HomeMy WebLinkAbout25705_Wallace Works Sub_Initial Determination_ M r Subdivision Report
�:_,,,;,,,��„� i,� �;,,:._i�,�;,,;,,_.,,i Wallace Works Subdivision
Application No. 25705
04/21/2026
pplication No. 25705 Ype ubdivision
Project Name allace Works Preliminary Plat Subdivision
ummary proposed subdivision for dividing a lot into two lots within the Northeast
Historic Mixed-Use Zoning District. The site is currently under an approved
ite Plan Applications (SP 22156 and SP 24532) and subsequent
Modification Application (MOD 24174). The proposed structures associated
ith this site have been reviewed and approved under their respective plan
applications and this subdivision proposes to divide the lot and provide
respective easements for the parcels in the Wallace Works Subdivision.
oning NEHMU rowth Polic Community Parcel Size 1.475 acres (64,266
Commercial Mixed sqft)
Use
verlay District(s) Neighborhood Conservation District Overlay (NCOD)
treet Address 803 Wallace Avenue
Legal Description Lot A of the Amended Plat of Lots 2 and 3 of Plat C-23-A18 and
Lot 2 of plat C-23-A16, and Tract 1 of Minor Subdivision No. 3, located in the
Southeast Quarter of Section 6, Township 2 South, Range 6 East, located in
P.M.M., City of Bozeman, Gallatin County, Montana
wner allace Works LLC, Erik Nelson, PO Box 1026, Bozeman, MT 59771
pplicant Intrinsik Architecture,Tyler Steinway, 106 E Babcock Suite 1 A, Bozeman, MT
59715
Representative Same as Applicant
Pre-Application File
Review 25311
Noticing Public Comment Period Site Posted Date Required Mail
4/27/2026-5/18/2026 /24/2026 NA
Initial Determination Review Authority Date Determinations
City of Bozeman, 3/9/2026 The application is complete and is in
Director of Community substantial compliance with all applicable
Development regulations and the zoning map.
All impacts resulting from the proposed
development have previously been
analyzed and made available for public
review during adoption, amendment, or
update of the land use plan, subdivision
and zoning regulation, or zoning map
Full application and file of record: Community Development Department, 20 E. Olive St., Bozeman, MT
59715
Digital application access located online in the City's Laserfiche Repository for�plication 25705
Page 1 of 12
M r Subdivision Report
�:_,,,;,,,��„� i,� �;,,:._i�,�;,,;,,_.,,i Wallace Works Subdivision
Application No. 25705
04/21/2026
CONDITIONS OF APPROVAL
1. The plat shall conform to all requirements of the Bozeman Municipal Code and the Uniform
Standards for Monumentations, Certificates of Survey, and Final Subdivision Plats (25.183.1101
ARM, 25.183.1104 ARM, 25.183.1107 ARM)) and must be accompanied by all required
documents, including certification from the City Engineer that as-built drawings for public
improvements were received, a platting certificate, and all required and corrected certificates.
The Final Plat application must include one (1) signed reproducible copy on a 3 mil or heavier
stable base polyester film (or equivalent). The Gallatin County Clerk& Recorders office has
elected to continue the existing medium requirements of 1 mylar with a 1 binding margin on one
side for both plats and COSs. The Clerk and Recorder will file the new Conditions of Approval
sheet as the last same sized mylar sheet in the plat set. (Staff report Section 4)
2. The applicant must add the following notes to the conditions of approval sheet of the plat
related to stormwater maintenance on the property:
a. The property owners association shall be responsible for the maintenance of all
stormwater infrastructure located outside the public right-of-way. The property owners
association shall be responsible for levying annual assessments to provide for the
maintenance, repair, and upkeep of all stormwater infrastructure located outside the
public right-of-way. (Staff Report Section 5.10)
CODE PROVISIONS
1. Sec. 38.100.080 - Compliance with regulations required. The applicant is advised that unmet
code provisions,or code provisions that are not specifically listed as conditions of approval,does
not, in any way, create a waiver or other relaxation of the lawful requirements of the Bozeman
Municipal Code or state law.
