Loading...
HomeMy WebLinkAbout002-rc-report-509-e-lamme-jun-24-25Generated by REScheck-Web Software Compliance Certificate Project 509 E LAMME Energy Code:2021 IECC Location:Bozeman, Montana Construction Type:Single-family Project Type:New Construction Orientation:Bldg. faces 180 deg. from North Conditioned Floor Area:1,852 ft2 Glazing Area 12% Climate Zone:6 (7836 HDD) Permit Date: Construction Site: 509 E LAMME Bozeman, Montana, Montana 59715 Owner/Agent: Charles Switzer 509 E Lamme 59715 Bozeman, mt 59715 4062235109 darrenc86@gmail.com Designer/Contractor: Darren Cunningham Sojourn Studio LLC 92 Pronghorn Trail Livingston, mt 59047 4062239605 darrenc86@gmail.com pendingPermit Number: false false Has Battery:false false Has Heat Pump:false All Electric Is Renewable Has Charger Project SubType:None Compliance: Passes using UA trade-off 5.1% Better Than Code Maximum UA:293 Your UA:278 The % Better or Worse Than Code Index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. Compliance: Slab-on-grade tradeoffs are no longer considered in the UA or performance compliance path in REScheck. Each slab-on-grade assembly in the specified climate zone must meet the minimum energy code insulation R-value and depth requirements. Envelope Assemblies Assembly Gross Area or Perimeter Cavity R-Value Cont. R-Value Prop. U-Factor Req. U-Factor Prop. UA Req. UA Ceiling: Raised or Energy Truss 1,186 60.0 0.0 0.017 0.024 20 28 South Wall: Wood Frame, 16" o.c. Orientation: Front 728 21.0 0.0 0.057 0.045 30 24 Door 01: Solid Door (under 50% glazing) Orientation: Front 20 0.300 0.320 6 6 Door 10: Glass Door (over 50% glazing) Orientation: Front 20 0.260 0.320 5 6 Window 12: Vinyl Frame Orientation: Front 18 0.230 0.320 4 6 Project Title: 509 E LAMME Data filename:Page 1 of11 06/24/25Report date: Assembly Gross Area or Perimeter Cavity R-Value Cont. R-Value Prop. U-Factor Req. U-Factor Prop. UA Req. UA Window a2: Vinyl Frame Orientation: Front 18 0.230 0.320 4 6 Window a3: Vinyl Frame Orientation: Front 18 0.230 0.320 4 6 Window a4: Vinyl Frame Orientation: Front 18 0.230 0.320 4 6 Window a5: Vinyl Frame Orientation: Front 18 0.230 0.320 4 6 Window a6: Vinyl Frame Orientation: Front 18 0.240 0.320 4 6 Window b1: Vinyl Frame Orientation: Front 9 0.230 0.320 2 3 Window b2: Vinyl Frame Orientation: Front 9 0.230 0.320 2 3 Window b3: Vinyl Frame Orientation: Front 9 0.230 0.320 2 3 Window c1: Vinyl Frame Orientation: Front 12 0.240 0.320 3 4 Window d1: Vinyl Frame Orientation: Front 9 0.240 0.320 2 3 East Wall: Wood Frame, 16" o.c. Orientation: Left side 713 21.0 0.0 0.057 0.045 26 21 Door 07: Solid Door (under 50% glazing) Orientation: Left side 72 0.300 0.320 22 23 Door 08: Solid Door (under 50% glazing) Orientation: Left side 72 0.300 0.320 22 23 Door 03: Glass Door (over 50% glazing) Orientation: Left side 20 0.260 0.320 5 6 Window a7: Vinyl Frame Orientation: Left side 18 0.240 0.320 4 6 Window a8: Vinyl Frame Orientation: Left side 18 0.240 0.320 4 6 Window a9: Vinyl Frame Orientation: Left side 18 0.240 0.320 4 6 Window a10: Vinyl Frame Orientation: Left side 18 0.240 0.320 4 6 Window c2: Vinyl Frame Orientation: Left side 12 0.240 0.320 3 4 West Wall: Wood Frame, 16" o.c. Orientation: Right side 713 21.0 0.0 0.057 0.045 39 30 Door 02: Solid Door (under 50% glazing) Orientation: Right side 20 0.300 0.320 6 6 Window g1: Vinyl Frame Orientation: Right side 8 0.240 0.320 2 2 Window d2: Vinyl Frame Orientation: Right side 9 0.240 0.320 2 3 North Wall: Wood Frame, 16" o.c. Orientation: Back 579 21.0 0.0 0.057 0.045 31 24 Window d3: Vinyl Frame Orientation: Back 9 0.240 0.320 2 3 Window e1: Vinyl Frame Orientation: Back 10 0.240 0.320 2 3 Window e2: Vinyl Frame Orientation: Back 10 0.240 0.320 2 3 Window f1: Vinyl Frame Orientation: Back 7 0.240 0.320 2 2 Project Title: 509 E LAMME Data filename:Page 2 of11 06/24/25Report