL BE HALF SIZE OF SCALE INDICATED.SOJOURN STUDIO, LLC. DARREN CUNNINGHAM, B. ARCH., PRINCIPAL 406-223-5109 DARRENC86@GMAIL.COM04.03.20261UPPER FLOOR FRAMING PLANS1.2ROOF FRAMING PLAN07/11/2025