2. Sec. 38.710.050.A.5.c. - Noxious Weeds. Prior to final plat approval, a memorandum of
understanding must be entered into by the weed control district and the developer. The
memorandum of understanding must be signed by the district and the developer prior to final
plat approval, and a copy of the signed document must be submitted to the community
development department with the application for final plat approval. (Staff Report Section 5.5)
3. Sec. 38.750.150. - Plat Certificates. The language contained in the certificates on the final plat
must follow the language in the corresponding certificates in this code section. (Staff report
Section 4)
4. Sec. 38.780.090 - Development or Maintenance of Common Areas and Facilities by Developer
and Property Owners'Association. The subdivision's stormwater maintenance plan must
clearly state the following condition. "The property owners association (Insert Final Property
Owners Association Name as recorded in the CC&Rs) shall be responsible for the maintenance
of all stormwater management facilities located outside of the public right-of-way." The
approved stormwater plan must be incorporated into the property owners' association
documents and a copy of the documents demonstrating the inclusion of the stormwater
maintenance plan must be provided prior to final plat approval. (Staff Report Section 5.10)
Page 2 of 12
M T Subdivision Report
�:_,,,;,,,��„� i,� �;,,:._i�,�;,,;,,_.,,i Wallace Works Subdivision
Application No. 25705
04/21/2026
5. Sec. 38.410.060. - Easements. All Easements indicated below must be prepared as separate
documents from the final plat with an exhibit. Signed hard copies of the easements must be
filed with the County Clerk and Recorder's office prior to final plat approval.
a. The final plat must provide all necessary utility easements, and they must be described,
dimensioned and shown on each subdivision block of the final plat in their true and
correct location.
b. Prior to final plat approval,the applicant must provide a private utility easement to allow
the owner of building E to repair the water service lines across the adjacent lot up to the
Tamarack ROW.
c. Prior to final plat approval,the applicant must provide a mutual access easement.
d. Prior to final plat approval,the applicant must provide a mutual drainage easement.
Page 3 of 12
M T Subdivision Report
�:_,,,;,,,��„� i,� �;,,:._i�,�;,,;,,_.,,i Wallace Works Subdivision
Application No. 25705
04/21/2026
Figure 1: Current Zoning Map
rr T�}�' '� :�
�_ � y _ }
. ..M_.�r , . .,
f�I \�I�H\P A-�I
��! ~ `•;� � ... ,,.;�,,�i,: , � `Y
�F � � . � ,��.
j .. �.y'� ' �� _ �
:. , �
a� �'+
�: �. • - � ' .
I , T
�
. .
- ` � �,, T1
�' - ' �
•• �
c.'. . 1.tt• �
-� � � � . R-�M
� �. ,
NEHMU ' `��.' ; �! ; ' ,
. ' ��i`r r' _ • �
,
I ..0 � � �
, � �� � -
! �� � � ' • •
l ` f �
+r�� r
�. �
r ;�;'�' � , " " �.
.� , ' - . . ' � ��
.�. � _ ..... � � _ � �r
�,y.,,, , , � ,�i�. i
G �'a�r r�Dro;.� . �`
'� , � w � � \
`� , � � ' f �
_ ��_ , r / _ t d (. • —
S
. . ��.l��.IIC ����i��
� �'"�� f'roposed Prcliminary Plat
- ���� Applicatiun 25705
t _ „ „ .r._ �OZEMAN"'
�,a,,,,.,,
��M
Page 4 of 12
� O O N �
O •
G�i �� N � �
� "O N �
O � z �
0
•y � O
� Y ;_,
O �
�Q � '�
y V Q "^""s-` y� WALLACE WORKS MINOR SUBDIVISION N0._ .,.�...m.........