date: Assembly Gross Area or Perimeter Cavity R-Value Cont. R-Value Prop. U-Factor Req. U-Factor Prop. UA Req. UA Floor: Slab-On-Grade (Heated) Insulation depth: 4.0' Insulation position: Fully Insulated (user specified perimeter R-value + R-5 under slab) 136 40.0 0.518 0.645 0 0 Energy Credits Description Credits Improved Air Sealing and Efficient Ventilation System Option - R408.2.5 1.0 Required: 1 Proposed: 1 Name - Title Signature Date Compliance Statement: The proposed building design described here is consistent with the building plans, specifications, and other calculations submitted with the permit application. The proposed building has been designed to meet the 2021 IECC requirements in REScheck Version : REScheck-Web and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Project Title: 509 E LAMME Data filename:Page 3 of11 06/24/25Report date: Inspection Checklist Requirements: 100.0% were addressed directly in the REScheck software REScheck Software Version : REScheck-Web Text in the "Comments/Assumptions" column is provided by the user in the REScheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Energy Code: 2021 IECC Section # & Req.ID Pre-Inspection/Plan Review Plans Verified Value Field Verified Value Complies?Comments/Assumptions 103.1, 103.2 [PR1]1 Construction drawings and documentation demonstrate energy code compliance for the building envelope. Thermal envelope and energy compliance path represented on construction documents. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: 3/A2.2 103.1, 103.2, 403.8 [PR3]1 Construction drawings and documentation demonstrate energy code compliance for lighting and mechanical systems. Systems serving multiple dwelling units must demonstrate compliance with the IECC Commercial Provisions. Complies Does Not Not Observable Not Applicable Requirement will be met. 302.1, 403.7 [PR2]2 Heating and cooling equipment is sized per ACCA Manual S based on loads calculated per ACCA Manual J or other methods approved by the code official. Heating: Btu/hr_____ Cooling: Btu/hr_____ Heating: Btu/hr_____ Cooling: Btu/hr_____ Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: 509 E LAMME Data filename:Page 4 of11 06/24/25Report date: Section # & Req.ID Foundation Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 402.1.2 [FO1]1 Slab edge insulation R-value.R-_____ Unheated Heated R-_____ Unheated Heated Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 303.2, 402.2.10 [FO2]1 Slab edge insulation installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: 3/A2.2 402.1.2 [FO3]1 Slab edge insulation depth/length. _____ ft _____ ft Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 303.2.1 [FO11]2 A protective covering is installed to protect exposed exterior insulation and extends a minimum of 6 in. below grade. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: 3/A2.2 403.9 [FO12]2 Snow and ice-melting system controls installed to shut off system when pavement temperature > 50F and no precipitation. Complies Does Not Not Observable Not Applicable Exception: Requirement is not applicable. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: 509 E LAMME Data filename:Page 5 of11 06/24/25Report date: Section # & Req.ID Framing / Rough-In Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 402.1, 402.3.4 [FR1]1 Door U-factor.U-_____U-_____Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 402.1, 402.3.1, 402.3.3, 402.5 [FR2]1 Glazing U-factor (area-weighted average). U-_____U-_____Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 303.1.3 [FR4]1 U-factors of fenestration products are determined in accordance with the NFRC test procedure or taken from the default table. