HomeMy WebLinkAbout011 - S1.1 Foundation PlanPIER SCHEDULEPIERSIZEANCHOREMBEDMENTP112" x 12"8"- CONTINUOUS FOOTINGS ARE: WIDTH x CONTINUOUS x DEPTH- ISOLATED FOOTINGS ARE: WIDTH x LENGTH x DEPTHFOOTING SCHEDULEFOOTINGSIZEREINFORCEMENTF12'-0" x CONT x 1'-10"(3) #4's CONTF22'-0" x 2'-0" x 1'-0"(3) #4's EACH WAYF33'-0" x 3'-0" x 1'-0"(4) #4's EACH WAYF1F1F1F1F1F1F1F3F3F2P199'-0"96'-0"FOUNDATION PLAN NOTES:COMMON FOUNDATION SYMBOLS:= FOOTING MARK, SEE FOOTING SCHEDULE= SHEAR WALL MARK, SEE SCHEDULE= PIER MARK, SEE PIER SCHEDULE= HOLDOWN, SEE DETAIL 1/S2.1= WALL STEP, SEE DETAIL 14/S2.1= CONTROL JOINT, SEE DETAIL 3/S2.1= FLOOR STEP= (2) #4 BARS x 48" @ RE-ENTRANT CORNERS= TOP OF SLAB ELEVATION= COLUMN TO BELOW= TOP OF WALL ELEVATION= TOP OF FOOTING ELEVATION= TOP OF PIER ELEVATION= COLUMN FROM ABOVE= KEYNOTE, SEE PLAN KEYNOTESXX'-00"XX'-XX"XX'-XX"XX'-XX"F1P11W.S.6SWITZER ADU
509 E LAMME
BOZEMAN, MONTANASHEET NUMBERDATE:REVISION:NOTE: DRAWINGS ON HALF SIZE SHEETS (18"x12") WILL BE HALF SIZE OF SCALE INDICATED.SOJOURN STUDIO,
LLC.
DARREN CUNNINGHAM, B. ARCH.,
PRINCIPAL
406-223-5109
DARRENC86@GMAIL.COM04.03.20261FOUNDATION PLANS1.107/11/2025