� Q �> � . Oe��. � re. �n i w w��.s e n'�e.ni'r.nc sme n�iw a'r'n d�i�w'ic���'..•• � �
� ���vvna��a�r�re u.ar.uwr�uc �0n1m w M fY�M/Y O/APtlIM�G�i�b�tYM.�iMr�MQ�IM.w/ ,�a�=r
�� s�i���
r+ir�r��.r�w���a�-w wra�r�rrr� �� �. i`� —.-_-- ���
w�"' aaw ., c- -
......��.4..�.�..�..,.. ......�.......,.. + . _ _._
.....�.�............._.:. ........-._-..�... .:�x:7 ----- ----��---r----.Rx.�� ,< ,...,.....�.�.......rr..
� n..�,d..�....,.. �........�,e�e.e�.e� „�t15"� li��---t"�.�"� I�'S7' ,,..�._.......�....�..�.�...�„�
� v( � �t v�z� �".m
a -.�..._....._ -_____..._..__. I � t_� -�- `' � ..,a�;�������:e.�.:
...,r�_ -
>+ !� 3 �i � ' ' '�:� �.._,�.._.�..._
� °_'—`._� � �� � �;, s; ' �� _.._., t.�,�
.� .,.-.� � , � �;�z.-- �� � � —_--___.......w
�:� ',;_--!-- -�
_,�.
,_ .,. .., :... �. �
.�,...__.... �....._......._ -, _
_ — :
,
._._.._
_.__..-.__.. .. :. .....�.,
� w._.,.._...._......�.. _.... � �;�ss
�
r......._ ' !
el
L .�,.�,.� »........�................. •� � � �
• , 9 �
a __._�-_-�- -v -- --� ,
�
� ��.,.,a,..o e----�-
�. --- ------ - ,�_
�y '�-"`_'- ,�r. 3 _� --- �..:._...........::...;,�.F-:..�
� .�----- �, _ -�- - - �� ��-, .�
b�p ___..._?�:"'.�=�:�..._. �4 v � —�I �o ��'
�y ....._�. '' — — - �'�� ..«. •.._.....�,....._.�..
� l
— a..... ��� .=.a� ....._.. �
.�.�.
q��wrr
.. r.������ t 1 ������M
.....��......,.. �+�..�...........« � 3 I c�"""—'`�"��—�'':..�
""''-'�v'°-�-� �SSCa" ,SX:TS ��r
� :u� �'.w.._.� 5��,.5.: �
� "'\
- — ---------�-- ------�ra��.�e+-'------- —
-------�--t'. � ' sc.<<
� �.L. - /�..�L I»�" -
. �
�
� �
___ ,......_. � :
� -- ___ ____________ _ ____ ____ .-__
�w..J6,^.'Z.�� __
� ��'__'_���".�
� _ .fY. u�:—...i.r..�.�,jiYr I .. - . ..... . ..
4�
�" —
� -
� �
"'� Subdivision Report
�:_,,,;,,,��„� i,� �;,,:._i�,�;,,;,,_.,,i Wallace Works Subdivision
Application No. 25705
04/21/2026
Subdivision determination and record 38.750.090, BMC
This analysis and its resulting findings are based on the entirety of the application materials, the
Bozeman Municipal Code and associated standards, plans, and all other materials available during
the initial review period. Collectively, this information is the record of the review. In establishing the
record of review, the Director of Community Development and the Development Review Committee
reviewed the application against the following standards.
The applicable review authority for subdivisions is the Director of Community Development in their
role as planning administrator.
Each City Division listed here under is a member of the Development Review
Committee (DRC). This Committee reviews development applications for all
criteria relevant to their respective division. Each division is assigned a 2 to 4
letter code, shown to the left of the division name. Throughout the staff report,
these codes will indicate which division led the review of the given criterion.
Please note that while an one or a couple divisions may lead review of a given
criterion,the entire DRC plays a role in each determination.