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: 5/A1.1 402.4.1.1 [FR23]1 Air barrier and thermal barrier installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: 3/A2.2 402.4.3 [FR20]1 Fenestration that is not site built is listed and labeled as meeting AAMA /WDMA/CSA 101/I.S.2/A440 or has infiltration rates per NFRC 400 that do not exceed code limits. Complies Does Not Not Observable Not Applicable Requirement will be met. 402.4.5 [FR16]2 IC-rated recessed lighting fixtures sealed at housing/interior finish and labeled to indicate ≤2.0 cfm leakage at 75 Pa. Complies Does Not Not Observable Not Applicable Requirement will be met. 403.3.1 [FR12]1 Supply and return ducts in attics insulated >= R-8 where duct is >= 3 inches in diameter and >= R-6 where < 3 inches. Complies Does Not Not Observable Not Applicable Requirement will be met. 403.3.4 [FR13]1 Ducts, air handlers and filter boxes are sealed with joints/seams compliant with International Mechanical Code or International Residential Code, as applicable. Complies Does Not Not Observable Not Applicable Requirement will be met. 403.3.7 [FR15]3 Building cavities are not used as ducts or plenums. Complies Does Not Not Observable Not Applicable Requirement will be met. 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: 509 E LAMME Data filename:Page 6 of11 06/24/25Report date: Section # & Req.ID Framing / Rough-In Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 403.3.2 [FR28]3 Ducts declared to be within the conditioned space are either 1) completely within the continuous air barrier and within the building thermal envelope, 2) buried within ceiling insulation in accordance with Section R403.3.6 and the air handler is located completely within the continuous air barrier and within the building thermal envelope and the duct leakage is <= 1.5 cfm / 100 square feet of conditioned floor area served by the duct system, or 3) the ceiling insulation R-value installed against and above the insulated duct >= to the proposed ceiling insulation R-value, less the R- value of the insulation on the Complies Does Not Not Observable Not Applicable Requirement will be met. 403.4 [FR17]2 HVAC piping conveying fluids above 105 ºF or chilled fluids below 55 ºF are insulated to ≥R- 3. R-_____R-_____Complies Does Not Not Observable Not Applicable Exception: Requirement is not applicable. 403.4.1 [FR24]1 Protection of insulation on HVAC piping. Complies Does Not Not Observable Not Applicable Exception: Requirement is not applicable. 402.4.6 [FR29]3 Electrical and communication boxes installed in the thermal boundary of the envelope sealed to limit air leakage between conditioned and unconditioned spaces. Complies Does Not Not Observable Not Applicable Requirement will be met. 403.5.2 [FR18]2 Hot water pipes are insulated to ≥R-3. R-_____R-_____Complies Does Not Not Observable Not Applicable Requirement will be met. 403.6 [FR19]2 Automatic or gravity dampers are installed on all outdoor air intakes and exhausts for mechanical ventilation systems. Complies Does Not Not Observable Not Applicable Requirement will be met. 403.6.1 [FR30]2 Ventilation systems in climate zones 7 & 8 shall utilize heat or energy recovery Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: 509 E LAMME Data filename:Page 7 of11 06/24/25Report date: Section # & Req.ID Insulation Inspection Plans Verified Value Field Verified Value Complies?Comments/Assumptions 303.1 [IN13]2 All installed insulation is labeled or the installed R-values provided. Complies Does Not Not Observable Not Applicable Requirement will be met. 402.1, 402.2.5, 402.2.6 [IN3]1 Wall insulation R-value. If this is a mass wall with at least ½ of the wall insulation on the wall exterior, the exterior insulation requirement applies (FR10). R-_____ Wood Mass Steel R-_____ Wood Mass Steel Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 303.2 [IN4]1 Wall insulation is installed per manufacturer’s instructions. