HomeMy WebLinkAbout001 Cover Letter � '�O`�' A Pr�RT OF
MADISON /�
ENGINEERING ���NWC
�-� ENGINEERING
895 Technology Boulevard, Suite 203, Bozeman, MT 59718 �
January 27, 2026
City of Bozeman Planning Department
20 E Olive
Bozeman, MT 59715
RE: Gran Cielo Subdivision, Phase 3 Subdivision Preliminary Plat Resubmittal#2
Dear City of Bozeman,
On behalf of our client, Bozeman Haus, LLC, we are submitting a Preliminary Plat Application
Resubmittal for review of the proposed Gran Cielo Subdivision, Phase 3. The proposed major
subdivision consists of 40 single-family lots, 2 townhome lots, 1 multi family lot, and 1 open
space area for stormwater management. The site is located just south of Stucky Road and west of
South 27t"Avenue. Included in this submittal package are the following items:
Documents
001 Cover Letter
003 Project Notification Letter
004 Subdivision Preliminary Plat Checklist
006 Subdivision Information
008 Streets, Roads, and Grades
018 Landscape
O l 9 Irrigation
020 Surface Water
028 Water and Sewer
029 Stormwater Management
030 Streets, Roads, and Alleys
032 Land Use
036 Miscellaneous
Drawin�s
001 Preliminary Plat Cover Sheet
002 Preliminary Plat Overview
On behalf of our client, we are requesting concurrent construction due to unknown timing of the
development of the Lot 1, Block 4, site plan. Please let us know if the City deems this to be
adequate.
Please review the submitted material at your earliest convenience. If you have any questions or
need additional information, please feel free to contact us at .
895 Technology Blvd, Ste 203 ♦ Bozeman,MT 59718 ♦ (406)586-0262 ♦ Fax(406)586-5740
Sincerely,
WWC Engineering
�����
Henry Wilkey, EI
hwilkey�cuwwcen in� eerin .g coin
K:\Bozeman\Bozeman Haus LLC�2025380 Gran Cielo 1—Phase 3\11Regulatory\Application\Subdivision\Preliminary Plat