� . Development Review Committee
. Planning and Zoning
Engineering/Transportation/Utilities
. Parks and Recreation
Community Housing
Water Adequacy
. Fire
• � Building
.
Water Conservation
� Forestry
Page 6 of 12
Subdivision Report
�:_,,,;,,,��„� i,� �;,,:._i�,�;,,;,,_.,,i Wallace Works Subdivision
Application No. 25705
04/21/2026
The City of Bozeman adopted the Bozeman Community Plan (the Future Land Use Plan) including the
Future Land Use Map on October 28th, 2025, by Resolution Number 2025-71. The Bozeman
Community Plan was made available for public review and comment prior to adoption and identified
and analyzed impacts of development. Notice was provided that the Bozeman Community Plan is the
basis for implementing land use regulations as required in 76-25-106, MCA.
Issue plans including but not limited to the Transportation Master Plan,the Parks, Recreation, and
Active Transportation Plan,the Sewer Facility Plan, Water Facility Plan, Stormwater Facility Plan, and
Fire Protection Master Plan were all considered and incorporated by reference in adoption of the
Bozeman Community Plan.
The Unified Development Code, contained in Chapter 38 of the Municipal Code, is the primary
implementing regulation for the Bozeman Community Plan and was adopted on December 16, 2025
through Ordinance 2025-12/2151. The Bozeman Community Plan and supporting issue plans were
utilized in consideration and adoption of the Unified Development Code. The City Commission found
that the Unified Development Code was in substantial compliance with the Bozeman Community Plan.
The Unified Development Code provides specific zoning and subdivision regulations as well as the
zoning designation which determined the allowable criteria for review of the subdivision of the subject
property.
During adoption of the Unified Development Code, issue plans and the Bozeman Community Plan
were utilized to anticipate impacts of potential development. As such, city wide impacts resulting
from the proposed development were previously analyzed and made available for public review and
comment during the adoption of the land use plan including all issue plans, and adoption of zoning
regulations, subdivision regulations, and all subsequent amendments to the identified documents.
Zoning designations throughout the city were implemented to ensure that individual impacts to a
given site from a proposed development will fit into the framework of the previously considered city
wide impacts. Subdivision review ensures that site-specific impacts have been addressed with the
materials submitted with this application and are available for public review. Any development which
conforms with the standards of Montana Code Annotated and Bozeman Municipal Code has
addressed all site-specific impacts.
The following report reviews the subject property for compliance with the criteria and regulations
adopted by the State of Montana and the City of Bozeman.
1. Conformance with MCA 76-25-408 � � Meets Code?
Application contains sufficient information for review Yes
Submittal requirements of 38.710.040 Yes
Comments: The application was submitted with the required materials and review fee. Pursuant to
MCA 76-25-408,the planning administrator reviewed the submission and determined that the
application contained sufficient information to proceed with review. This determination confirms
completeness but does not ensure approval of the subdivision.
Page 7 ot 12
M r Subdivision Report
�:_,,,;,,,��„� i,� �;,,:._i�,�;,,;,,_.,,i Wallace Works Subdivision
Application No. 25705
04/21/2026
2. Exemptions from Subdivision Review MCA 76-25-402 - Meets Code?
The division of land must not qualify for an exemption from subdivision review Yes
Comments: The proposed land division does not qualify for any exemption listed in MCA 76-25-
402, including divisions created by court order, mortgage security parcels, or other exempt
divisions. Therefore,the subdivision must undergo full subdivision review under state law and the
Bozeman Municipal Code.
3. Effect of Preliminary Plat Approval MCA 76-25-409 � Meets Code?
Preliminary plat approval establishes the approved subdivision layout and Yes
conditions for final plat approval.
Comments: Approval of the preliminary plat authorizes the subdivision layout as proposed and
establishes conditions that must be satisfied prior to final plat approval. Final plat approval will
verify that the subdivision has satisfied all conditions and infrastructure requirements established
during preliminary plat review.