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: 3/A2.2 Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: 509 E LAMME Data filename:Page 8 of11 06/24/25Report date: Section # & Req.ID Final Inspection Provisions Plans Verified Value Field Verified Value Complies?Comments/Assumptions 402.1, 402.2.1, 402.2.2, 402.2.6 [FI1]1 Ceiling insulation R-value.R-_____ Wood Steel R-_____ Wood Steel Complies Does Not Not Observable Not Applicable See the Envelope Assemblies table for values. 303.1.1.1, 303.2 [FI2]1 Ceiling insulation installed per manufacturer’s instructions. Blown insulation marked every 300 ft². Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: 3/A2.2 402.2.3 [FI22]2 Vented attics with air permeable insulation include baffle adjacent to soffit and eave vents that extends over insulation. Complies Does Not Not Observable Not Applicable Requirement will be met. Location on plans/spec: 3/A2.2 402.2.4 [FI3]1 Attic access hatch and door insulation ≥R-value of the adjacent assembly. R-_____R-_____Complies Does Not Not Observable Not Applicable Requirement will be met. 402.4.1.3 [FI17]1 Blower door test @ 50 Pa. <=5.0 ach in Climate Zones 1-2, and <=3.0 ach in Climate Zones 3-8. ACH 50 =_____ACH 50 =_____Complies Does Not Not Observable Not Applicable Requirement will be met. 403.3.5 [FI27]1 Ducts are pressure tested in accordance with ANEI/RESNET/ICC 380 or ASTME1554 to determine air leakage with either: Rough-in test: Total leakage measured with a pressure differential of 0.1 inch w.g. across the system including the manufacturer’s air handler enclosure if installed at time of test. Postconstruction test: Total leakage measured with a pressure differential of 0.1 inch w.g. across the entire system including the manufacturer’s air handler enclosure. _____ cfm/100 ft2 _____ cfm/100 ft2 Complies Does Not Not Observable Not Applicable Requirement will be met. 403.3.6 [FI4]1 Duct tightness test result of <=4 cfm/100 ft2 across the system or <=3 cfm/100 ft2 without air handler @ 25 Pa. Duct tightness <= 8 cfm/100 ft2 for ducts within thermal envelope. For rough-in tests, verification may need to occur during Framing Inspection. _____ cfm/100 ft2 _____ cfm/100 ft2 Complies Does Not Not Observable Not Applicable Requirement will be met. 403.3.4.1 [FI24]1 Air handler leakage designated by manufacturer at <=2% of design air flow. Complies Does Not Not Observable Not Applicable Requirement will be met. 403.1.1 [FI9]2 Programmable thermostats installed for control of primary heating and cooling systems and initially set by manufacturer to code specifications. Complies Does Not Not Observable Not Applicable Requirement will be met. 403.5.1 [FI11]2 Circulating service hot water systems have automatic or accessible manual controls. Complies Does Not Not Observable Not Applicable Requirement will be met. 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: 509 E LAMME Data filename:Page 9 of11 06/24/25Report date: Section # & Req.ID Final Inspection Provisions Plans Verified Value Field Verified Value Complies?Comments/Assumptions 403.2 [FI26]2 Hot water boilers supplying heat through one- or two-pipe heating systems have automatic outdoor setback control to lower boiler water temperature based on outdoor temperature, indoor temperature or water temperature sensing. Complies Does Not Not Observable Not Applicable Exception: Requirement is not applicable. 