4. Compliance with MCA 76-25-408(12) � � Meets Code?
4.1 Meets the requirements and standards of this chapter Yes
4.2 Meets the survey requirements provided in 76-25-412(1) Yes
4.3 Provides the necessary easements within and to the proposed subdivision Yes
4.4 Provides the necessary legal and physical access to each parcel Yes
Comments: The Development Review Committee has reviewed the submitted materials for
compliance with all standards of MCA Title 76 Chapter 25. The preliminary plat conforms to the
provisions of the Montana Land Use and Planning Act if it contains all elements required to meet
state survey requirements, which would be determined when it is reviewed by the Gallatin County
Examining Land Surveyor prior to the final plat approval. Conditions provided ensure that the
proposed subdivision provides all necessary easements and that each lot has the required legal
and physical access. Condition #1 and Code Provision #3 ensure that the plat will comply with all
survey requirements. Code Provision #5 requires that the plat include all the necessary easements
including mutual access and storm drainage easements to allow the subdivision to be consistent
with the approved development that is being constructed on site.
5. Documentation of Compliance with Adopted Standards BMC 38.710.050. Meets Code?
5.1 Surface Water (BMC 38.710.050.A.1) waived
Comments: There is no surface water associated with or in proximity to the site. Therefore,the
Development Review Committee granted a waiver to these submittal requirements during the
subdivision pre-application review.
5.2 Floodplains (BMC 38.710.050.A.2) waived
Comments: The subject property is wholly outside of the 100-year floodplain. The property is
depicted on the Flood Insurance Rate Map (FIRM) panel 30031 C0809E with an effective date of
April 21, 2021. The property is designated as Zone X, an area of minimal flood hazard. Therefore,
Page 8 of 12
M T Subdivision Report
�:_,,,;,,,��„� i,� �;,,:._i�,�;,,;,,_.,,i Wallace Works Subdivision
Application No. 25705
04/21/2026
the Development Review Committee granted a waiver to these submittal requirements during the
subdivision pre-application review.
5.3 Groundwater (BMC 38.710.050.A.3) yes
A groundwater investigation was completed March of 2020 and provided in the Geotechnical
Report by TD&H and was stamped and signed by a professional engineer. The geotechnical report
(Document 016, pg 3) states, ';4 geotechnical excavation investigation was conducted at the site on
March 5th, 2020. Groundwater was observed from depths of approximately 14 feet below existing
grade in test pits with depths of 15.1 to 20.9 feet. Further groundwater monitoring was performed
from March 16th, 2020, to July 22nd, 2020, seasonally-high groundwater was found to peak at 9.8 feet
below existing grade during this observation period. Therefore, it is anticipated that groundwater will
be sufficiently deep to allow for a full retention/infiltration strategy to be successful at this site."Given
the average depth of groundwater in the vicinity, it is anticipated that this subdivision will not
impact groundwater.
5.4 Geology(BMC 38.710.050.A.4) yes
Comments: This subdivision will not significantly impact the geology, soils, or slopes. No
significant geological features or slopes exist on the site. A geotechnical investigation report was
provided by TD&H and has been stamped and signed by a professional engineer registered in the
State of Montana and reviewed by the Engineering Division for compliance with City standards
5.5 Vegetation (BMC 38.710.050.A.5) � waived
Comments: The proposed subdivision is occurring on an infill site, previously platted in 1883 as the
Plat of the Northern Pacific Addition to the City of Bozeman, which has previously been wholly
developed. There is no vegetation on site. Therefore,the Development Review Committee granted
a waiver to these submittal requirements during the subdivision pre-application review. As no weed
control plan was submitted or indicated to have been entered into,the developer must enter into a
Noxious Weed Management Plan per BMC Section 38.710.050.A.5.c. (Code provision #2)
5.6 Wildlife (BMC 38.710.050.A.6) � waived
Comments: The proposed subdivision is occurring on an infill site, previously platted in 1883 as the
Plat of the Northen Pacific Addition to the City of Bozeman, which has previously been wholly
developed and centrally located within city limits. Therefore,the Development Review Committee
granted a waiver to these submittal requirements during the subdivision pre-application review.
5.7 Agriculture (BMC 38.710.050.A.7) � waived
Comments: The proposed subdivision is occurring on an infill site, previously platted in 1883 as
the Plat of the Northen Pacific Addition to the City of Bozeman which, has previously been wholly
developed. There is no agricultural activity on site or in the vicinity of the site. Therefore,the
Development Review Committee granted a waiver to these submittal requirements during the
subdivision pre-application review.
5.8 Agricultural Water User Facilities (BMC 38.710.050.A.8) waived
Page 9 of 12
M r Subdivision Report
�:_,,,;,,,��„� i,� �;,,:._i�,�;,,;,,_.,,i Wallace Works Subdivision
Application No. 25705
04/21/2026
Comments: The subject property does not contain any agricultural water user facilities.
Therefore,the Development Review Committee granted a waiver to these submittal requirements
during the subdivision pre-application review.
5.9 Water and Sewer (BMC 38.710.050.A.9) yes
Comments: The subdivision will not significantly burden the city's water and sewer infrastructure
with the recommended conditions of approval and code provisions. Document 014 contains the
preliminary design report for water systems improvements and sanitary sewer system
improvements in the proposed subdivision, stamped by a professional engineer licensed in the
State of Montana. The Engineering Division reviewed both reports for compliance with state and
local Public Works Standard Specifications,the City's design standards,the City of Bozeman Water
Facility Plan, and the City of Bozeman Fire Service Line Standard and found to meet with code
provisions and the City's review requirements.
Currently, municipal water services exist within the adjacent right of way along East Tamarack
Street and North Wallace Avenue. The development proposed as a part of the active site plans
(separate applications) on record are providing connections to the city water mains. This
subdivision does not require any upgrades or extensions to the existing water infrastructure, which
provides service subject property.
There is an existing sewer main within East Tamarack Street. The development proposed as part of
the active site plans (separate applications) recently upsized the existing sewer main within the
right of way along East Aspen Street to provide adequate sewer capacity to the subject property.
This subdivision does not require any upgrades or extensions to the existing sanitary sewer
infrastructure which provides service subject property.
5.10 Stormwater Management (BMC 38.710.050.A.10) yes
Comments: A preliminary stormwater design report was prepared by a professional engineer with
TD&H and is located under application document 014 and 015. Due to the history of the
surrounding developments,the majority of the necessary infrastructure has been installed prior to
this subdivision application. The proposed subdivision itself does not add any additional
impervious surface and as such stormwater management will only occur as it relates to ensuring
appropriate maintenance of the approved stormwater facilities associated with their respective site
plans.
Code provision #4 details the required maintenance agreement to be implemented by the property
owners' association and requires the property owners' association to maintain all stormwater
facilities outside of the public right-of-way,with the incorporation of a maintenance plan into the
association documents prior to final plat approval. This will ensure the proper maintenance of
necessary stormwater infrastructure as the subdivision is developed and occupied. An associated
plat note must be provided on preliminary plat sheet 3 to notify future property owners of the
property owners' association requirements for ongoing maintenance of these stormwater facilities.
(Condition #2)
5.11 Transportation Facilities (BMC 38.710.050.A.11) yes
Comments: The subdivision will not significantly impact the City's street infrastructure and will
provide adequate improvements to support the proposed development and nearby areas by
Page 10 of 12
M T Subdivision Report
�:_,,,;,,,��„� i,� �;,,:._i�,�;,,;,,_.,,i Wallace Works Subdivision
Application No. 25705
04/21/2026
improving adjacent local streets and providing improved multi-modal transportation to and from
the site.