403.5.1.1 [FI28]2 Heated water circulation systems have a circulation pump. The system return pipe is a dedicated return pipe or a cold water supply pipe. Gravity and thermos- syphon circulation systems are not present. Controls for circulating hot water system pumps start the pump with signal for hot water demand within the occupancy. Controls automatically turn off the pump when water is in circulation loop is at set-point temperature and no demand for hot water exists. Complies Does Not Not Observable Not Applicable Requirement will be met. 403.5.1.2 [FI29]2 Electric heat trace systems comply with IEEE 515.1 or UL 515. Controls automatically adjust the energy input to the heat tracing to maintain the desired water temperature in the piping. Complies Does Not Not Observable Not Applicable Requirement will be met. 403.5.3 [FI31]2 Drain water heat recovery units tested in accordance with CSA B55.1. Potable water-side pressure loss of drain water heat recovery units < 3 psi for individual units connected to one or two showers. Potable water- side pressure loss of drain water heat recovery units < 2 psi for individual units connected to three or more showers. Complies Does Not Not Observable Not Applicable Exception: Requirement is not applicable. 403.6.2 [FI25]2 All mechanical ventilation system fans not part of tested and listed HVAC equipment meet efficacy and air flow limits per Table R403.6.2. Complies Does Not Not Observable Not Applicable Requirement will be met. 403.6.3 [FI33]2 Mechanical ventilation systems tested and verified to meet the minimum flow rates required by Section R403.6. Complies Does Not Not Observable Not Applicable Requirement will be met. 403.5.1.1. 1 [FI32]2 Demand recirculation water systems have automatic controls to start pump when hot water is requested. Complies Does Not Not Observable Not Applicable Requirement will be met. 404.1 [FI6]1 100% of permanent fixtures have high efficacy lamps. Complies Does Not Not Observable Not Applicable Requirement will be met. 404.1.2 [FI23]3 Fuel gas lighting systems have no continuous pilot light. Complies Does Not Not Observable Not Applicable Requirement will be met. 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: 509 E LAMME Data filename:Page 10 of11 06/24/25Report date: Section # & Req.ID Final Inspection Provisions Plans Verified Value Field Verified Value Complies?Comments/Assumptions 404.1.1 [FI35]3 Exterior lighting for multifamily buildings shall comply with Section C405.4. Complies Does Not Not Observable Not Applicable Requirement will be met. 404.2 [FI36]3 Permanent interior lighting shall be controlled with either a dimmer, occupancy sensor or other control built into the fixture. Complies Does Not Not Observable Not Applicable Requirement will be met. 404.3 [FI37]3 Exterior lighting >= 30 watts shall have the following controls: manual on/off switch with automatic shut-off, automatic shut-off in daylight hours, and controls that override automatic shutoff that returns to automatic control within 24 hours. Complies Does Not Not Observable Not Applicable Requirement will be met. 401.3 [FI7]2 Compliance certificate posted with building specifications and compliance path and results. Complies Does Not Not Observable Not Applicable Requirement will be met. 303.3 [FI18]3 Manufacturer manuals for mechanical and water heating systems have been provided. Complies Does Not Not Observable Not Applicable Requirement will be met. 408.2.5 [FI42]3 Improved Air Sealing: Air leakage <= 3.0 ACH50 combined with an Energy Recovery Ventilator >= Latent Recovery /Moisture Transfer (LRMT) or Heat Recovery Ventilator with >= 75% Sensible Recovery Efficiency (SRE). Complies Does Not Not Observable Not Applicable Requirement will be met. Additional Comments/Assumptions: 1 High Impact (Tier 1)2 Medium Impact (Tier 2)3 Low Impact (Tier 3) Project Title: 509 E LAMME Data filename:Page 11 of11 06/24/25Report date: 2021 IECC Energy Efficiency Certificate Insulation Rating R-Value 21.00Above-Grade Wall 0.00Below-Grade Wall 40.00Floor 60.00Ceiling / Roof _______Ductwork (unconditioned spaces): Glass & Door Rating SHGCU-Factor 0.410.23Window 0.400.30Door Heating & Cooling Equipment Efficiency _______Heating System:_________________________ _______Cooling System:_________________________ _______Water Heater:___________________________ Name:Date: Comments