The proposed subdivision is bound by two local streets and one collector. East Aspen Street and
North Wallace Avenue are local streets which bound the property to the south and east
respectively. East Tamarack Street is a collector which bound the property to the north. Currently
there is an access to the site from North Wallace Avenue. No additional access is necessary to
create the additional lot.
A Traffic Impact Study (TIS) dated March 2022, stamped and signed by a professional engineer,
was provided in document 004 and evaluated by the reviewing engineer for compliance with
adopted design standards and code requirements. The TIS describes impacts to the site from full
build out of the proposed Site Plans, limited impact to transportation facilities is expected from this
subdivision.
5.12 Non-municipal Utilities (BMC 38.710.050.A.12) � waived
Comments: Non-municipal utilities have been installed as a part of the preceding site plan
applications. Therefore,the Development Review Committee granted a waiver to these submittal
requirements.
5.13 Land Use (BMC 38.710.050.A.13) � yes
Comments: The subject property is under active approval for two Site Plans to construct 5
buildings with a total of 65 residential units on site. Two of the residential buildings will have
ground floor commercial space. These buildings were reviewed and approved through the site
planning process and comply with the minimum requirements of the NEHMU zoning district.
5.14 Parks and recreation facilities (BMC 38.710.050.A.14) � • � waived
Comments: The proposed subdivision is only creating one new lot,which is exempt from park land
dedication requirements per Montana Code Annotated, 76-25-404(6)(a)(iv). Therefore,the
Development Review Committee granted a waiver to these submittal requirements during the
subdivision pre-application review.
5.15 Neighborhood Center Plan (BMC 38.710.050.A.15) � waived
. . .
Comments: To provide a neighborhood focal point, all residential subdivisions that are ten net
acres in size or greater must have a neighborhood center. The proposed subdivision is 1.475 net
acres and,therefore, is exempt from the requirement of a neighborhood center. Therefore,the
Development Review Committee granted a waiver to these submittal requirements during the
subdivision pre-application review.
5.16 Lighting Plan (BMC 38.710.050.A.16) yes
Comments: Subdivision or street lighting is required pursuant to BMC 38.570.030. With the
application,the applicants submitted documentation showing that the site has already entered into
a waiver of right to protest the creation of a special improvement district which includes
improvements relating to lighting within the public right of way. This was created due to the active
Page 11 of 12
M r Subdivision Report
�:_,,,;,,,��„� i,� �;,,:._i�,�;,,;,,_.,,i Wallace Works Subdivision
Application No. 25705
04/21/2026
Site Plans. As such, all lighting for the site complies with minimum standards of Bozeman
Municipal Code.
5.17 Miscellaneous (BMC 38.710.050.A.17) � Waived
Comments: The proposed subdivision is not located within 200 feet of any public land access or
within a delineated Wildland Urban Interface area. No health or safety hazards on-site or off-site
will be created with this development. Therefore,the Development Review Committee granted a
waiver to these submittal requirements during the subdivision pre-application review.
5.18 Affordable Housing (BMC 38.710.050.A.18) waived
.
Comments: The subject property is associated with two site plan applications and a Modification
to the site plan applications. While the subsequent development provides and relies on Affordable
Housing incentives,this application does not rely on incentives authorized in 38.380. Therefore,
the Development Review Committee granted a waiver to these submittal requirements during the
subdivision pre-application review.
5.19 Water Rights (BMC 38.710.050.A.19) � yes
Comments: In review of the application,the Bozeman Water Adequacy Division found that the
proposed subdivision would not increase water usage onsite. Therefore,there would be no impacts
to water use and no cash in lieu would be required at the time of subdivision. Future development
on site may increase water use and could trigger the need for cash in lieu of water rights be paid to
offset water usage.
6. Substantiative Comment from Affected Parties (38.750.080) � Meets Code?
Public Comment n/a
Comments: This is the initial project decision. Public notice will occur from 4/27/2026-5/15/2026.
This section will be updated after the noticing period.
Page 12 of 12